Welding Process Deposition Efficiency and Operating Factor Reference
Weld cost estimates depend on two multipliers that people guess at: how much of the filler ends up in the joint, and how much of the clock the arc is burning. This table gives planning ranges by process so you start from a defensible number.
| Process | Variant | Typical deposition efficiency | Typical operating factor | Typical deposition rate | Shielding | Estimating note |
|---|---|---|---|---|---|---|
SMAW | Stick, E7018 low hydrogen | 55 to 65 percent | 15 to 30 percent | 2 to 4 lb/hr | Flux coating | Stub loss and coating weight lower the yield. Good for field and repair work. |
SMAW | Stick, E6010 or E6011 | 55 to 65 percent | 15 to 30 percent | 1.5 to 3 lb/hr | Flux coating | Common for root passes on pipe. Slower fill rates. |
GMAW | Solid wire, short circuit | 90 to 95 percent | 25 to 45 percent | 2 to 5 lb/hr | Argon CO2 mix or CO2 | Thin sheet and out of position work. Watch lack of fusion on thick sections. |
GMAW | Solid wire, spray transfer | 95 to 98 percent | 25 to 50 percent | 6 to 12 lb/hr | Argon rich mix | Flat and horizontal positions only. Low spatter, high yield. |
GMAW | Pulsed spray | 95 to 98 percent | 30 to 50 percent | 3 to 8 lb/hr | Argon rich mix | Used for aluminum and out of position steel. Higher equipment cost. |
FCAW | Gas shielded flux cored | 80 to 90 percent | 25 to 45 percent | 5 to 15 lb/hr | CO2 or Ar CO2 mix | High deposition, good for structural fill. Slag removal adds time. |
FCAW | Self shielded flux cored | 75 to 85 percent | 20 to 40 percent | 4 to 12 lb/hr | Flux core only | Field work without gas. Fume and spatter are higher. |
MCAW | Metal cored wire | 92 to 98 percent | 30 to 55 percent | 6 to 15 lb/hr | Argon rich mix | Little slag, so less cleanup. Common on robotic cells. |
GTAW | Manual, cold wire | 95 to 100 percent | 10 to 25 percent | 0.5 to 2 lb/hr | Argon or Ar He | Highest quality and slowest. Wire waste is the end of each rod. |
GTAW | Mechanized hot wire | 95 to 100 percent | 40 to 70 percent | 3 to 8 lb/hr | Argon | Orbital and cladding applications. |
SAW | Single wire | 95 to 100 percent | 40 to 70 percent | 8 to 20 lb/hr | Granular flux | Flux is consumed at roughly one to one with wire. Flat and horizontal only. |
SAW | Tandem or multi wire | 95 to 100 percent | 50 to 80 percent | 20 to 50 lb/hr | Granular flux | Heavy plate, vessels and girders. Needs tight fit-up. |
GMAW or FCAW | Robotic cell | As for process | 50 to 80 percent | As for process | As for process | Operating factor depends on load and unload time and part variety. |
ESW | Electroslag welding | Close to 100 percent | 50 to 80 percent | Over 30 lb/hr | Slag pool | Very thick sections in a single pass. Specialized equipment. |
Planning ranges commonly cited in welding cost literature, not guarantees. Actual values depend on wire diameter, current, position, shop layout and welder skill. Always replace these with timed data and consumable weighings from your own shop before quoting.
Replace ranges with your own shop data
Optional review of how to derive efficiency and operating factor by process from your ERP records.
Optional. The tool and every export work without this. No spam.
How to use it
Search by process or variant and read the typical deposition efficiency and operating factor. Use efficiency to convert deposited weld metal into filler to buy, and operating factor to convert arc time into paid labor time. Feed both numbers into the weld job labor cost calculator or your own spreadsheet.
Definitions
Deposition efficiency is the weight of weld metal in the joint divided by the weight of electrode consumed. Losses come from spatter, stub ends, slag and, for flux cored wires, the non-metallic core. Operating factor is arc-on time divided by total paid welding time. Deposition rate is pounds of weld metal per arc hour.
