Infor LN Bshell Application Server Memory and CPU Sizing Calculator
This calculator sizes memory and CPU for an on-prem Infor LN 10.x application server from the number of bshell processes you expect at peak and the memory each one really uses. It is meant for refresh, virtualisation and consolidation planning where you can measure the current system.
Your numbers
Share of named users logged on at the busiest hour. Count it, do not guess: sample the bshell process list at peak for a week.
1.0 means one bshell per user. Raise it for users with extra bshells from integrations, AFS/BOD connections or several open clients.
Measure the resident memory of bshell processes with ps (Unix/Linux) or Task Manager (Windows) during normal work.
Job daemon and job queue bshells running at peak.
Operating system, LN shared memory, database client, monitoring and backup agents.
Assumption. Most bshells are idle most of the time; lower this for heavy reporting or MRP-type users.
Your results
This is a measurement-based rule of thumb, not an Infor sizing formula. Every default is an editable assumption; replace them with values measured on your own LN server, and use Infor's sizing service for contractual hardware commitments.
RAM (GB) and cores vs named users
Sweeps Named users from 50 to 1000, holding your other inputs fixed.
Send us your bshell measurements
Share your peak bshell count, average resident memory and user numbers and we will review the sizing with you.
Optional. The tool and every export work without this. No spam.
How the estimate works
In LN each logged-on user session runs in a bshell process on the application server, and background jobs run in their own bshells. The calculator multiplies named users by peak concurrency and by bshells per user, adds job bshells, then converts that peak count into memory (count times measured MB per bshell, plus OS and services overhead, plus headroom) and into cores (count divided by how many bshells one core carries, plus headroom, rounded up). Nothing here is an Infor formula: it is arithmetic over numbers you measure. Infor publishes performance and tuning guidance for LN on docs.infor.com; check it for your release and use any figure it gives in place of these defaults.
- Peak bshells = users x concurrency x bshells per user + job bshells
- RAM GB = (peak x MB per bshell / 1024 + overhead GB) x (1 + headroom)
- Cores = ceil(peak / bshells per core x (1 + headroom))
How to measure bshell memory and concurrency
On Unix or Linux, list the bshell processes at the busiest hour with ps and their resident size (RSS), then average them; repeat over several days, because bshells grow while users open sessions and run large reports. On Windows use Task Manager or a performance counter on the bshell processes. Count how many bshells exist at peak: that count divided by named users gives your real concurrency times bshells per user. Count job daemon bshells separately. Shared memory and the database client libraries are counted once, in overhead, so do not double count them in the per-bshell figure.
Worked example
With 250 named users, 60 percent peak concurrency and 1.2 bshells per user you get 180 interactive bshells, plus 10 job bshells, so 190 at peak. At 60 MB each that is about 11.1 GB, plus 8 GB overhead, times 1.3 headroom, so about 24.8 GB of RAM. At 12 bshells per core, 190 bshells need 15.8 cores, times 1.3 is 20.6, rounded up to 21 cores. If you move to 400 users the chart shows RAM and cores rising in a straight line, which is why measured concurrency matters more than the named-user count.
Session timeouts and idle bshells
Idle bshells still hold memory. If users leave LN open all day, peak concurrency approaches 100 percent of logged-in users even when few are working. An idle session timeout reduces that, but set it with the business: a timeout that ends sessions during long data entry costs more than the RAM it saves. Before you add memory, check how many bshells at peak belong to users who have not done anything for an hour; the answer often changes the sizing more than any hardware option.
Frequently Asked Questions
How many active users can an Infor LN application server handle?
There is no fixed number. It depends on how many bshells each user creates, how much memory each bshell holds, and how heavy the sessions are. Measure bshell count and resident memory at your busiest hour, then use this calculator to translate that into RAM and cores for the user count you plan to support.
What is a bshell in the LN session architecture?
The bshell is the LN runtime process on the application server that executes sessions and 4GL or 3GL logic for a user or a job. Clients such as LN UI connect to a bshell, which talks to the database through the database driver. More open bshells means more server memory, so bshell count is the main sizing driver.
Does the session timeout setting reduce server memory?
It can, because idle sessions keep their bshell alive and hold memory. Ending idle sessions after a defined period lowers the peak bshell count. Agree the timeout with users first, and measure the bshell count before and after so you size from the real effect rather than an expectation.
Is 60 MB per bshell an Infor number?
No. It is an editable starting assumption. Real values vary with LN release, sessions used, report sizes and customisations. Replace it with the average resident size you measure on your own server at peak. If Infor guidance for your release gives a figure, use that instead.
If you want your LN users to ask questions about orders, stock and jobs in plain English on your own servers, we can add a private AI layer next to this LN system.
Related Tools
Infor LN Database Growth by Table Calculator
Estimate how fast the main LN 10.x transaction tables grow from your order volumes, and how many GB you need after N years.
Infor LN & BaanInfor LN Batch Job Window Calculator
Estimate batch duration from records, throughput and parallel processes, and find the processes needed to fit a nightly window.
Infor LN & BaanInfor LN Performance Tuning Checklist
A 30-point practitioner checklist for diagnosing and fixing Infor LN performance problems across database, application tier, batch jobs, custom code, and monitoring.
Infor LN & BaanInfor LN PMC Solution Backlog Patch Effort Calculator
Size the work of installing a backlog of LN solutions with PMC, including missing prerequisites, collisions with your customizations and regression testing.
More Infor LN & Baan tools
See all- Infor LN Session and Module Code Reference
- Infor LN Production Order Status and Lifecycle Reference
- Infor LN 4GL Session Script Template
- Infor LN Company and Enterprise Unit Design Worksheet
- Infor LN DAL Hook Review Checklist
- Infor LN Warehousing Order Origins and Types Reference
- Infor LN Table Name and SQL Query Builder
- Infor LN Regression Test Effort Calculator
- Infor LN and Baan Customization Inventory Worksheet
New to Infor LN and Baan? Start with the Infor LN and Baan guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.
Keep exploring
Free tools
- Infor LN AI Assistant Sizing and Value CalculatorSize the GPUs and estimate the monthly value and payback of a private, on-prem AI assistant for Infor LN.
- Infor LN Enterprise Server Error Codes and Log Files ReferenceLook up bshell and database driver error numbers, what they mean, what to check first and which log file to read.
- Infor LN Database Growth by Table CalculatorEstimate how fast the main LN 10.x transaction tables grow from your order volumes, and how many GB you need after N years.
ERP fixes and how-tos
- Infor LN bshell Process Stuck at 100% CPU: How to Diagnose and Fix ItInfor LN bshell pegged at 100% CPU blocks sessions from responding. Here are the real causes, how to trace the hung process on the app server, and the fix.
- Infor LN 'unable to create a session': causes and how to fix itFix Infor LN or Studio failing to create a session: bshell start-up, licensing, authorizations, session code and server-side logs to check, in order.
- Infor LN Process Variables: Meaning, Setting and InspectingWhat process variables and bshell environment variables mean in Infor LN, how developers read and set them, and where to look when behaviour differs per user.
Guides
- Infor LN BShell Customization GuideMaster Infor LN BShell customization. 4GL programming patterns, session scripting, DLL extensions, and upgrade-safe customization techniques.
- Infor LN Performance Tuning GuideTune Infor LN for optimal performance. Database optimization, session server tuning, batch processing acceleration, and bottleneck diagnosis.
- Infor LN BShell Programming: Developer Fundamentals GuideMaster Infor LN BShell scripting with this developer guide covering 4GL syntax, database operations, session hooks, and debugging techniques for BAAN/LN ERP.