SAP ECC BW integration: extraction, deltas and the move to ODP

SAP ECC feeds BW through DataSources: business content extractors such as 2LIS_11_VAHDR for sales or 0FI_GL_14 for G/L line items, generic DataSources over tables or views, and the LO Cockpit for logistics. Modern setups run these through the ODP framework, which BW/4HANA requires, with delta queues monitored in ODQMON.

When this makes sense

  • Deltas from ECC to BW fail or produce wrong numbers
  • You are moving BW to BW/4HANA and must switch ECC extraction to ODP
  • New reporting needs require new DataSources or enhancements
  • Setup tables must be refilled after a change and you need a safe plan
  • You want near real-time data and are considering SLT

What the engagement covers

DataSource activation

Activate business content DataSources in RSA5, maintain in RSA6, test with RSA3 extractor checker, and replicate to BW.

LO Cockpit

Configure logistics extraction in LBWE, choose update modes such as queued delta, schedule collective update jobs, and fill setup tables for initial loads.

Delta management

Monitor delta queues (RSA7 for classic, ODQMON for ODP), handle repeat deltas and re-initialization without data loss.

ODP migration

Move from classic S-API source systems to ODP-SAPI, adjust DTPs and data flows, and plan cutover of delta pointers.

Generic and enhanced extraction

Build generic DataSources over tables, views or function modules, and enhance standard extractors with append structures and BAdI logic.

SLT replication

Use SAP Landscape Transformation Replication Server for near real-time table replication where extractors are not enough.

How it runs

  1. 1

    Review (1-3 weeks)

    • Inventory DataSources and delta methods
    • Check delta queue health
    • List failures and data gaps
  2. 2

    Design (1-3 weeks)

    • Plan ODP migration or new DataSources
    • Decide setup table refill windows
    • Define monitoring
  3. 3

    Build and test (3-8 weeks)

    • Activate or build DataSources
    • Run initial loads and deltas
    • Reconcile with ECC reports
  4. 4

    Cutover (1-3 weeks)

    • Switch to new extraction
    • Monitor deltas closely
    • Hand over runbooks

What you get

  • DataSource inventory and health report
  • ODP migration plan
  • Setup table refill runbook
  • New or enhanced DataSources
  • Reconciliation results
  • Delta monitoring setup

What drives cost and effort

Number of DataSourcesMore DataSources mean more testing and cutover planning.
Custom enhancementsEnhanced extractors need code review and testing.
Data volumeLarge setup table fills require downtime planning.
Delta failures historyBroken deltas may need re-initialization, adding effort.
SLT useReal-time replication adds infrastructure and monitoring.

Fixed-scope extraction review

Diagnosing delta problems and planning fixes.

ODP migration project

Preparing ECC sources for BW/4HANA.

BW support retainer

Ongoing monitoring and new DataSource requests.

Questions to ask any SAP ECC consultant

How do you refill setup tables without losing deltas?

Mistakes here cause missing or duplicate data.

What is your approach to ODP migration?

Cutover of delta pointers must be planned carefully.

How do you reconcile BW numbers with ECC?

Trust in reports depends on reconciliation.

When do you recommend SLT over extractors?

SLT adds cost; it should be used where it adds value.

How do you monitor deltas daily?

Early detection of failures avoids long recovery.

Score candidate partners side by side with the free Implementation Partner Scorecard

Where these projects go wrong

Delta data lost during changes

Lock postings or plan downtime when refilling setup tables.

ODP cutover creates duplicates

Test the cutover sequence in a copy system first.

Enhanced extractors slow loads

Review enhancement code for performance.

Unmonitored delta queues grow

Set alerts on queue size and job failures.

If you plan to move to S/4HANA soon, invest in ODP and CDS-based extraction rather than new classic extractors. If reporting needs are simple, S/4HANA embedded analytics may replace some BW flows after migration.

Frequently asked questions

How does SAP ECC send data to BW?

ECC exposes DataSources: business content extractors for finance and controlling, LO Cockpit DataSources for logistics such as 2LIS_02_ITM for purchasing and 2LIS_03_BF for material movements, and generic DataSources you define. BW requests a full or delta load, and the data travels through a delta queue over classic S-API or the ODP framework.

What is ODP?

Operational Data Provisioning is a common extraction framework where providers such as SAPI extractors, CDS views or SLT write to an operational delta queue, monitored in ODQMON. Several subscribers can read the same source, and BW/4HANA accepts only ODP-based SAP source connections.

What are setup tables?

Setup tables hold a snapshot of logistics documents used for the initial load of LO DataSources. They are filled per application area with the setup programs, ideally while postings are locked, because documents created during the fill can be missed or duplicated. After the init, deltas flow through the queue instead.

When should we use SLT?

Use SLT when you need near real-time replication of tables or when no extractor covers the data you need. It replicates at table level, so business logic that extractors apply, such as currency handling or status derivation, must be rebuilt in BW. It also adds a server and monitoring to your landscape.

Can AI help with BW integration?

AI can document DataSources, trace data lineage and help diagnose delta failures. Netray uses AI agents for analysis and documentation, while BW experts manage changes.

Talk to a SAP ECC consultant

Tell us where you are and what you need. You get a straight answer on scope, approach and whether you need outside help at all.

Get SAP ECC 6.0 alerts

Support and maintenance deadlines, release changes that affect SAP ECC 6.0 sites, and new free SAP ECC 6.0 tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.