Epicor Resource Group Burden Rate Calculator
Every routing operation in Epicor costs out through the rates on its resource group, so a wrong burden rate quietly distorts quotes, job costs and inventory value. This calculator derives a rate from overhead and realistic productive hours and shows what happens to it as utilization moves.
Your numbers
Depreciation, power, maintenance, tooling, supervision and floor space allocated to the resource group.
Machines multiplied by scheduled hours per month.
Your results
Illustrative absorption costing. Your accounting policy and Epicor costing method determine what is actually posted.
Cost rate vs planned utilization
Sweeps Planned utilization from 30 to 95, holding your other inputs fixed.
Rate and variance review
Optional: an expert can compare your resource group rates with posted variances.
Optional. The tool and every export work without this. No spam.
How to use it
Start with the monthly overhead you want the resource group to absorb. Divide the machine or work center into available hours, then apply the utilization you honestly expect, not the nameplate capacity. The tool returns the burden rate per productive hour, adds labor with crew size, and gives a conversion cost per piece for a given run time. You then compare the burden figure with the production burden rate currently set on the resource group in Epicor.
- Use planned, not theoretical, utilization
- Keep setup and production burden rates conceptually separate
- Document the overhead pool so the rate can be reproduced
The method
This is a predetermined overhead rate: budgeted overhead divided by budgeted activity, here productive machine hours. If actual hours fall short, overhead is under-absorbed and shows up as a variance at period end. If you plan for 75 percent utilization and run at 55, the shortfall flows to the variance accounts rather than to part cost. The chart makes the sensitivity obvious: the rate rises steeply once utilization drops below about 50 percent.
Reading the result
With the defaults, burden is about 106 dollars per productive hour, which is not unusual for a CNC cell with high depreciation. Add labor and the total rate is about 134 an hour, or roughly 13 dollars of conversion cost for a six minute operation. Compare against what your quotes assume. Where the quote assumes less, you are giving away margin on every job through that work center.
Common mistakes
The usual errors are including costs twice, once in burden and once in a separate labor overhead, and basing the rate on 100 percent utilization. A rate set too low makes machines look cheap and encourages work that loses money; set too high, it prices you out of quotes. Review the rates at least yearly and after any major capital purchase or headcount change.
Frequently Asked Questions
Where are burden rates set in Epicor?
Rates are held on the resource group and resource records, with separate setup and production values for labor and burden. Check your Kinetic version for the exact screen and how it combines with operation and employee rates.
What utilization should I plan for?
Use your actual historical productive share of scheduled time, often between 60 and 85 percent for machining work. Planning at 100 percent guarantees under-absorption and misleading part costs.
Is this the same as machine hour rate?
Close. A machine hour rate usually covers machine-related overhead only, while a burden rate may include shared factory overhead. This tool lets you choose which costs go into the pool; the formula is the same.
Does it handle activity based costing?
Not directly. It gives one rate per cost pool. For activity based costing, run it once per pool and sum the contributions per operation.
If you would like a review of your resource group rates against actual job cost variances in Epicor, we can analyze this read-only with you.
Related Tools
Epicor Quote Price and Quantity Break Calculator
Build a unit price from material, labor, setup and subcontract cost, hit a target margin, and see how the price falls with quantity.
EpicorEpicor Job Cost Variance Worksheet
Compare estimated and actual material, labor and burden for closed jobs, and rank where the largest overruns occur.
EpicorEpicor Shop Floor OEE Calculator
Calculate OEE from planned time, downtime, ideal cycle time, count and rejects, then test how much downtime cuts OEE.
EpicorEpicor EOQ and Lot Sizing Calculator
Compute economic order quantity, orders per year and total annual cost, then round to the multiple you enter in Epicor.
More Epicor tools
See all- Epicor Kinetic Job Status Reference
- Epicor BAQ Query Template Generator
- Epicor BPM Directive Design Template
- Epicor DMT Import Template Worksheet (Part and BOM)
- Epicor MRP Run Checklist
- Epicor Kinetic Upgrade Checklist
- Epicor REST API v2 URL Builder
- Epicor Security Group Design Worksheet
- Epicor Safety Stock and Reorder Point Calculator
New to Epicor ERP? Start with the Epicor ERP guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.
Keep exploring
Free tools
- Epicor Job Cost Variance WorksheetCompare estimated and actual material, labor and burden for closed jobs, and rank where the largest overruns occur.
- Epicor Security Group Design WorksheetAn editable worksheet to plan security groups by role and score each for exposure, so over-broad access is visible before audit.
- Epicor Kinetic Data Load Effort CalculatorEstimate total data migration hours for an Epicor project from record counts, error rate and number of test cycles.
ERP fixes and how-tos
- Epicor Kinetic Costing Workbench: Part Cost, Rollup and Material BurdenHow Epicor Kinetic part cost works: the Costing Workbench, cost rollup for standard cost, material burden, and a practical cost review routine.
- How to Complete an Operation in Epicor Kinetic (Plus Time Entry and Corrective Action)Complete an operation in Epicor Kinetic through MES or Labor Entry, plus time and expense entry, customer managed inventory and corrective action, with what to check first.
- Convert Epicor Classic Dashboards to KineticHow to convert Epicor Classic dashboards to Kinetic during an upgrade: what carries over, what must be rebuilt, and how to verify each dashboard.
AI on your ERP
- Private AI for Epicor Kinetic Cloud, Outside the Multi-Tenant BoundaryRun a private LLM on Epicor Kinetic private cloud or Kinetic Cloud data via BAQs, REST v2 and Data Fabric, keeping sensitive manufacturing data off shared AI.
- Epicor Kinetic AI for Aerospace and Defense Suppliers: Traceability, Quality and CUI, On-PremOn-prem AI for aerospace and defense suppliers on Epicor Kinetic: traceability, AS9100 quality, CUI and ITAR handling, and why cloud AI features need care.
Integrations
- How to add AI agents to Epicor KineticHow to add AI agents to Epicor Kinetic: a tool layer over the REST v2 API and BAQs, MRP exception triage, PO expediting, and human approval before any write.
- How to add an AI chatbot to Epicor KineticAdd an AI chatbot to Epicor Kinetic: an internal assistant for planners and buyers or a customer portal bot, grounded in BAQs and runnable fully on-prem.
Software
- Epicor KineticEpicor Kinetic explained for manufacturers: modules, REST API, BAQs, deployment, strengths, limits and alternatives to compare before choosing or upgrading.
- Epicor CPQEpicor CPQ is a cloud configure-price-quote product with visual 3D configuration for manufacturers. Modules, ERP integrations and alternatives explained.