Infor inventory management: evaluating the software and the partner who implements it
Infor covers inventory management in several places: inside each CloudSuite ERP (Industrial or SyteLine, LN, M3, Distribution), in Infor Factory Track for mobile warehouse and shop floor transactions, and in Infor WMS for high-volume warehouses. Which fits depends on your volume, picking complexity and the ERP you run. A partner should prove they can tune the option you will actually use, not just demo it.
When this makes sense
- Inventory accuracy is poor and cycle counts keep finding the same variances.
- You still record moves on paper and want barcode or RF scanning.
- You are adding a warehouse, a 3PL or a new plant to an existing Infor ERP.
- Customers or regulators require lot and serial traceability.
- Excess and obsolete stock keeps growing while stockouts continue.
- You are evaluating Infor against other options and want to understand where inventory functions live.
What the engagement covers
Item and location design
Design warehouses, zones, bins, units of measure and item attributes so stock is tracked where it physically sits.
Replenishment parameters
Set order points, safety stock, order quantities and lead times from demand history and supply data, and decide where MRP or planning takes over.
Lot and serial control
Configure lot and serial tracking, expiry where relevant, and the transactions and labels needed to keep traceability intact.
Cycle counting and ABC
Classify items, set count frequencies and tolerances, and build a counting routine with variance review and root cause tracking.
Mobile transactions
Deploy Factory Track with CloudSuite Industrial, or handheld warehouse transactions in LN or M3, for receiving, putaway, moves, picking and shipping.
Infor WMS where volume demands it
Assess whether wave planning, slotting, labor management and complex picking justify Infor WMS over ERP inventory functions.
Costing and valuation
Align inventory costing method, adjustments and scrap with finance so valuation and variances are trusted.
KPIs and reporting
Report accuracy, turns, fill rate, aged stock and count variance so improvement can be measured.
How it runs
- 1
Assessment (2-4 weeks)
- Walk the warehouse and floor
- Review accuracy and count history
- Map transactions and paper steps
- Recommend ERP inventory, Factory Track or WMS
- 2
Design (3-6 weeks)
- Location and bin design
- Replenishment parameter method
- Device, label and wireless plan
- Count program design
- 3
Build and devices (4-10 weeks)
- Configure software
- Wireless survey and device setup
- Label templates and printers
- Load locations and parameters
- 4
Pilot and test (3-6 weeks)
- Pilot in one area or warehouse
- Measure scan rates and accuracy
- Adjust processes
- Train operators
- 5
Rollout (Varies by site count)
- Area by area or site by site go-live
- Count and reconcile at cutover
- Support and tune
What you get
- Location and bin design with labeling plan
- Replenishment parameter file with method notes
- Cycle count program with ABC classes and tolerances
- Device and wireless coverage plan
- Label templates and printer setup
- Inventory KPI dashboard
- Standard operating procedures for each transaction
What drives cost and effort
| Number of warehouses and sites | Each site adds design, devices, training and cutover counts. |
| Hardware and wireless | Scanners, printers and wireless upgrades can be a large share of a mobile project. |
| ERP inventory versus Infor WMS | WMS adds licensing, integration and configuration but handles volume and complexity ERP functions cannot. |
| Lot and serial requirements | Traceability adds transactions, labels and testing. |
| Integrations | 3PL, carrier and automation integrations add interfaces to build and support. |
| Data cleanup | Wrong units of measure and stale locations must be fixed before scanning can work. |
Fixed-scope warehouse rollout
A defined warehouse or plant with clear transactions and device needs.
Time and materials
Accuracy or process problems where the root causes still need investigating.
Pilot then rollout
Multi-site companies that want to prove scanning and counting on one site first.
Questions to ask any Infor CloudSuite consultant
Should we use ERP inventory, Factory Track or Infor WMS, and why for our volumes?
The right answer depends on order lines, picking complexity and ERP, and a partner should show the reasoning.
How will you set reorder points and safety stock: from history or from estimates?
Guessed parameters produce both stockouts and excess.
Who does the wireless survey and recommends devices?
Dead spots and wrong devices are common causes of failed scanning rollouts.
How do you handle inventory counts at cutover?
Starting with wrong quantities undermines everything that follows.
Which inventory KPIs will we have on day one?
Without measures, you cannot tell if the project improved anything.
Who supports devices and labels after go-live?
Device problems stop the warehouse, so support must be clear.
Score candidate partners side by side with the free Implementation Partner Scorecard
Where these projects go wrong
Bad replenishment parameters cause stockouts and excess.
Calculate from demand history and review parameters after the first months.
Wireless gaps make scanning unreliable.
Survey before buying devices and fix coverage first.
Count discipline fades after go-live.
Schedule counts in the system and review variances weekly.
WMS bought for a warehouse that did not need it.
Decide on measured volume and complexity, not on a demo.
Label and printer problems stop shipping.
Test all labels with real printers and keep spare devices.
Many inventory problems are process discipline, such as receiving without scanning or unrecorded moves, rather than software. A simple cycle count program in your existing Infor ERP may fix accuracy before you buy Factory Track or WMS. If you run one small warehouse, the ERP's inventory functions are usually enough.
Frequently asked questions
What is the difference between Factory Track and Infor WMS?
Factory Track adds mobile transactions for warehouse and shop floor work on top of CloudSuite Industrial and some other Infor ERPs. Infor WMS is a full warehouse management system for high-volume operations with wave planning, slotting and labor management. Most mid-size manufacturers start with Factory Track.
Is Infor a workforce management company?
Infor sells workforce management software as well as ERP, but inventory management sits in its ERP CloudSuites, Factory Track and WMS. When evaluating Infor for inventory, look at those products and how they fit your ERP.
Does CloudSuite Industrial support lot and serial tracking?
Yes. CloudSuite Industrial supports lot and serial tracking through receiving, production and shipping, which many regulated manufacturers rely on. Scanning through Factory Track makes it practical at volume.
How long does an inventory improvement project take?
A single warehouse scanning and counting project commonly takes 2-4 months. Multi-site rollouts or WMS projects take longer depending on sites and integrations.
How does AI help inventory management?
ERPray can answer inventory questions in plain language over live ERP data, such as which items are below safety stock or which bins have repeated variances. AI can also analyze history to suggest replenishment parameters for review.