SAP BW/4HANA implementation: choosing the path from BW on HANA or starting fresh
An SAP BW/4HANA implementation is either a new installation with fresh models or a conversion of an existing SAP BW, and the path you choose (greenfield, in-place, remote or shell conversion) decides most of the cost. BW/4HANA keeps only HANA-optimized objects such as advanced DataStore objects, CompositeProviders and Open ODS views, and drops the classic S-API and DB Connect source systems in favour of ODP and HANA source systems, so old InfoCubes, classic DSOs and 3.x data flows must be converted or rebuilt.
When this makes sense
- You run SAP BW 7.5 on HANA and need a plan before its maintenance ends
- Your BW still runs on a non-HANA database and you must decide between BW/4HANA and a different platform
- You are moving to S/4HANA and need to rebuild extraction on ODP and CDS-based sources
- Your BW has years of unused queries and data flows and you want a clean start
- You are weighing BW/4HANA against Datasphere with the BW bridge
What the engagement covers
Path decision
Compare greenfield, in-place conversion (BW 7.5 on HANA with the Starter Add-on and Transfer Cockpit), remote conversion into a new system, and shell conversion that moves metadata without data.
Object conversion
Transfer InfoCubes and classic DSOs to advanced DataStore objects, MultiProviders and InfoSets to CompositeProviders, and replace 3.x data flows and transfer rules with transformations and DTPs.
Source system connections
Move all sources to ODP: ODP-SAPI for ECC DataSources, ODP-CDS for S/4HANA CDS extraction views, ODP-SLT for replication, and HANA source systems for native tables.
Modeling in BW Modeling Tools
Build and maintain objects in Eclipse-based BW Modeling Tools, with mixed modeling to HANA calculation views where native HANA logic is better.
Process chains and operations
Rebuild process chains for loads, activation and housekeeping, and set up monitoring through the BW/4HANA cockpit.
Front ends
Move queries to SAP Analytics Cloud, Analysis for Office or other BI tools, since BEx tools are not used with BW/4HANA in the same way.
Data tiering
Plan hot, warm and cold storage for large ADSOs from day one to control HANA memory cost.
How it runs
- 1
Assessment (3-6 weeks)
- Run readiness checks and inventory objects, flows and queries
- Measure query usage to find what can be retired
- Choose the conversion path
- 2
Preparation (4-8 weeks)
- Upgrade to BW 7.5 on HANA if needed
- Clean unused objects and data
- Move source connections to ODP
- 3
Conversion or build (8-20 weeks)
- Transfer objects with the Transfer Cockpit or rebuild models
- Rebuild process chains
- Convert queries and front ends
- 4
Testing and cutover (4-8 weeks)
- Reconcile key figures against the old system
- Run performance tests
- Cut over loads and users
What you get
- Readiness and usage assessment
- Conversion path recommendation with effort ranges
- Object transfer plan and conversion log
- ODP source connection design
- Rebuilt process chains and monitoring
- Query and front-end migration plan
- Reconciliation results and cutover plan
What drives cost and effort
| Volume of legacy objects | Thousands of InfoCubes, DSOs and 3.x flows take longer to convert than a lean BW. |
| Custom ABAP in transformations | Start, end and expert routines need review and sometimes rewriting. |
| Source system changes | Moving from ECC to S/4HANA during the same period means rebuilding extraction on new sources. |
| Front-end migration | Hundreds of BEx queries and workbooks add redesign and user testing. |
| Data volume | Large histories increase conversion runtime and HANA sizing; archiving or tiering first helps. |
Fixed-scope assessment
Choosing the path and getting effort ranges before budgeting.
Phased conversion project
Large BW systems converted area by area with reconciliation gates.
Run and support
Operations after go-live, including process chain monitoring and small enhancements.
Questions to ask any SAP S/4HANA consultant
Which conversion path do you recommend for us, and what would make you change your mind?
A clear, reasoned choice between in-place, remote, shell and greenfield shows real BW/4HANA experience.
How do you decide which objects to retire instead of converting?
Usage data often shows large parts of an old BW can be dropped.
How will you handle custom routines in transformations?
Routines hide business logic and are a common source of conversion problems.
What is your view on BW/4HANA versus Datasphere for us?
A neutral partner can explain when each fits, or when both run together.
How will you reconcile numbers between old and new?
Users trust the new system only when key figures match.
Score candidate partners side by side with the free Implementation Partner Scorecard
Where these projects go wrong
Converting everything, including unused content
Use query and load statistics to retire objects before conversion.
Source extraction breaks during S/4HANA move
Plan BW and S/4HANA timelines together and move to ODP early.
HANA memory higher than planned
Size with real data and plan data tiering for large ADSOs.
Users lose familiar reports
Agree front-end replacements and train users before cutover.
If your BW is small and mostly used for a few finance reports, S/4HANA embedded analytics may replace it without a BW/4HANA project. If your company has standardized on a non-SAP data platform, compare that route honestly. BW/4HANA makes sense when you have large investments in BW models, many SAP sources and users who depend on its data management.
Frequently asked questions
What are the paths to SAP BW/4HANA?
The main paths are a new installation, in-place conversion of BW 7.5 on HANA, remote conversion into a new BW/4HANA system, and shell conversion that moves metadata without data. The right one depends on system size, cleanup needs and downtime tolerance.
Can we still use InfoCubes in BW/4HANA?
No. BW/4HANA uses advanced DataStore objects in place of InfoCubes and classic DSOs, and CompositeProviders in place of MultiProviders and InfoSets. Conversion tools help transfer existing objects.
Does BW/4HANA work with ECC as a source?
Yes, through ODP-based extraction of ECC DataSources. Classic S-API connections are not supported, so sources must be moved to ODP.
How long does a BW/4HANA conversion take?
Smaller, clean systems may convert in a few months. Large BW estates with custom routines and many queries often take six months to a year or more, usually in phases.
Should we pick BW/4HANA or Datasphere?
BW/4HANA suits companies with large existing BW models that want on-premise or private cloud control. Datasphere suits cloud-first strategies and mixed data sources, and can host BW content through the BW bridge. Many customers run both during transition.