Error fixInfor LNInfrastructure / bshell

Infor LN 'unable to create a session': causes and how to fix it

Error
infor unable to create a session

Also searched as

  • infor ln unable to create session bshell
  • infor ln cannot start session
  • infor ln studio unable to create session

Short answer

This message means the client reached LN but the server could not start the session process (a bshell) or could not load the session. Work from the server side: check the bshell log, licence and user limits, the user's authorizations, and whether the session or its dependent objects exist and are compiled.

Applies to: Infor LN 10.x on-prem and private cloud, LN UI, Web UI and LN Studio.

Diagnose in this order

  1. 1Note whether it fails for one session, one user, or everybody. Everybody points to infrastructure, one user to authorization or licence, one session to the object.
  2. 2Check the bshell logs on the application server (under the BSE log directory) for the time of the failure. A start-up error is usually printed there.
  3. 3Confirm the bshell can actually spawn: free disk space and memory on the application server, temp directory writable, and process limits for the OS account.
  4. 4Verify the user is within licence and concurrent session limits and that the license manager is reachable.
  5. 5Verify the user's authorization for the session (session authorizations and the user template).
  6. 6Open the session code in Studio or the session definition session and confirm it exists, is in the right package VRC and has a compiled object.
  7. 7Retry from a different client (LN UI versus Studio) to separate client problems from server problems.

Infrastructure causes

If many users fail at once, the usual suspects are exhausted process resources, a full BSE temp or log volume, a stopped or unreachable license manager, or a bshell server that was restarted without its dependent services. Windows application servers may also hit desktop heap or service account permission problems.

A change window earlier that day is the best clue. Look for OS patching, a changed service account, or a moved BSE path. The bshell log records the failing start-up step more reliably than the client dialog does.

User and licence causes

Per-user failures usually trace to an expired or locked user, a missing authorization, or hitting the licensed concurrent user ceiling. LN will not always say 'licence' in the client message, so confirm in the licence usage view before changing anything else.

See the related page on 'not authorized to run session' for the authorization path. Copying a working colleague's user template is the fastest way to confirm an authorization cause.

Object causes

A single session failing after a deployment often means a missing or uncompiled object, a wrong package VRC for the user's package combination, or a script that errors in its start-up section. Recompile the session and its libraries, then retest.

For custom sessions built in Studio, check that the session was converted to runtime and that the customization is in the VRC the user's package combination resolves to.

Try it here, free

Infor LN Session Test Script Template

Open full tool

UAT test script for an LN process or session with prerequisites, numbered steps, expected results and tester sign-off.

Common pitfalls

  • !Restarting the application server before capturing the bshell log, which destroys the evidence.
  • !Treating a licence issue as an authorization issue and editing roles unnecessarily.
  • !Recompiling objects in production without a change record.
  • !Assuming the client dialog text is the real root cause.
  • !Ignoring disk space on the BSE log and temp volumes.

How an ERP-grounded AI assistant handles this

An on-prem assistant given read access to bshell logs and the LN authorization tables can triage this: it matches the timestamp to the log line, checks whether the user and session authorizations exist, and gives the admin a ranked list of causes. It does not change anything. Netray builds this as a private retrieval layer, so logs never leave your network.

Frequently asked questions

Where are the LN bshell logs?

They sit under the BSE directory on the application server, in the log folder, with names that start with log.bshell. The exact path depends on your installation, so check the BSE environment variable of the service account that runs LN.

Does this error mean a licence problem?

Sometimes. If all users fail after a threshold of concurrent sessions, check licence usage. Otherwise the cause is more often server resources or an object problem. Do not assume.

Why does it only fail in Studio?

Studio opens sessions for development and needs developer authorizations and the right VRC. A user who can run a session may not be able to open it in Studio.

Will recompiling fix it?

Only if the cause is a missing or stale object. Confirm from the log before recompiling.

Related

Error fix

Infor LN Not Authorized to Run This Session: How to Fix It

Infor LN refuses to open a session with a not authorized message when the logged-in user's assigned role does not include that session, or when the session is blocked for the company they are logged into. Grant the session through Common > Authorization Management > Roles, or check the user's role and company context, and the session opens on retry. In most cases this is a permissions configuration issue, not a bug.

Error fix

Infor LN bshell Process Stuck at 100% CPU: How to Diagnose and Fix It

A bshell process pinned at 100% CPU on the Infor LN application server almost always means one session is stuck in a 4GL loop, scanning an unindexed table, or waiting on a database lock. End the session from the Sessions Monitor first, then kill the OS process only if that fails, and check for a blocking database transaction before assuming it is a bug.

Error fix

Infor LN Studio: compile errors when building DAL/4GL code

A compile error in LN Studio usually traces back to a missing or mismatched package reference, a real syntax error in the DAL or 4GL source, or stale generated metadata that only a full rebuild clears. Read the first error in the log, not the last, since later errors are often cascades from one root cause.

Error fix

Infor LN: "Record is locked by another user" error

This error means another LN session, interactive or batch, is holding an update lock on the same table row you are trying to change. Find the locking user or session in Active Sessions, confirm it is stale rather than genuinely running, and either wait or terminate it before you retry.

Error fix

Infor LN DAL Out of Sync After a Custom Field: Cause and Fix

Infor LN throws a DAL, or table, out of sync error, or simply drops a new custom field silently, when a table's dictionary definition is changed but the generated DAL and dependent forms are not regenerated afterward. Running the standard sequence, table compile, DAL generation, then session/form compile, in Tools > Development after every dictionary change resolves it. Skipping any one of the three steps is what causes the mismatch.

Error fix

Infor LN Jobs Stuck in Active or Waiting: Fix the Job Daemon

Infor LN background jobs, reports, batch processes and print jobs, get stuck in Active or Waiting status when the job daemon on the enterprise server has stopped or lost its connection, or when a prior job crashed without releasing its status. Restart the job daemon and reset the stuck job's status through the Jobs session, and the queue resumes. A daemon that keeps stopping usually points to a memory, license or database connectivity problem on the server.

AI for ERP

AI for Infor LN: Sessions, BODs, and Engineer-to-Order Work

Add grounded AI to Infor LN 10.x or CloudSuite: natural-language answers over sessions and BODs, agents for project and engineer-to-order work, on-prem options.

AI for ERP

AI for Legacy Baan IV/V: Capture the Knowledge Before It Walks Out the Door

Use AI to capture knowledge from ageing Baan IV/V systems, document undocumented customisations, and de-risk a future migration to LN or CloudSuite.

Stuck on Infor LN?

Talk to engineers who work inside Infor LN every week, and who build private AI that answers these questions from your own ERP data.

Get Infor LN and Baan alerts

Support and maintenance deadlines, release changes that affect Infor LN and Baan sites, and new free Infor LN and Baan tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Infor LN and Baan: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Infor LN and Baan? Start with the Infor LN and Baan guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.

Keep exploring

Free tools

ERP fixes and how-tos

Guides

Integrations

Software