How to use FNDLOAD to migrate lookups, profiles and menus between Oracle EBS instances
How to use FNDLOAD to migrate lookups, profile options and menus between Oracle EBS instances
Also searched as
- FNDLOAD download upload syntax R12
- FNDLOAD afscprof.lct profile option migrate
- FNDLOAD lookup type aflvmlu.lct example
- migrate EBS setup DEV to TEST without re-keying
Short answer
FNDLOAD is the command line utility that downloads AOL setup data into a flat .ldt file using a .lct configuration file, and uploads that file into another instance. The pattern is the same for every object: pick the correct .lct, download with the entity name, review the .ldt, then upload on the target as the APPS user.
Applies to: Oracle E-Business Suite 11i, R12.1 and R12.2 (run from the application tier with the environment file sourced)
Move one lookup type and one profile option from DEV to TEST
- 1Log on to the DEV application tier as the applmgr OS user and source the environment file (for R12.2, the run file system environment).
- 2Download the lookup: FNDLOAD apps/<pwd> 0 Y DOWNLOAD $FND_TOP/patch/115/import/aflvmlu.lct xx_lookup.ldt FND_LOOKUP_TYPE LOOKUP_TYPE="XX_MY_LOOKUP" APPLICATION_SHORT_NAME="FND"
- 3Download the profile: FNDLOAD apps/<pwd> 0 Y DOWNLOAD $FND_TOP/patch/115/import/afscprof.lct xx_profile.ldt PROFILE PROFILE_NAME="XX_MY_PROFILE" APPLICATION_SHORT_NAME="XX"
- 4Open each .ldt in a text editor and confirm it contains only the entity you expect and no unexpected owner or last update values.
- 5Copy the .ldt files to the TEST application tier and source its environment.
- 6Upload: FNDLOAD apps/<pwd> 0 Y UPLOAD $FND_TOP/patch/115/import/aflvmlu.lct xx_lookup.ldt, then the same for afscprof.lct.
- 7Check the log file written to the current directory (L plus a request number .log) for the line that reports the entity and zero errors.
- 8Verify in the forms: Application > Lookups > Common for the lookup, System Administrator > Profile > System for the profile.
How FNDLOAD works and the arguments
FNDLOAD takes a connect string, a 0 for the program mode, a Y for the exit-on-error flag, the action (DOWNLOAD or UPLOAD), the path to a .lct file, the .ldt file name, and for downloads an entity name with filter arguments. The .lct file is the definition: it tells FNDLOAD which tables to read and how to write them back. The .ldt file is the data.
On upload, FNDLOAD matches rows by their natural key (for a lookup, the type plus application) and inserts or updates them. It does not delete rows that exist on the target but not in the file. That one-way behaviour is why a lookup code you removed on DEV still lingers on TEST after an upload.
Because the data is plain text, FNDLOAD output works well under version control. Most customisation teams keep one folder of .ldt files per release and run them in a fixed order from a deployment script.
FNDLOAD apps/<pwd> 0 Y DOWNLOAD $FND_TOP/patch/115/import/aflvmlu.lct xx_lookup.ldt FND_LOOKUP_TYPE LOOKUP_TYPE="XX_MY_LOOKUP" APPLICATION_SHORT_NAME="FND"
FNDLOAD apps/<pwd> 0 Y UPLOAD $FND_TOP/patch/115/import/aflvmlu.lct xx_lookup.ldt
The .lct files you will use most
A short list covers most migrations. afscprof.lct handles profile options (entity PROFILE). aflvmlu.lct handles lookups (FND_LOOKUP_TYPE). afcpprog.lct handles concurrent programs (PROGRAM) and afcpreqg.lct handles request groups (REQUEST_GROUP). afcprset.lct handles request sets. afsload.lct handles menus (MENU). afscursp.lct handles responsibilities (FND_RESPONSIBILITY). afffload.lct handles flexfields, including VALUE_SET, DESC_FLEX and KEY_FLEX.
Each one has its own entity name and its own filter arguments, so copy the exact syntax from a working example and change only the names. If a download returns an empty .ldt, the filter value almost always does not match: lookup types and profile names are case sensitive and the application short name must be the owning application, not the one you are working in.
For concurrent programs the executable must exist on the target first, or the upload of the program fails. Migrate the executable definition in the same run, or register the executable and its file on the target beforehand.
FNDLOAD apps/<pwd> 0 Y DOWNLOAD $FND_TOP/patch/115/import/afcpprog.lct xx_prog.ldt PROGRAM APPLICATION_SHORT_NAME="XX" CONCURRENT_PROGRAM_NAME="XXMYPROG"
FNDLOAD apps/<pwd> 0 Y DOWNLOAD $FND_TOP/patch/115/import/afsload.lct xx_menu.ldt MENU MENU_NAME="XX_CUSTOM_MENU"
Flexfields and the P_LEVEL argument
Descriptive flexfields are moved with afffload.lct and a P_LEVEL parameter that controls how much of the definition is downloaded: columns, references, contexts and segments. A common value is COL_ALL:REF_ALL:CTX_ONE:SEG_ALL, which brings one context and all its segments rather than every context in the flexfield.
