Aerospace & DefenseFree templatePDF, Excel, Word exportAerospace

AS9100 Audit Report Example and Management Review Example

People searching for an AS9100 audit report example usually want to see how findings, evidence and conclusions read when written properly. This page gives a filled internal audit report plus matching management review minutes that you can edit and export.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

AS9100 Audit Report and Management Review Example

Internal Audit Report (example)

Organization: Skyline Aerostructures LLC Audit date: 2026-09-16 Lead auditor: K. Nowak Scope: Clause 8.4 control of external providers and 8.5.1 production control, Machining cell 2 Criteria: AS9100D, company procedures QP-08.4 and QP-08.5, customer flow-down requirements

Audit conclusion

The processes audited are generally effective. Two minor nonconformities and one observation were raised. No evidence of nonconforming product shipped.

Findings

RefTypeDescription and evidenceCorrective action due
1Minor NCClause 8.4.1: approved supplier list shows a special process supplier with a lapsed Nadcap accreditation date; no record of verification. Evidence: ASL rev 14, supplier record SP-031.30 days
2Minor NCClause 7.1.5.2: bore gauge ID G-204 used on 2026-09-10 was 6 days past calibration due date. Evidence: calibration register, job traveler 55182.30 days
3ObservationOperator work instructions at cell 2 do not show the latest key characteristic call-outs on the drawing. Consider linking instruction revision to the drawing change.Consider

Positive practice

First article records for new parts are complete and traceable to the ERP routing.

Management Review Minutes (example, AS9100D clause 9.3)

Date: 2026-10-08 Attendees: President, VP Operations, Quality Manager, Supply Chain Manager, Engineering Manager, Management Representative

Inputs reviewed

InputSummary
Status of actions from previous reviewsPrevious actions reviewed; two closed, one carried forward
Changes in external and internal issuesNew customer flow-down on counterfeit part prevention
Delivery and quality performance, customer satisfactionOTD 93 percent against target 95. Customer rejects 0.8 percent of lots. Escapes: 1 customer complaint on burr removal, 8D closed.
Audit results, nonconformities and corrective actionThe processes audited are generally effective. Two minor nonconformities and one observation were raised. No evidence of nonconforming product shipped.
Performance of external providersTwo suppliers on watch for late delivery. Special process suppliers reviewed against accreditation status.
Risks and opportunities, resourcesResource gap flagged for machining capacity

Decisions and actions

1. Add Nadcap expiry alert to ASL, owner Supply Chain, due 2026-11-15. 2. Approve capacity study for cell 2, owner Operations, due 2026-12-01. 3. Add calibration due date check to travelers, owner Quality, due 2026-11-01.

Approval

Lead auditor / Date
Management representative / Date
Top management / Date

This is a fictional example for training and template use. Replace every field with your own audit evidence. AS9100D requirements and your registrar or customer rules take precedence. Aerospace organizations typically include on-time delivery and quality performance in management review inputs.

Audit evidence from your ERP

Optional: discuss a private on-premises AI that finds audit records across ERP and quality systems.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the example

Read the filled defaults to see the level of detail an auditor should record, then overwrite each field with your own audit data. Export to PDF or Word and issue it through document control. A good report names the clause, states the requirement paraphrased, describes the evidence seen and is specific enough that someone else could find the same record.

What a good audit finding contains

A defensible finding has three parts: the requirement (clause or procedure), the objective evidence (document, date, ID, record) and the statement of how the evidence fails the requirement. Classify it as a major nonconformity, minor nonconformity or observation using your own procedure. Avoid opinions and avoid naming people; cite records.

  • Requirement: which clause or procedure step
  • Evidence: record number, date, gauge or part ID
  • Gap: the specific shortfall, not a general complaint
  • Containment and corrective action owner with a due date

Management review under AS9100D

Clause 9.3 requires top management to review the QMS at planned intervals. Inputs include status of earlier actions, changes in issues, performance and effectiveness information such as customer satisfaction, audit results, external provider performance, resources and risk actions. Aerospace organizations add on-time delivery and quality performance. Outputs are decisions on improvement, any QMS changes and resource needs, recorded as actions.

Common mistakes

Reports that say procedures are not followed without citing a record are hard to close. Management reviews that recap the audit but record no decision fail the intent of the clause.

  • No objective evidence in the finding
  • Corrective action without root cause or due date
  • Management review inputs missing delivery and external provider data

Frequently Asked Questions

What must an AS9100 internal audit report include?

At minimum the scope, criteria, auditor, date, findings with objective evidence, conclusions and follow-up actions. Your procedure should say who receives it and how findings are tracked to closure.

How is this different from the AS9100 internal audit report template?

This page is a filled example so you can see wording and level of detail, combined with a management review sample. Use it alongside a blank template for your own audits.

How often must management review happen?

At planned intervals defined by the organization. Annual is common, and many aerospace suppliers review more often to track delivery and quality performance.

Is this example acceptable to a registrar as is?

No. It is fictional and for guidance. Your own report must reflect your actual audit evidence and your registrar and customer requirements.

If your audit evidence sits in ERP, calibration and supplier systems, Netray can add a private AI layer on-premises so auditors can pull records quickly without sending data outside. Contact us for a walkthrough.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

AI on your ERP