Manufacturing & OperationsGlossary

What Is Labor Reporting?

Also known as: labor tracking, time and attendance vs job labor, job labor reporting, labor transactions

Definition

Labor reporting is the recording of the hours each employee spends on specific jobs, operations or indirect activities, so that the ERP can calculate actual job cost, labor efficiency and payroll distribution.

Labor Reporting Explained

Direct labor is time spent working on a job operation, such as setup or run. Indirect labor is time on activities that support production but are not attributable to one job, such as cleaning, training or waiting for material. Both are reported, because efficiency and absorption depend on the full picture.

Reporting can be job-based (start and stop on each operation), batch-based (hours entered at end of shift) or machine-based (hours inferred from machine run time). The more detailed the capture, the more accurate the costing, but the more effort at the floor. The compromise is often a badge scan at start and stop, with exceptions managed by supervisors.

In Infor SyteLine, labor is posted through Job Order Transactions or Shop Floor Data Collection with labor rates from the employee and work center. Infor LN reports hours through shop floor control and hours accounting sessions. Labor reporting is separate from time and attendance, which tracks paid hours; reconciling the two is a common control to catch missing or double-reported time.

Why It Matters

  • Actual labor drives job cost and variance analysis against standard.
  • Accurate hours support quoting: you quote from real history, not guessed routing times.
  • Reconciling job hours to paid hours exposes unreported time and inflated entries.
  • Contracts like cost-plus government work require labor to be charged accurately to the correct job.

In Practice

An operator is paid 8 hours but job labor shows 6.2 hours across three jobs, 0.8 hours indirect and 1.0 hour unreported. A daily reconciliation report flags the gap for the supervisor. Over a month, the shop finds one cell consistently under-reports, which explains why its jobs always look more profitable than the rest.

Frequently Asked Questions

What is the difference between direct and indirect labor?

Direct labor is attributable to a specific job or product, such as machining. Indirect labor supports the operation generally, such as cleaning or supervision.

How is labor efficiency calculated?

Earned hours (standard hours for the quantity produced) divided by actual hours reported, usually shown as a percentage.

Is labor reporting the same as time and attendance?

No. Time and attendance records paid presence; labor reporting allocates working time to jobs. They should be reconciled.

Working with Labor Reporting in a live environment? Our engineers do this every day - and our AI agents automate most of it.

Try it here, free

Direct Labor Rate and Efficiency Variance Calculator

Open full tool

Break the difference between actual and standard direct labor cost into a rate variance and an efficiency variance.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP