How to Receive a PO in Epicor and Run the 3-Way Match
how to receive in epicor
Also searched as
- epicor 3 way match
- how to use fulfillment workbench in epicor kinetic
- epicor receipt entry purchase order
Short answer
In Epicor you receive purchased material in Receipt Entry (Purchase Management > Receiving): enter the vendor packing slip, pull the PO lines, key the received quantity and save. The three-way match then compares the PO, the receipt and the AP invoice in AP Invoice Entry, so you pay only what was ordered and received. Fulfillment Workbench is the outbound counterpart for sales orders.
Applies to: Epicor 10.x and Kinetic, on-prem and private cloud
How to receive against a purchase order
- 1Confirm the PO is approved and released. Unapproved PO releases cannot be received.
- 2Open Receipt Entry from the Purchase Management area (or menu search 'Receipt Entry').
- 3Create a new receipt: enter the supplier and the vendor packing slip number, and the receive date.
- 4Select the PO and the release lines you are receiving. Use the PO lookup or the receipt detail's PO selection.
- 5Enter the received quantity per line, the unit of measure and, where used, lot, serial or bin details.
- 6Choose the warehouse and bin for stock receipts, or let direct job and direct sales order demand receive straight to the job or shipment.
- 7Save and, if your process requires it, run the receipt through inspection before it reaches stock.
- 8Review the receipt in Receipt Tracker or the PO tracker to confirm received quantity updated.
What the three-way match checks
A three-way match ties together three documents: the purchase order (what you agreed to buy and at what price), the receipt (what physically arrived) and the supplier invoice (what they bill). In Epicor, AP Invoice Entry lets you pull received PO lines onto the invoice so quantity and price arrive from the PO and receipt, and you reconcile the invoice against them.
Differences show up as price or quantity variances. Common causes are partial shipments, supplier price changes not reflected on the PO, and receipts keyed against the wrong release. Fix the PO or receipt first when the fault is on your side, and use the invoice tolerance and hold options to decide whether small variances pass.
Receiving variations
Direct-to-job receipts (for subcontract or job-specific purchase) skip stock and attach cost to the job. Stock receipts go to a warehouse and bin. Receiving inspection can hold material in an inspection location until quality releases it.
Over-receipts are controlled by the PO's over-receipt tolerance. If the supplier shipped more than the tolerance, change the PO or return the excess rather than forcing the receipt.
Where Fulfillment Workbench fits
Fulfillment Workbench is a sales-side tool. It lets shipping and customer service view order releases that are ready to fulfil, check allocation and stock, and drive picking and shipment creation from one screen. It does not receive purchases.
If your goal is to ship against sales orders, learn Fulfillment Workbench together with pack-out and shipping entry. If your goal is to receive, stay in Receipt Entry.
Try it here, free
Epicor Kinetic Job Status Reference
A searchable lookup of the job lifecycle flags and related fields in Epicor Kinetic job entry, so you can build BAQs and dashboards with the right filter.
Common pitfalls
- !Receiving against an unapproved or closed PO release fails; check approval status first.
- !A wrong vendor packing slip number makes later invoice matching harder because staff search for the paperwork.
- !Keying quantities in the wrong unit of measure silently skews stock and cost.
- !Matching an invoice before the receipt is entered forces manual overrides that auditors later question.
How an ERP-grounded AI assistant handles this
A grounded assistant can list open PO lines that have been invoiced but not received, or received but not invoiced, straight from the PO, receipt and AP tables. That gives AP and purchasing a daily exception list rather than discovering mismatches at month end. Netray's ERPray is read-only by default, so it flags the exceptions without changing receipts.
Frequently asked questions
What is the three-way match in Epicor?
It is the comparison of the purchase order, the receipt and the supplier invoice before payment. Quantity and price on the invoice should agree with what was ordered and received, within your tolerance.
Why can I not receive my PO in Epicor?
Typical causes are the PO release not approved, the line closed or already fully received, wrong company or plant, or missing permission to Receipt Entry. Check the PO tracker for status first.
Is Fulfillment Workbench used for receiving?
No. It is used on the sales side to process order releases for picking and shipping. Receiving uses Receipt Entry.
Can I receive part of a PO?
Yes. Receive the partial quantity on the release; the remainder stays open. Later receipts apply to the same line until it is fulfilled or closed.
Related
How to Issue Material in Epicor Kinetic
In Epicor Kinetic you issue material to a job either manually with Issue Material (against the job material line, from a bin and lot) or automatically through backflush when labor is reported. Substitutions are handled by changing the job material part or using the alternate part on the material line, and requests can be routed through the material queue so the warehouse pulls and issues them.
Error fixEpicor: No Employee Attached to User, Supplier Not Approved, Serial Mask Tokens
"No employee attached to user" means the signed-in user account is not linked to an employee record in that company, so shop floor and time entry screens cannot identify who is working. Fix it by linking the user and the employee. Supplier-not-approved errors come from approved supplier settings, and serial mask tokens are configured on the serial mask setup used by the part.
