Oracle EBS 12.2 Disk Space Calculator for Installation on Linux
This calculator sizes application and database tier storage for Oracle E-Business Suite 12.2, counting both editions of the application file system, fs_ne, retained logs, the Rapid Install stage, database growth and on-disk backups. Use measured sizes from an existing install where you have one.
Your numbers
Measure with du -sh on fs1 of an existing install at your patch level.
Space for the startCD stage. Check the installation guide for your release.
Old editions and patch-edition objects held until adop cleanup and actualize_all.
Your results
Defaults are planning assumptions. Measure real sizes on an existing install at your release and patch level, and check the Oracle installation guide for the minimum requirements of your release.
Storage vs planning horizon
Sweeps Planning horizon from 1 to 10, holding your other inputs fixed.
Get your 12.2 storage plan checked
Send your node layout and measured sizes and we will review the storage plan for patching peaks, backups and growth.
Optional. The tool and every export work without this. No spam.
The 12.2 file system layout
Oracle E-Business Suite Installation Guide: Using Rapid Install for 12.2 describes the dual file system. Rapid Install creates two complete application tier file systems, fs1 and fs2, each holding the application code and technology stack (APPL_TOP, COMMON_TOP, the Oracle Fusion Middleware home and the 10.1.2 tools home). At any time one is the run edition and the other is the patch edition used by adop. A third, non-editioned file system, fs_ne, holds data that must not be duplicated between editions, such as concurrent request logs and output (APPLCSF) and adop patch logs. That is why the calculator counts the edition size twice and fs_ne once per copy.
- Per copy = 2 x edition size + fs_ne + monthly growth x retention
- Shared application tier: one copy for all nodes; not shared: one copy per node
- Database = today x (1 + growth)^years x (1 + edition overhead)
How to use it
If you have a 12.2 environment at the target release, run du -sh against fs1 and fs_ne and enter those numbers instead of the defaults. Pick shared if the application tier nodes mount the same file system over NFS or a cluster file system; pick not shared if each node has its own copy. Enter the current database size, a growth rate from the last year or two of history, and how many full backups you keep on local disk. Headroom covers patching peaks: adop prepare and fs_clone write to the patch file system, and large patches temporarily consume extra space in the database for patch-edition objects until cleanup runs.
Worked example
With the defaults on a shared application tier: 2 x 70 + 40 + 5 x 3 = 195 GB of application storage. The database grows from 500 GB at 15 percent for three years to about 760 GB, and 5 percent edition overhead takes it to about 798 GB. Two on-disk backups add about 1,597 GB. With the 90 GB stage and 25 percent headroom, the total to provision is about 3,350 GB. If the two application nodes are not shared, application storage doubles to 390 GB and the total rises by about 244 GB. Backups usually dominate, so moving them to a separate backup target is the biggest lever.
Gotchas
Do not size from Oracle's minimums alone; those are for a fresh install and do not include your data, logs or patch history. See the installation guide for your release for the current minimum figures. Log directories under fs_ne grow fast if Purge Concurrent Request and/or Manager Data is not scheduled. adop cleanup must run after each cycle, or old editions and dropped objects keep space in the database. Also allow space on the database tier for the Oracle home, archive logs if the database runs in ARCHIVELOG mode, and temporary tablespace during the upgrade.
Frequently Asked Questions
What are fs1, fs2 and fs_ne in Oracle EBS 12.2?
fs1 and fs2 are two complete copies of the application tier file system. One is the run edition used by users, the other is the patch edition that adop patches online; they swap at cutover. fs_ne is the non-editioned file system for data that is not duplicated, such as concurrent request logs, output and patch logs.
How much disk space does Oracle EBS 12.2 need?
The installation guide for your release lists minimums for the stage area, application tier and database tier. Real environments need more: two file system editions, fs_ne, your database with growth, backups and headroom. Use this calculator with sizes measured on an existing 12.2 install for a defensible number.
Should the application tier file system be shared across nodes?
A shared application tier file system means patching and cloning touch one copy, and storage is counted once. It needs a reliable shared file system such as NFS. Non-shared means each node holds its own fs1, fs2 and fs_ne, which multiplies storage and patching work by the number of nodes.
What are the main steps to install EBS 12.2 on Linux?
Check certification and OS prerequisites, create the OS users and groups, download the media and build the stage with buildStage.sh, then run Rapid Install (rapidwiz) to create the database and both file systems. Afterward apply the latest AD/TXK and RUP with adop. Size storage before building the stage.