Value sets used by those segments are separate entities. If a segment points at a new value set, download VALUE_SET too, and upload it before the flexfield. After uploading flexfield changes you must compile the flexfield from the Descriptive Flexfield Segments form or run the Compile Descriptive Flexfields program, otherwise users do not see the new segments.
Flexfield definitions that are frozen on the target can reject changes, so unfreeze, upload and recompile in a controlled window.
FNDLOAD apps/<pwd> 0 Y DOWNLOAD $FND_TOP/patch/115/import/afffload.lct xx_dff.ldt DESC_FLEX P_LEVEL="COL_ALL:REF_ALL:CTX_ONE:SEG_ALL" APPLICATION_SHORT_NAME="AR" DESCRIPTIVE_FLEXFIELD_NAME="RA_CUSTOMER_TRX_LINES" DESCRIPTIVE_FLEX_CONTEXT_CODE="XX_CTX"
Ownership, CUSTOM_MODE and what gets overwritten
FNDLOAD compares the last update date and owner on each row. By default a row owned by SEED data will not be overwritten by a customer row and a newer target row is not overwritten by an older file row. Adding CUSTOM_MODE=FORCE to the upload command forces the file to win regardless of dates.
Use FORCE deliberately. It is the right choice when TEST has drifted and you want it to match DEV, and the wrong choice when someone legitimately changed a profile value on PROD that the file does not know about.
Profile option values at site, responsibility or user level are not part of the profile definition download. Move them separately, or set them on the target by hand or by script.
Try it here, free
Oracle EBS Application Object Library (FND) Tables Reference
The AOL FND_ tables for applications, users, responsibilities, menus, functions, concurrent processing, messages and profiles in EBS 12.1/12.2.
Common pitfalls
- !Passing the wrong application short name returns an empty .ldt with no error, so always open the file before uploading.
- !Upload never deletes. Removed lookup codes or profile levels stay on the target until you end date or delete them there.
- !Uploading a concurrent program before its executable exists on the target fails.
- !Flexfield changes uploaded but not compiled look like they did nothing to users.
- !CUSTOM_MODE=FORCE can overwrite legitimate target-side changes.
- !Putting the APPS password on the command line exposes it in the process list; use a restricted shell or a wrapper that reads it securely.
How an ERP-grounded AI assistant handles this
An assistant grounded in your EBS metadata can read FND_LOOKUP_TYPES, FND_PROFILE_OPTIONS and the menu tables on DEV and TEST, diff them, and list exactly which objects differ before anyone writes a FNDLOAD command. It can draft the command with the right .lct and entity names for review. Running the upload stays a human step in your change process, and the model runs on your own infrastructure if the metadata is sensitive.
Frequently asked questions
What does the 0 Y mean in a FNDLOAD command?
The 0 is the program mode used by the utility and the Y tells it to exit on error. In practice these two values are copied unchanged from Oracle's own examples. The parameters that vary are the action, the .lct path, the .ldt name and the entity filters after them.
Can FNDLOAD move profile option values and not just the definition?
The profile .lct moves the option definition. Values set at site, application, responsibility or user level are a separate matter and are generally set on the target by hand or by a script against the profile APIs, since the right value usually differs by instance.
Why did my upload report success but nothing changed?
Most often the target row was newer or owned differently, so FNDLOAD skipped it without failing. Re-run with CUSTOM_MODE=FORCE if you intend the file to win, and read the log for the per-entity messages rather than only the final status.
Is FNDLOAD still supported in R12.2?
Yes. In R12.2 you run it from the run file system with the environment sourced. Be aware of online patching rules: seed data uploaded while an adop cycle is active should follow your patching procedure so changes land in the right file system edition.
Related
How to Register a Custom Concurrent Program in Oracle EBS
Registering a custom concurrent program in EBS takes three linked steps in the System Administrator responsibility: register the Executable pointing at your actual code object, register the Program that references that executable and defines its parameters, then add the program to a Request Group so it is visible under the target responsibility's Submit Request window.
How-toHow to Use Forms Personalization in Oracle EBS (No CUSTOM.pll Needed)
Forms Personalization lets you change field properties, set defaults, run built-ins and show messages on any Oracle Forms screen through Help > Diagnostics > Custom Code > Personalize, with no custom library or forms compile required. Rules are stored per form and responsibility in FND_FORM_CUSTOM_RULES and apply at runtime for every user who opens that form.
AdvancedHow the adop Patching Cycle Works in Oracle EBS 12.2
adop, AD Online Patching, applies patches to the offline patch edition of the file system while users keep working on the current run edition, then switches editions in a short cutover window. A standard cycle runs prepare, apply, finalize, cutover and cleanup, each invoked as its own adop phase= command.