- Stick electrodes lose the unused stub and the coating weight
- Solid wire is the most efficient of the wire processes
- Operating factor is driven by fixturing and handling more than by process
Reading the table
A process with a high deposition rate but low operating factor can cost more per pound deposited than a slower, better organized one. That is why submerged arc and mechanized setups pay off only when parts, fixtures and material flow keep the arc running.
Limits of the numbers
These are broad ranges. A shop with positioners can double the operating factor of a similar shop without them. For quotes, take timed samples, weigh wire spools before and after, and store the results in your ERP by product family.
Frequently Asked Questions
Why is stick welding efficiency so low?
Part of every electrode is the flux coating and the stub that cannot be used. Together with spatter and slag, that leaves roughly 55 to 65 percent of purchased weight in the weld.
Does flux cored wire need a different efficiency?
Yes. Part of the wire weight is the flux core, which becomes slag or gas, so gas shielded flux cored wire sits around 80 to 90 percent and self shielded wire a little lower.
What is a good operating factor?
It depends on the work. Manual welding of varied parts is typically low, while fixtured repetitive work or automated cells can approach 50 percent or more. Measure yours instead of assuming.
Can I use these for aluminum or stainless?
The ranges are mainly for carbon steel. Aluminum and stainless use similar efficiency logic but different gases, travel speeds and cleaning time, so use your own data for those.
Netray can help pull actual wire usage and labor hours from your ERP so these ranges are replaced by your measured values.
Related Tools
Weld Job Labor Cost and Operating Factor Calculator
Compute total cost per welded part and per job from weld metal weight, operating factor, labor rate, overhead, filler and gas.
Industry TemplatesWelding Wire Deposition Rate Calculator
Convert wire feed speed and diameter to wire consumed and weld metal deposited per hour, and size wire purchases for a job.
Supply Chain & InventoryFiller Metal Consumption Calculator (Wire and Electrodes)
Turns weld metal per meter, joint length and deposition efficiency into kilograms of filler to buy and the number of spools or boxes.
Industry TemplatesStick Electrode Consumption and Stub Loss Calculator
Work out how many stick electrodes and how many kilograms to buy for a given weld metal weight, including stub loss and yield.
Industry TemplatesWelding Shielding Gas Selection Reference
Lookup table of typical shielding and purge gases by welding process and base metal, with effect and caution notes.
More Engineering & PLM tools
See all- Weld Shrinkage and Distortion Allowance Calculator
- SAP Super BOM Design Worksheet
- SAP Engineering Change Number Checklist
- SAP Document Info Record Template
- SAP Change Master and Revision Level Log
- SAP Engineering Change Request (ECR) Template
- SAP BOM Usage and Item Category Reference
- SAP Engineering Change Obsolescence Exposure Calculator
- SAP Engineering Change Affected Materials Impact Worksheet
Keep exploring
Free tools
- Welding Wire Deposition Rate CalculatorConvert wire feed speed and diameter to wire consumed and weld metal deposited per hour, and size wire purchases for a job.
- Weld Job Labor Cost and Operating Factor CalculatorCompute total cost per welded part and per job from weld metal weight, operating factor, labor rate, overhead, filler and gas.
- Welding Heat Input CalculatorCompute arc energy and net heat input from amps, volts, travel speed and process efficiency, and see how speed changes the result.
Guides
- How to Estimate Welding Cost for a Fabrication QuoteHow fabricators estimate welding cost: weld volume, deposition rate, arc-on time, filler efficiency, and where AI helps pull actual hours from past jobs.
- Weld Documentation and Compliance for Metal Fabrication ShopsWPS, PQR, welder qualification, CWI sign-off and material certs: what fabricators must document for AWS D1.1, D9.1 and customer audits, and how to track it.
AI on your ERP
- AI for E2 Shop System in Metal Fabrication: Quote History, Material Yield and Delivery RiskPrivate AI for E2 Shop System fabricators: sheet and plate quoting history, nesting yield, welding job costs and delivery risk, answered from your own data.
- AI for Dynamics 365 Business Central in Metal FabricationPrivate AI for Business Central metal fabricators: quote-to-job costing, heat-lot traceability, outside processing and remnant stock grounded in your data.