Choosing an Epicor Kinetic advanced planning and scheduling partner

A good Kinetic planning partner starts with your shop data, not the scheduling board: resource groups, capabilities, calendars, operation standards and MRP parameters. Advanced Planning and Scheduling only produces a believable schedule when that foundation is right, so judge partners on how they model your constraints and prove the schedule against what the floor actually does.

When this makes sense

  • Kinetic users whose schedule is ignored because the floor runs from a whiteboard or spreadsheet.
  • Manufacturers licensing or considering the Advanced Planning and Scheduling module for constraint-based, multi-resource scheduling.
  • Plants where MRP floods planners with suggestions nobody trusts.
  • Job shops and make-to-order plants missing ship dates because capacity is not visible at quote time.
  • Companies adding a second plant and needing scheduling across sites.

What the engagement covers

Resource modeling

Resource groups, resources, capabilities, shop calendars, shifts and finite or infinite settings, plus which operations need a crew, tooling or a second resource at the same time.

Operation standards and routings

Review setup and run standards, queue and move times and scheduling blocks in methods of manufacture, because inflated or zero standards make any schedule meaningless.

MRP tuning

Part planning parameters (min, max, safety, lead times, lot sizing, planning time fence), Process MRP options, job versus purchase suggestions and how unfirm jobs are reviewed and firmed.

Scheduling engine and boards

Forward and backward scheduling rules, Global Scheduling runs, priority and order of scheduling, Job Scheduling Board and Resource Scheduling Board use, and APS planning views for what-if changes.

Capable to promise and quoting

Using capacity and material availability to set realistic promise dates in Quote Entry and Sales Order Entry.

Shop floor feedback

Labor and production reporting through Kinetic data collection or Epicor Advanced MES, so remaining hours and completed quantities feed the next schedule.

Planner reports and dashboards

Load by resource group, late jobs, material shortages and schedule adherence, built as BAQs and dashboards planners use daily.

How it runs

  1. 1

    Planning assessment (2-4 weeks)

    • Map current planning and scheduling process
    • Audit resource, routing and part planning data
    • Define the constraints the schedule must respect
  2. 2

    Data foundation (3-8 weeks)

    • Rebuild resource groups, capabilities and calendars
    • Correct operation standards on high-volume parts
    • Set part planning parameters by class
  3. 3

    Engine configuration and pilot (3-6 weeks)

    • Configure scheduling and MRP options
    • Run parallel schedules against the current method
    • Tune priorities with planners and supervisors
  4. 4

    Go-live and adoption (2-6 weeks)

    • Switch the floor to the Kinetic schedule
    • Set daily planning routines and meeting cadence
    • Track schedule adherence and adjust

What you get

  • Planning and scheduling design: resource model, constraints and scheduling rules
  • Cleaned resource groups, calendars and operation standards for agreed part families
  • Part planning parameter matrix by part class
  • Configured MRP and Global Scheduling runs with a scheduled task plan
  • Planner dashboards for load, late jobs and shortages
  • Daily and weekly planning procedures and training

What drives cost and effort

Routing and standards qualityIf operation standards are wrong across thousands of parts, cleanup is the biggest effort; good data shortens the project sharply.
Constraint complexityMulti-resource operations, tooling limits, crew constraints and sequence-dependent setups need APS features and longer tuning.
Number of plantsEach site adds calendars, resources and planners to train; cross-site supply adds MRP design.
Product mixMake-to-order and engineer-to-order work with frequent new methods needs more planner discipline than repetitive production.
Shop floor reporting accuracyWithout timely labor and quantity reporting, schedules drift; adding data collection or MES expands scope.
Change managementMoving supervisors from whiteboards to the system takes coaching time on the floor, not only configuration.

Assessment then fixed-scope rollout

Plants that want the data foundation reviewed before committing to an APS project price.

Time and materials with a cap

Shops where routing cleanup scope is unknown until data is profiled.

Embedded planning coach retainer

Companies that configured scheduling already but need ongoing help tuning and building planner habits.

Questions to ask any Epicor Kinetic consultant

How will you validate our operation standards before configuring the scheduler?

A partner who skips data validation will deliver a technically correct schedule nobody follows.

Which of our constraints need the APS module and which can base scheduling handle?

This shows whether they understand the difference and avoids paying for features you do not need.

Can you run a parallel schedule against our current method before go-live?

Side-by-side comparison builds trust with planners and exposes modeling errors early.

Who on the team has run planning in a plant, not only configured Epicor?

Scheduling adoption is an operations problem; practical planning experience matters.

How do you set MRP planning parameters across thousands of parts?

Rule-based parameter setting by class is repeatable; part-by-part guessing is not.

How will schedule adherence be measured after go-live?

Without a metric, nobody knows if the schedule is improving or being ignored.

Score candidate partners side by side with the free Implementation Partner Scorecard

Where these projects go wrong

Schedule ignored by the floor

Involve supervisors in pilot tuning, publish a daily dispatch list and review adherence each week.

MRP noise overwhelms planners

Set planning time fences, lot sizes and safety stock by class and review exception messages, not every suggestion.

Long scheduling runs during the day

Schedule Global Scheduling and MRP overnight through the task agent and keep daytime changes to individual jobs.

Standards drift after go-live

Compare estimated to actual hours monthly from labor data and update methods for repeat parts.

Many job shops get most of the benefit from base Kinetic scheduling plus clean routings and disciplined labor reporting, without the APS module. Start with a data and process assessment; if your constraints are a single bottleneck resource and simple shifts, a capable internal planner and short targeted help may be enough.

Frequently asked questions

What does Epicor Advanced Planning and Scheduling add to Kinetic?

APS extends base scheduling with constraint-based, multi-resource scheduling and planning views for what-if changes. It suits plants where operations need several resources at once or where sequence and tooling constraints matter.

How long does an Epicor scheduling project take?

Commonly two to six months depending on data cleanup and the number of plants. Routing and standards cleanup usually takes longer than engine configuration.

Does Epicor sell APS directly or through partners?

Epicor sells Kinetic modules directly and through partners. Ask Epicor to confirm any partner's current standing and which products they are authorized for.

Can we use a third-party scheduler with Kinetic?

Yes, several scheduling products integrate with Kinetic through its REST API. They make sense when you need features Kinetic lacks, but add integration and a second system to maintain.

How can AI help planning in Kinetic?

AI can answer planner questions over live job, load and shortage data, explain why a job is late and draft expedite lists. It works on top of the Kinetic schedule rather than replacing it.

Talk to a Epicor Kinetic consultant

Tell us where you are and what you need. You get a straight answer on scope, approach and whether you need outside help at all.

Get Epicor ERP alerts

Support and maintenance deadlines, release changes that affect Epicor ERP sites, and new free Epicor ERP tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.