Evaluating Infor for aerospace and defense, and choosing an implementation partner
Infor's aerospace and defense offer centres on CloudSuite Aerospace and Defense, built on Infor LN, aimed at program-driven manufacturers and MRO operations with project control, contract and configuration management. Smaller build-to-print shops more often run CloudSuite Industrial (SyteLine) or Infor VISUAL, and asset maintenance needs sit with EAM, which Hexagon acquired from Infor in 2021. Evaluate the product that matches your business shape first, then pick a partner who has delivered that product in a regulated A&D setting.
When this makes sense
- You are a program or contract manufacturer with long-lead, project-driven work and need project, contract and cost control tied to production.
- You run MRO for aircraft, engines or components and are comparing ERP-based service management with specialist MRO systems.
- You hold export-controlled data and must decide between multi-tenant cloud, single-tenant or on-premises deployment.
- Your AS9100 auditors keep finding gaps in traceability, first article inspection or supplier flowdown that the current system cannot evidence.
- You are running an Infor evaluation and the term list (ERP, MRO, EAM, ALM) does not map clearly to products.
What the engagement covers
Product fit by business shape
Map your model (engineer-to-order programs, build-to-print job shop, MRO, spares distribution) to LN-based CloudSuite Aerospace and Defense, CloudSuite Industrial or VISUAL, and decide where specialist systems remain better.
Project and contract control
Evaluate LN project control (PCS and project management), contract handling, earned value, cost collection against WBS and how it links to planning and purchasing.
Configuration and effectivity
Test engineering change control, as-designed versus as-built records, serial and lot genealogy, and effectivity by serial or date in LN.
Quality and compliance evidence
Check inspection, nonconformance and MRB disposition, first article records against AS9102, certificates of conformance and supplier flowdown, and how each produces audit evidence.
MRO and service
Review LN service orders, maintenance programs and component tracking against specialist MRO tools if you maintain aircraft or engines.
Deployment and data control
Compare multi-tenant CloudSuite with single-tenant or on-premises options against ITAR, EAR and DFARS 7012 obligations, and confirm what Infor's hosting offers for your case directly with Infor.
Partner evaluation
Score partners on A&D references for the specific product, project manufacturing depth, quality module experience and data migration from legacy A&D systems.
How it runs
- 1
Requirements and shortlisting (3-6 weeks)
- Document program, quality and compliance requirements
- Decide on candidate Infor products and any non-Infor alternatives
- Issue scripted demo scenarios
- 2
Scripted demos and reference checks (3-6 weeks)
- Run demos on your data: a program, an ECO, an MRB case, a FAI
- Call references in A&D with similar size and model
- Assess deployment options against export control obligations
- 3
Partner selection and planning (2-4 weeks)
- Compare partner proposals and staffing
- Agree phasing, data migration scope and validation approach
- Negotiate contract and success criteria
- 4
Implementation (9-24 months)
- Design enterprise structure and project model
- Configure, migrate and test in cycles
- Validate quality and traceability with auditors' evidence in mind
What you get
- Product fit assessment by business shape
- Scripted demo scenarios and scorecards
- Deployment option analysis against export control obligations
- Partner comparison with reference check notes
- Implementation roadmap with phasing and validation plan
- Data migration scope for programs, serial history and quality records
What drives cost and effort
| Program and project complexity | Many concurrent contracts with WBS-level cost collection and earned value raise design and testing effort significantly. |
| Traceability depth | Serial genealogy, effectivity and as-built records add configuration and migration effort compared with lot-only traceability. |
| Deployment model | Single-tenant or on-premises options for controlled data add infrastructure, security and validation work. |
| Legacy data | Migrating open programs, serial histories and quality records is far harder than migrating masters and open orders. |
| Number of sites and legal entities | Multi-site and multi-company structures in LN need careful enterprise modelling up front. |
| Specialist system integrations | PLM, MES, MRO and quality tools that stay outside ERP add interfaces to build and test. |
Independent selection advisory
Companies still deciding whether Infor fits, who want help that is not tied to a reseller commission.
Phased fixed-fee implementation
Clearly scoped rollouts with agreed phases, such as finance and supply chain first, then project control and quality.
Time and materials with milestone gates
Complex program manufacturers where design decisions emerge during conference room pilots.
Questions to ask any Infor CloudSuite consultant
Which A&D customers have you implemented on this exact Infor product, and can we speak to one?
LN-based A&D experience and SyteLine job-shop experience are different skill sets.
How do you model contracts, WBS and earned value in LN?
Project control is the heart of program manufacturing and is easy to get wrong.
How will our export-controlled data be handled during the project, including consultant access?
Obligations apply to the implementation team as well as the production system.
How do you migrate serial genealogy and open quality records?
Auditors expect continuity of evidence across the cutover.
What will you configure as standard and what needs extensions?
Heavy extensions in A&D projects slow every future update.
Who on your team has worked in an AS9100 quality system?
Quality configuration needs someone who knows what an auditor asks for.
Score candidate partners side by side with the free Implementation Partner Scorecard
Where these projects go wrong
Choosing a product sized for a different business shape.
Run scripted demos with your own program, ECO and MRB scenarios before shortlisting.
Deployment model that does not meet export control obligations.
Get written answers from Infor on hosting, access and data location, and involve your compliance officer early.
Project control designed late.
Design the project and contract model in the first phase because it shapes costing and planning.
Weak traceability migration.
Decide early which history moves, which is archived and how auditors will access archives.
Over-customisation.
Set a gate where each extension needs a business case.
If you are a small build-to-print shop, a full LN-based A&D suite may be more system than you need; CloudSuite Industrial, VISUAL or a job-shop ERP can meet AS9100 evidence needs with less effort. If you maintain aircraft, a specialist MRO system may fit better than ERP service modules. Use a partner who will tell you that.
Frequently asked questions
What is Infor CloudSuite Aerospace and Defense?
It is Infor's industry suite for A&D, built on Infor LN, covering project and contract manufacturing, configuration management, quality and service. Confirm current module scope and deployment options with Infor because suites evolve.
Does Infor still sell EAM?
Hexagon acquired Infor's EAM business in 2021 and markets it as HxGN EAM. If asset maintenance is central to your evaluation, treat it as a separate vendor decision.
Can Infor handle ITAR-controlled data?
The software can support access controls and segregation, but compliance depends on deployment, hosting location, staff access and your own procedures. Get specifics from Infor and design the deployment with your compliance team.
How long does an A&D Infor implementation take?
Program manufacturers commonly plan in the range of one to two years for a multi-phase rollout. Simpler job-shop deployments on CloudSuite Industrial can be shorter.
Where does AI fit for A&D on Infor?
Many A&D firms want AI over ERP data but cannot send it to public services. Netray runs open-weight models on customer infrastructure, read-only over LN or SyteLine, so the architecture supports the customer's own export control obligations.