How-toSQL query to find profile option values by level in Oracle EBS
Profile definitions live in FND_PROFILE_OPTIONS and FND_PROFILE_OPTIONS_TL. Values live in FND_PROFILE_OPTION_VALUES, keyed by LEVEL_ID (10001 site, 10002 application, 10003 responsibility, 10004 user) and LEVEL_VALUE. Join them to see who has what set and where.
Error fixFix FRM-40735: WHEN-VALIDATE-RECORD Trigger Raised Unhandled Exception ORA-06508
FRM-40735 with ORA-06508 almost always means a PL/SQL package used by the form was recompiled while your session still held the old cached state, or the trigger's own exception handling does not trap a real data error. Exit the form completely and re-enter it; if the error repeats for all users, recompile invalid objects on the database and check for a bad custom trigger.
Error fixOracle EBS Concurrent Manager Will Not Start: How to Fix It
A concurrent manager that will not start in Oracle EBS is almost always one of three things: the node registered in FND_NODES no longer matches the actual hostname (common after cloning), stale OS processes are blocking a fresh start, or the database and listener the manager connects to are unreachable. Check the internal manager log, verify the node name, clear stale processes, and restart with adcmctl.sh.
AI for ERPHosting Oracle EBS on Private Cloud or On-Prem, With Private AI
Hosting Oracle EBS 12.2 on-prem or in a private cloud? Add a private LLM over concurrent programs, interface tables and AP/PO data without moving to Fusion.
AI for ERPAI for Oracle EBS in Aerospace and Defense Manufacturing
AI on Oracle EBS for aerospace and defense manufacturers: project manufacturing, serial control, and ITAR segregation handled without a cloud dependency.
Stuck on Oracle E-Business Suite?
Talk to engineers who work inside Oracle E-Business Suite every week, and who build private AI that answers these questions from your own ERP data.
New to Oracle E-Business Suite? Start with the Oracle E-Business Suite guide and toolkit, or plan with Oracle EBS Roadmap Planner, Training Path Builder, ERP Certification Study Planner.
Keep exploring
Free tools
- Oracle EBS Application Object Library (FND) Tables ReferenceThe AOL FND_ tables for applications, users, responsibilities, menus, functions, concurrent processing, messages and profiles in EBS 12.1/12.2.
- Oracle EBS Forms Personalization Tables and Trigger Events ReferenceThe tables behind Forms Personalization, the trigger events and action types you can use, every common builtin, and the FNDLOAD commands to move rules between instances.
- Oracle EBS Profile Options ReferenceA searchable lookup of the profile options EBS administrators change most: sign-on security, concurrent processing, multi-org, logging and session settings.
ERP fixes and how-tos
- How to Register a Custom Concurrent Program in Oracle EBSRegister a custom Oracle EBS concurrent program end to end: build the executable, define the program and parameters, and add it to a request group so users can run it.
- How to change the APPS password in Oracle EBS with FNDCPASSHow to change the APPS, schema and application user passwords in Oracle EBS with FNDCPASS: syntax by mode, the R12.2 data source step, and mistakes that lock out the system.
- SQL query to find profile option values by level in Oracle EBSSQL to list Oracle EBS profile option values at site, application, responsibility and user level using FND_PROFILE_OPTIONS and FND_PROFILE_OPTION_VALUES, with level IDs.
Runs with your ERP
- Propel Apps Mobile Supply Chain with Oracle E-Business SuitePropel Apps offline-first mobile SCM for barcode receiving, putaway, cycle counts and labels, positioned as an Oracle EBS MSCA replacement. Setup and pitfalls.
- Esker Order Management and Oracle E-Business SuiteHow Esker captures customer POs from email, fax and PDF and creates sales orders in Oracle EBS: integration, data flows, setup, pitfalls and a private AI layer.
- NiceLabel LMS Enterprise and Oracle E-Business Suite Label PrintingPrint Oracle EBS labels with NiceLabel Automation and Loftware Integration for Oracle EBS: how it connects, data flows, setup, migration from LPS and pitfalls.
AI on your ERP
- Getting Oracle E-Business Suite Data Ready for AI: Flexfields, MOAC, Item Master and Custom SchemasGetting Oracle E-Business Suite data ready for AI: flexfields, MOAC operating units, item master, TCA parties, custom XX schemas and EBR in release 12.2.
- Hosting Oracle EBS on Private Cloud or On-Prem, With Private AIHosting Oracle EBS 12.2 on-prem or in a private cloud? Add a private LLM over concurrent programs, interface tables and AP/PO data without moving to Fusion.
Integrations
- How to use ChatGPT with Oracle E-Business SuiteUsing ChatGPT with Oracle E-Business Suite: export vs live access, custom GPT actions over ISG REST, enterprise data controls and when to keep data on-prem.
- How to connect Claude to Oracle E-Business SuiteConnect Claude to Oracle E-Business Suite via MCP, the Anthropic API, AWS Bedrock or Vertex, and know when an on-prem open-weight model is the better fit.