If you want your admins to ask questions about space, logs and patch history on your EBS servers in plain English, we can set up a private AI layer on your own hardware.
Related Tools
Oracle EBS Database Growth Forecast Calculator
Project EBS database size from monthly growth and a one-time purge, and see how many months of storage headroom remain.
OracleOracle EBS Tablespace Growth Forecast Calculator
Project compound growth of an EBS tablespace or database, find when it crosses an alert threshold and how much storage to add.
OracleOracle EBS On-Premises vs OCI/AWS/Azure Hosting Cost Calculator
Compare the infrastructure cost of running an EBS 12.2 estate in your data centre against a public cloud, using your own vCPU and storage prices.
OracleOracle EBS 12.1.3 to 12.2 Upgrade Downtime Estimator
Turn the timings from your mock upgrade into a production cutover window for a 12.1.3 to 12.2.x upgrade, with contingency and a database-size sweep.
More Oracle tools
See all- Oracle EBS Inventory Tables Reference
- Oracle EBS WIP Tables Reference
- Oracle EBS Cycle Count Workload Calculator
- Oracle EBS Discrete Manufacturing Go-Live Checklist
- Oracle EBS Inventory Accuracy Readiness Assessment
- Oracle EBS Concurrent Request Phase and Status Reference
- Oracle EBS Responsibility Design Worksheet
- Oracle EBS GL Period Close Checklist
- Oracle EBS AP Invoice Interface Template
New to Oracle E-Business Suite? Start with the Oracle E-Business Suite guide and toolkit, or plan with Oracle EBS Roadmap Planner, Training Path Builder, ERP Certification Study Planner.
Keep exploring
Free tools
- Oracle EBS 12.2 Private AI Layer Blueprint GeneratorFill in your Oracle EBS 12.2 version, database, hosting and users to get a shareable architecture plan for a private, on-prem AI assistant.
- Oracle EBS 12.2 AI Assistant Sizing and Value CalculatorEstimate peak load, GPUs, index size, hours saved and payback for an on-prem AI assistant on Oracle EBS 12.2.
- Oracle EBS 12.2 Upgrade Readiness ChecklistCheck whether your EBS environment, custom code and team are ready to move to Release 12.2 and what to settle before the project starts.
ERP fixes and how-tos
- How the adop Patching Cycle Works in Oracle EBS 12.2How the adop online patching cycle works in Oracle EBS 12.2: prepare, apply, finalize, cutover and cleanup phases across the dual fs1/fs2 file system.
- Fix adop phase=prepare Failures in EBS 12.2 Online Patchingadop phase=prepare failing in EBS 12.2 usually means the patch and run file systems are out of sync, or a prior cycle did not finish. Resync with fs_clone.
- How to Add a Private AI Layer to Oracle EBS 12.2 On-PremReference architecture for a private AI layer on Oracle EBS 12.2: Active Data Guard replica, ISG REST, MO and responsibility security, local GPUs and audit.
Runs with your ERP
- Esker Order Management and Oracle E-Business SuiteHow Esker captures customer POs from email, fax and PDF and creates sales orders in Oracle EBS: integration, data flows, setup, pitfalls and a private AI layer.
- Cloud Inventory (DSI) with Oracle E-Business Suite: Mobile Barcode InventoryCloud Inventory, formerly DSI, adds offline mobile barcode inventory to Oracle E-Business Suite and JD Edwards. Data flows, setup steps, pitfalls and AI notes.
- BarTender and Oracle E-Business Suite: Label Printing from OracleHow BarTender prints labels from Oracle EBS using Oracle XML print requests and Integration Builder: methods, data flows, setup steps, pitfalls and AI help.
AI on your ERP
- AI for Oracle E-Business Suite, Without Leaving On-PremHosting Oracle EBS 12.2 on-prem or in a private cloud? Add a private LLM over concurrent programs, interface tables and AP/PO data without moving to Fusion.
- AI for Oracle EBS in Aerospace and Defense ManufacturingAI on Oracle EBS for aerospace and defense manufacturers: project manufacturing, serial control, and ITAR segregation handled without a cloud dependency.
Integrations
- How to add WhatsApp to Oracle E-Business SuiteHow to connect WhatsApp Business to Oracle E-Business Suite 12.1 and 12.2: ISG REST, Workflow business events, template messages and two-way replies into EBS.
- How to add Slack alerts and approvals to Oracle E-Business SuiteConnect Slack to Oracle E-Business Suite for alerts, slash commands and interactive approvals using Workflow events, Oracle Alert and ISG, without exposing EBS.