Infor M3 & CloudSuiteFree checklistPDF, Excel, Word exportInfor Factory TrackAll Infor SyteLine (CloudSuite Industrial) tools

Infor Factory Track Installation and Go-Live Checklist (CSI / SyteLine)

A practical checklist for installing on-premises or enabling Infor Factory Track with CloudSuite Industrial (SyteLine), covering prerequisites, configuration, BarTender labels, devices and Wi-Fi, data readiness, pilot and go-live. Use it alongside the Factory Track administrator documents for your release.

0%

0 of 37 items complete

8 critical items still open - these are the highest-risk gaps.

Free, optional. Reopen it on any device.
Download checklist:

1. Prerequisites

2. Install and configure

3. Labels and printing

4. Devices and network

5. Data readiness

6. Pilot and go-live

Critical items are the ones that most often delay a Factory Track go-live or create inventory errors afterwards. Do not switch off paper until every critical item is complete.

Get your Factory Track go-live plan checked

Send us your scope, CSI version and site list and we will return a reviewed go-live plan with the critical items and owners marked.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Work through the six groups in order and tick items as you finish them; export the list for the project file or steering meeting. Groups 1 and 2 belong to IT and the Factory Track administrator, group 3 to whoever owns labels, group 4 to infrastructure, and groups 5 and 6 to the warehouse and production leads. The critical items are the ones that most often delay go-live or cause inventory problems after it. A Factory Track project fails less often on software than on missing location labels, untested Wi-Fi and users who do not know what each scan posts to CSI.

  • Assign an owner and date to every critical item.
  • Keep a list of open questions for Infor support by item number.

Where to find the official documentation

Infor publishes Factory Track documentation on docs.infor.com under Factory Track, split into administrator and user documents. The ones that matter for this checklist are Infor Factory Track Supported Backend Versions (which CSI versions each release supports), the administrator documents for installation, technology and BarTender label configuration, the administrator guide for the Android app, the Database Validation and Prep Tool user guide, and the CSI Warehouse Mobility and Time Track user guides. Use the versions that match your Factory Track release; steps and parameters change between releases.

Labels and BarTender

Factory Track prints labels through a BarTender integration, so label design and printer mapping are a workstream of their own. Agree templates for item, lot, serial and container labels early, because warehouse staff will scan them for years. Test print quality and symbology with the actual scanners at working distance, in the real lighting. Map printers to warehouses and work areas so Job Receipt and Purchase Order Receipt print where the material is, and teach users Change Printer and Label Reprint before go-live, not during it.

Pilot, cutover and the first week

A conference room pilot should run every transaction in scope with real barcodes and then check the result in CSI forms: the PO line received, the job material issued, the stock moved, the count posted. Then cut over from paper on a clear date, with a known last paper transaction. During the first week, staff the floor on every shift. At the end of week one, count a sample of locations, compare labor hours from Time Track or Labor Reporting with expectations, and fix the root cause of each variance, which is usually training or a missing label rather than the software.

Frequently Asked Questions

Where is the Infor Factory Track installation guide?

On docs.infor.com under Factory Track, in the administrator documents for your release. Check the Supported Backend Versions document first to confirm your CSI version is supported, then follow the installation and configuration guides for that same release.

How is BarTender configured for Factory Track?

Factory Track uses BarTender for label printing, and Infor provides a BarTender configuration guide for Factory Track in the administrator documents. It covers connecting BarTender to Factory Track, label templates and printer setup. Follow the version that matches your Factory Track release.

Why can a user not log in to Factory Track?

Common causes are a Factory Track user not linked to a CSI user or employee, a missing role or menu, an expired password, the wrong site or warehouse selected, or a device that cannot reach the server over Wi-Fi. Test the same user on a desktop browser to separate account problems from network ones.

How long does a Factory Track go-live take?

For one warehouse with Warehouse Mobility only, a few weeks to a few months is typical, driven by labels, Wi-Fi and training. Adding Time Track brings payroll rules and union or works council review, which often sets the timeline.

Once Factory Track is live, we can add a private AI layer so supervisors can ask what was received, issued or clocked in plain English, on your own servers.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP