Engineering & PLMFree templatePDF, Excel, Word exportAerospace

Key Characteristic Control Plan Template

Key characteristics are the features customers choose because variation in them affects form, fit, function, performance or service life. A key characteristic control plan makes sure someone measures them in the right way, at the right frequency, and knows what to do when they drift.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

Key Characteristic Control Plan Template

Key Characteristic Control Plan

Company: Acme Precision Aerospace Inc. Part number: PN-48213 Drawing revision: C Control plan revision: A Date: 2026-10-20 Customer: Tier 1 aerostructures customer Reference: AS9100D clause 8.5.1, SAE AS9103 (variation management of key characteristics) and customer designation of key characteristics.

Key characteristic control

KC #Characteristic and toleranceOperationMeasurement methodSample planCpk target
KC-1Bore diameter 25.000 +0.013 / -0.000 mmOP30 finish boreAir gage, master ring verified each shift100% of parts, SPC chart every 5th part1.67
KC-2Position of 4 holes, 0.05 mm to datum A, BOP40 drill and reamCMM per program, fixture ID recordedFirst 3 parts per lot then 1 in 51.33

Measurement system

KC #Gage IDResolutionCalibration dueGR&R resultNotes
KC-1
KC-2

Reaction plan

Stop production, quarantine parts since the last good check, notify quality, contain and sort, investigate root cause, and restart only with quality approval after a verified first piece.

If a sample is out of tolerance, stop and check the last good measurement. Quarantine all parts produced since. If the Cpk from the latest study falls below the target, treat the characteristic as not capable and move to 100% inspection until the process is corrected.

Capability review

Initial capability: collect at least 30 consecutive parts in stable conditions. Compute Cpk as the lesser of (USL minus mean) divided by three standard deviations and (mean minus LSL) divided by three standard deviations. Record the result with date, machine, and operator. Re-verify after any tool change, program change, fixture change or process change.

Approvals

Manufacturing engineer / Date
Quality engineer / Date
Customer representative, if required / Date

A customer designates key characteristics and can set the required capability and sample plan, which override the defaults here. This template is a starting point and does not copy any customer or standards form. Sampling and Cpk targets are examples; use those in your contract or procedure.

Live Cpk from inspection data

Want key characteristic capability updated from your inspection data? We can show a practical setup.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the template

Start from the customer's list of designated key characteristics and the drawing. Enter the part information, then describe up to two key characteristics in the fields and add more rows in the exported document if you have more. For each one, record the operation that produces it, the measurement method and gage, the sample plan, and the capability target. The reaction plan is common to all but you can write one per characteristic. Export to Word to add the rest of your routing detail and put the document under revision control.

Standards and method behind it

SAE AS9103 describes variation management of key characteristics: identify them, plan how to control them, collect data, analyze capability and take action. AS9100D clause 8.5.1 requires controlled conditions for production including monitoring and measurement. The usual capability index is Cpk, the smaller of (USL minus mean) over three sigma and (mean minus LSL) over three sigma. A common target in aerospace is 1.33 for ordinary and 1.67 for critical characteristics, but the customer sets the requirement.

  • Cpk = min((USL - mean)/(3 sigma), (mean - LSL)/(3 sigma))
  • Use at least 30 consecutive parts for an initial study
  • Measurement system should be capable before the process is judged

Sampling and reaction plans that hold up

Choose sampling by risk and capability. A characteristic with Cpk well above target may be sampled lightly, while a poorly capable one needs 100 percent inspection until improved. The reaction plan must say who stops the process, what happens to suspect parts and who can restart. Keep it short enough that an operator on night shift can follow it. Test it: ask an operator what they would do when a point goes out of control.

Common mistakes

Control plans often list every dimension instead of the key characteristics, which dilutes attention. Others set a Cpk target but never calculate it. Another gap is ignoring the measurement system, so apparent drift is really gage noise. Finally, plans are written once and not revised after a tool change, a customer revision or an escape. Treat the plan as a living record tied to the drawing revision.

Frequently Asked Questions

What is the difference between a key characteristic and a critical dimension?

A key characteristic is designated by the customer or design authority because variation affects fit, function or life, and it triggers variation management. A critical dimension is an informal term. Always use the customer designation when there is one.

What Cpk should I target?

Follow the customer requirement first. Where none exists, 1.33 is a common minimum for capability and 1.67 is used for more critical features. Choose the target in your procedure and apply it consistently.

Is this the same as a PPAP control plan?

No. PPAP is an automotive process with its own control plan format. This template follows the intent of aerospace key characteristic management and can be adapted to a customer's own form.

How many parts do I need to calculate Cpk?

At least 30 consecutive parts from a stable process is the usual guideline. Smaller samples give wide uncertainty. For low volume parts, use the customer's guidance or a Ppk study with documented limitations.

We can connect inspection results from your CMM and ERP to a live capability view so Cpk is calculated for you instead of in spreadsheets.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring