SAP QM Inspection Lot Origins Reference
The inspection lot origin tells SAP QM which event created the lot. Knowing the origin is the fastest way to find out why a lot was or was not created.
| Origin | Event that creates the lot | Typical transaction | First thing to check if no lot appears |
|---|---|---|---|
01 | Goods receipt for a purchase order | MIGO | QM view of the material, inspection type 01 active, plant level QM in procurement |
04 | Goods receipt from a production order | CO11N, MIGO | Inspection type 04 active and plan found for the produced material |
05 | Goods receipt without a PO or production order | MIGO | Movement type linked to the origin and inspection type 05 active |
08 | Stock transfer posting | MIGO, MB1B | Inspection type 08 active in the receiving plant |
09 | Outbound delivery | VL01N, VL02N | Inspection type 09 active and SD delivery type allows inspection |
14 | Recurring inspection of stock | QA07 | Recurring inspection interval and inspection type 14 in the material master |
15 | Inspection of a production resource or tool | QA01 | PRT usage and inspection type 15 active |
89 | Manual creation of an inspection lot | QA01 | Inspection type 89 active and plan or specification entered |
Origins and their link to movement types are customizing. Confirm in SPRO, Quality Management, Quality Inspection, Inspection Lot Creation, and test with a real posting.
Optional help with missing inspection lots
Send us a case where lots are not created and we will help trace it through master data and customizing.
Optional. The tool and every export work without this. No spam.
How to use this reference
Find the event in your process, such as a goods receipt or a delivery, and read the origin and the first thing to check. If the lot is missing, work through the check column in order. If a lot appears but follows the wrong plan, look at the origin in the lot header and compare it with the inspection type in the material master.
How origins relate to inspection types
The origin is stored in the inspection lot and describes the process that created it. The inspection type is the setting that activates it for a material and plant. In standard setups both use the same numbers, which is why the two lists look alike. The origin also decides which movement types and documents can create lots and how stock is posted into quality inspection.
- Origin is a property of the lot
- Inspection type activates the origin for a material
- Movement types are linked to origins in customizing
- Lot header shows origin and inspection type together
Troubleshooting missing lots
Work through four checks. First, confirm that the event posted successfully. Second, read the QM view of the material in the plant that received the goods. Third, check customizing for the movement type and origin. Fourth, test with a manual lot using QA01 to prove the plan and inspection setup are correct. This sequence usually isolates whether the problem is master data, configuration or the event itself.
- Posting completed and document number exists
- Inspection type active in the correct plant
- Movement type linked to the origin
- Plan with correct usage and status found
Frequently Asked Questions
Where do I see the origin of an inspection lot?
The lot header, for example in QA03, shows the inspection lot origin and the inspection type. You can also use QA32 and add the origin to the list layout.
Why does a manual lot use origin 89?
Manual creation with QA01 uses the manual origin, so it does not depend on a goods movement. It is helpful for tests and ad hoc inspections.
Can I add my own inspection lot origin?
Yes, customizing allows custom origins, but plan this carefully. Each new origin needs inspection type settings, links to movement types and testing. Most companies reuse the standard ones.
Do S/4HANA releases change these origins?
The core origins remain, but details and apps differ by release. Always check your own system and release notes.
Netray can add an AI layer over SAP QM tables so teams ask why a lot was not created and get a grounded, read only answer. Reach out if that would help your support team.
Related Tools
SAP QM Inspection Types Reference
Look up the standard SAP QM inspection types, what business event triggers each one and what you must set up in the material master and inspection plan.
SAPSAP QM in Procurement Setup Checklist
Check each step needed to run goods receipt inspection for purchased materials, from QM control key to vendor release.
SAPSAP QM Usage Decision Codes Worksheet
Plan usage decision code groups and codes, with valuation, stock posting and quality score, before you configure them in SAP QM.
SAPSAP QM Quality Notification Types Reference
See what the standard SAP quality notification types Q1, Q2 and Q3 are for, and how related PM types differ.
More SAP tools
See all- SAP QM Sampling Procedure Design Template
- SAP Master Inspection Characteristic Upload Worksheet
- SAP QM Dynamic Modification Rule Calculator
- SAP PM Breakdown Notification Request Form Template
- SAP PM Measuring Point and Counter Readings Worksheet
- SAP PM Maintenance BOM and Spare Parts Cost Worksheet
- SAP PM Work Clearance and Work Permit Template
- SAP PM Spare Parts Kitting and Reservation Worksheet
- SAP PM Catalog and Code Group Design Worksheet
Keep exploring
Free tools
- SAP QM Inspection Types ReferenceLook up the standard SAP QM inspection types, what business event triggers each one and what you must set up in the material master and inspection plan.
- SAP QM in Procurement Setup ChecklistCheck each step needed to run goods receipt inspection for purchased materials, from QM control key to vendor release.
- SAP QM Inspection Plan Planning WorksheetA planning table for inspection operations, characteristics, limits, sample and effort, ready to review before QP01 entry.
ERP fixes and how-tos
- What Is First Article Inspection in SAP, and How to Run It in QMFirst article inspection in SAP means inspecting the first piece of a production run through QM. Learn the inspection type, lot trigger and results recording.
- How to Create a Status Profile in SAP QM (BS02)Create a user status profile in SAP QM with BS02 and assign it to quality notifications, tasks and inspection lots, with status numbers and business transaction control.
- How to create an inspection plan in SAP QM (QP01)Create an inspection plan in SAP QM with QP01: header, operations, master inspection characteristics, sampling procedure and material assignment, plus a plan report.