How-toEpicor Kinetic Costing Workbench: Part Cost, Rollup and Material Burden
In Epicor Kinetic, part cost is held in cost buckets (material, labor, burden, subcontract, material burden) per costing method. The Costing Workbench is where you view and maintain those costs, and a cost rollup walks the bill of materials and routing to compute a standard cost from lower levels. Material burden is a percentage or amount added on top of material cost, set in costing configuration rather than on the BOM.
Error fixFixing Epicor BusinessObjectException: BPM Directive Errors
A BusinessObjectException that says "A Business Process Management (BPM) directive has raised the following error" means a directive on that business object stopped the transaction, either deliberately via a Raise Exception widget or accidentally via an unhandled .NET error in Custom Code. Expand the InnerException on the error dialog to see the real message and the directive name, then open BPM Designer for that object and method to find the widget that fired.
How-toFixing a Slow Epicor BAQ (Business Activity Query)
A slow BAQ in Epicor is usually caused by unindexed join columns, a subquery or calculated field forcing a table scan, or the BAQ pulling far more rows than the dashboard actually displays before filtering client-side. Fix it by reading the SQL Server execution plan Epicor generates, moving filters into the BAQ criteria instead of the dashboard filter panel, and replacing subqueries with joins where possible.
How-toEpicor MRP Runs but Generates No Suggestions
When Epicor's MRP process completes without a job or purchase suggestion for a part you expect one for, the cause is almost always the part's own configuration (Part Class Type, Make Direct, Non-MRP flag, planning Time Fence) or the demand not being linked in a way MRP recognizes, not a defect in the MRP engine. Work through the part's Planning tab, its safety stock and lead time setup, and the demand source (sales order line status, job material requirement) before assuming the run itself failed.
AI for ERPAI for Epicor Kinetic, Beyond What Prism Covers
Add AI to Epicor Kinetic beyond Prism: private LLM over BAQs, BPM data, and REST v2, on-prem or private cloud, with honest guidance on when Prism already covers you.
AI for ERPPrivate AI for Epicor Kinetic Cloud, Outside the Multi-Tenant Boundary
Run a private LLM on Epicor Kinetic private cloud or Kinetic Cloud data via BAQs, REST v2 and Data Fabric, keeping sensitive manufacturing data off shared AI.
Stuck on Epicor Kinetic?
Talk to engineers who work inside Epicor Kinetic every week, and who build private AI that answers these questions from your own ERP data.
New to Epicor ERP? Start with the Epicor ERP guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.
Keep exploring
Free tools
- Epicor Kinetic Job Status ReferenceA searchable lookup of the job lifecycle flags and related fields in Epicor Kinetic job entry, so you can build BAQs and dashboards with the right filter.
- Epicor Kinetic Upgrade ChecklistA phase-by-phase upgrade checklist covering inventory, testing, integrations, cutover and rollback for Epicor Kinetic.
- Epicor Kinetic Data Load Effort CalculatorEstimate total data migration hours for an Epicor project from record counts, error rate and number of test cycles.
ERP fixes and how-tos
- Epicor Kinetic Costing Workbench: Part Cost, Rollup and Material BurdenHow Epicor Kinetic part cost works: the Costing Workbench, cost rollup for standard cost, material burden, and a practical cost review routine.
- How to Complete an Operation in Epicor Kinetic (Plus Time Entry and Corrective Action)Complete an operation in Epicor Kinetic through MES or Labor Entry, plus time and expense entry, customer managed inventory and corrective action, with what to check first.
- How to Create a BPM Method Directive in Epicor KineticHow to build a Method Directive in Epicor Kinetic: choose the business object method, pre or post processing, add conditions and actions, test, and deploy safely.
AI on your ERP
- Private AI for Epicor Kinetic Cloud, Outside the Multi-Tenant BoundaryRun a private LLM on Epicor Kinetic private cloud or Kinetic Cloud data via BAQs, REST v2 and Data Fabric, keeping sensitive manufacturing data off shared AI.
- AI for Epicor Kinetic Estimating and Quoting: Faster Quotes Grounded in Your Own Job HistoryAI for Epicor Kinetic quoting: draft quotes from RFQs, find similar past jobs, check cost against actuals, and keep drawings and pricing on your own servers.
Integrations
- How to add document OCR to Epicor KineticCapture invoices, packing slips, certs of conformance and drawings into Epicor Kinetic with OCR, confidence thresholds, PO matching and human review.
- How to add document OCR to Epicor Prophet 21Capture vendor invoices, packing slips and receiving documents into Epicor Prophet 21 with OCR, three-way match and confidence-based human review.
Software
- Epicor KineticEpicor Kinetic explained for manufacturers: modules, REST API, BAQs, deployment, strengths, limits and alternatives to compare before choosing or upgrading.
- Epicor CPQEpicor CPQ is a cloud configure-price-quote product with visual 3D configuration for manufacturers. Modules, ERP integrations and alternatives explained.