Infor LN implementation partners: how to evaluate and choose one
Infor LN is sold and implemented by Infor directly and by partners in the Infor Partner Network, and in some regions partners also resell the subscription. LN projects are design-heavy: enterprise modelling, logical companies, multi-site planning and project manufacturing decisions are made early and are hard to undo. Choose a partner on proven LN delivery of your manufacturing model, not on general Infor experience.
When this makes sense
- You are selecting LN or CloudSuite Industrial Enterprise and need an implementation partner.
- You are on Baan IV, Baan V or an early LN release and planning the move to current LN or the cloud.
- You run multiple plants or legal entities and need someone who has designed LN enterprise structures at that scale.
- Your current partner lacks depth in a key area such as project control, service or warehousing.
- Your LN rollout stalled after the first site and you need a partner for the remaining sites.
What the engagement covers
Enterprise modelling
Design companies, financial and logistic companies, enterprise units, sites and departments, and decide what is shared through logical table linking.
Manufacturing model
Configure make-to-stock, assemble-to-order or engineer-to-order with production orders, assembly control, project control (PCS) and product configuration as needed.
Planning
Set up Enterprise Planning with plan items, multi-site supply and distribution planning, and the freezing and rescheduling rules planners rely on.
Warehousing and quality
Configure warehousing order types, inbound and outbound procedures, locations, quality inspections and lot or serial tracking.
Finance integration
Design integration mapping from logistic transactions to the general ledger, intercompany trade and multi-currency.
Extensions and integrations
Decide what stays standard, what becomes an extension in LN Studio or cloud extensibility, and which flows run through ION BODs and APIs.
Data migration
Plan conversion of items, BOMs, routings, open orders and balances, using LN exchange schemes, ION or migration tooling.
How it runs
- 1
Partner selection (4-8 weeks)
- Write scripted scenarios for your manufacturing model
- Compare proposals and named teams
- Call LN references with similar scale
- 2
Design (2-4 months)
- Model the enterprise structure
- Run conference room pilots by process
- Freeze key design decisions
- 3
Build and test (4-9 months)
- Configure and build extensions and integrations
- Run migration test cycles
- Execute system and user acceptance testing
- 4
Go-live and rollout (2-12 months)
- Cut over the first site
- Stabilise with hypercare
- Roll out remaining sites in waves
What you get
- Enterprise model and company structure design
- Process designs from conference room pilots
- Configured LN environment with documented settings
- Extension and integration register
- Migration scripts and reconciliation reports
- Rollout plan for remaining sites
What drives cost and effort
| Number of sites and companies | Each site with distinct processes adds design and testing; template-based rollouts reduce later sites' effort. |
| Manufacturing model | Engineer-to-order with PCS and configuration is much heavier than make-to-stock. |
| Baan or LN legacy | Upgrading from Baan with many customizations adds analysis and rebuild work. |
| Cloud versus on-premises | Cloud tenants restrict core changes, which shifts effort to redesign rather than retrofit. |
| Integration landscape | MES, PLM, WMS and EDI interfaces each add build and test effort. |
| Internal team strength | Strong internal process owners shorten design; thin teams lengthen it. |
Fixed-fee per phase
Well-defined single-site or template rollouts.
Time and materials with phase gates
Complex multi-site or project manufacturing programs where design will evolve.
Mixed: partner core team plus independent advisor
Companies that want delivery from a partner and an independent check on design quality.
Questions to ask any Infor LN consultant
How many LN projects has your proposed project manager and lead architect delivered end to end?
LN is design-heavy; the individuals matter more than the firm's logo list.
How would you model our companies and sites, and why?
Enterprise modelling decisions are hard to reverse; you want a reasoned answer early.
What is your approach to multi-site planning in LN?
Multi-site supply planning is where weaker partners struggle.
How do you handle Baan customizations in a move to LN cloud?
Many legacy customizations cannot move as-is.
Are you reselling licences, and does that affect your scope advice?
Commercial ties should be visible when weighing recommendations.
What does post-go-live support look like, with which people?
Multi-site rollouts need continuity across waves.
Score candidate partners side by side with the free Implementation Partner Scorecard
Where these projects go wrong
Poor enterprise model.
Review it with an independent LN architect before build starts.
Rollout stalls after site one.
Design a global template and plan site waves from the start.
Customizations carried from Baan without challenge.
Classify each against current standard LN functionality.
Planning distrust.
Test Enterprise Planning on real data and involve planners in tuning.
If you are a single-site discrete manufacturer without project or multi-site needs, LN may be more than you need; CloudSuite Industrial can be simpler to run. If your existing LN partner is competent and only short of capacity, adding resources may beat switching. Infor Consulting Services is also an option.
Frequently asked questions
Who sells Infor LN?
Infor sells LN directly and through partners. In some regions partners resell subscriptions; in others they provide services only. Ask each partner what they are authorised to do.
How long does an LN implementation take?
Single-site projects commonly run around nine to fifteen months; multi-site programs run longer with waves. Scope and design complexity drive the range.
Can we move from Baan to LN without reimplementing?
Technical upgrades from Baan IV or V to LN are possible but customizations, data structures and the move to cloud usually make it a mix of upgrade and redesign.
What is CloudSuite Industrial Enterprise?
It is Infor's cloud suite built on LN for complex discrete manufacturers. It adds Infor OS services and a multi-tenant update model.
How does Netray help on LN?
Netray engineers work with partner LN specialists and use AI agents for customization inventories, data mapping checks and regression test generation. ERPray provides read-only natural-language answers over LN data.