Wellhead and Christmas Tree Factory Acceptance Test (FAT) Template

A factory acceptance test record is the proof package customers expect before wellhead or tree equipment leaves the shop. This template structures the pre-test checks, pressure tests, function tests and sign-off so the data book is complete the first time.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

Wellhead and Christmas Tree Factory Acceptance Test Template

Factory Acceptance Test Record

Manufacturer: Basin Wellhead Systems LLC Customer: Operator Energy Co PO / Contract: PO 7714-22 Serial number: XT-2026-0087 Description: 5-1/8 in 10,000 psi single master tree assembly Specification: API Spec 6A, PSL 2, PR1, temperature class per datasheet Date: 2026-10-19 Witness: Customer

Test Basis

Rated working pressure: 10000 psi Test medium: Water with corrosion inhibitor Hold time: 15 minutes per test

Pre-Test Verification

CheckReferenceResultInitials
Assembly matches drawing and BOMDrawing / BOM
Material and traceability records on fileMTR / PMI
Gauges and recorders calibratedCal certificates
Dimensional and bore checkInspection report

Pressure Tests

TestTest pressure (psi)Start timeEnd timePressure heldLeak observedAccept
Body hydrostatic
Seat / gate test
Gas test (if required)
Annulus and ring joint test

Function Tests

ItemOperationResultInitials
Master valveOpen and close cycles, torque or turns recorded
Wing valveOpen and close cycles
Actuator / control lineResponse and pressure

Observations

No visible leakage during hold periods. Gauges calibrated and certificates attached.

Acceptance

Test engineer / Date
Quality representative / Date
Customer / third party witness / Date

Test pressures, hold times and acceptance rules come from your governing specification and the customer's datasheet. Enter the numbers from those documents rather than relying on defaults here. This is a record template, not an engineering approval.

Build data books straight from ERP records

Optional: a short review of how test records and traceability could be compiled automatically.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use this template

Fill in the header with the PO, serial number and governing specification, then enter the rated working pressure, medium and hold time. Print the pressure and function tables for the test crew, or complete the exported Word document directly. Attach gauge calibration certificates and pressure charts as appendices, and have the witness sign before the equipment is released to shipping.

What a typical FAT covers

Equipment built to API Spec 6A is normally verified by hydrostatic body tests, seat and sealing tests, and where specified a gas test, with the product specification level driving the extent of testing. A dimensional and traceability check precedes pressure testing, and valves are cycled through open and close to prove function. The specification, not this template, defines the pressures and durations.

  • Verify traceability and dimensional records first
  • Use calibrated gauges and a pressure chart recorder
  • Hold at pressure for the time stated by the specification
  • Record any leakage, even if the retest passes

Common mistakes

Frequent problems are missing gauge certificates, starting the hold timer before pressure stabilises, and accepting a retest without recording the first failure. Another is testing with the wrong end connection ring gasket, which later gets replaced and invalidates the record. Keep the traveler, chart recorder trace and this form together so a customer audit can match each test to a time and operator.

Frequently Asked Questions

Does this template satisfy API 6A?

It supports the record keeping, but compliance depends on your quality program, the product specification level and the actual test procedure. Use it alongside your approved procedures and the customer's requirements.

Who should witness the FAT?

That is set by the contract. Some customers send their own inspector, others delegate to a third party, and some accept a manufacturer record. The witness field lets you document whichever applies.

Do I need a gas test?

Only if the specification or customer requires it. Gas testing carries more stored energy and needs specific safety controls, so it is typically done in a protected test cell with a documented procedure.

Where do pressure charts go?

Attach them to the record and cross-reference the serial number and time on the chart. Many customers require the original chart or a legible copy as part of the final data book.

If test results, serial numbers and customer data books are assembled by hand from several systems, we can discuss assembling them automatically from your ERP and quality records.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring