How to add a mobile app to Priority ERP
Short answer
Start with what Priority already offers for mobile access, then build a focused app for scanning, inventory moves and labor reporting over the OData API where it falls short. The design hinges on offline behavior, barcode flows and server-side validation.
Priority runs in the browser and has mobile access options, which covers sales reps checking customers and managers approving documents. The gap shows up on the shop floor and in the warehouse, where users need a scan-first, few-tap workflow on a rugged handheld rather than the full forms.
A good mobile app is narrow. It does three to five jobs fast, such as receiving against a PO, moving stock between bins, reporting labor on a work order, and counting. Everything else stays in the main Priority screens.
This page covers how to decide between built-in options and a custom app, which Priority interfaces to build on, and the offline and validation problems that decide whether operators trust the app.
What teams use it for
Goods receiving against a purchase order
Scan the PO or packing slip barcode, show expected lines, scan items and enter quantities, then create the receipt in Priority.
Warehouse transfers and bin moves
Scan source bin, part and destination bin to post a transfer, with checks for available quantity and valid locations.
Work order labor and completion reporting
Operators scan a work order and operation to start and stop time, report good and scrap quantities, and see the next step.
Cycle counts
Counters receive a list of locations, scan and enter quantities, and submit variances for supervisor approval before adjustment.
Pick and ship confirmation
Pickers scan parts against a pick list for a sales order, and shipping confirms the delivery with packing details.
Field service visit reporting
Technicians view assigned service calls, log time and parts used, capture a photo and customer signature, and sync back to the call record.
Priority ERP integration surface
- Priority OData REST API for reading parts, bins, orders and work orders, and for creating receipts, transfers and reports through forms with their normal validation.
- Priority Web SDK, useful for building a web-based mobile client that runs forms logic in the application layer.
- Priority's built-in mobile access and any partner mobile modules, whose features vary by version and should be evaluated first.
- Priority interfaces and procedures for batch-loading counts or transactions captured offline.
- Barcode and label design in Priority, since the app depends on what is printed on labels (part, lot, serial, bin, document).
How it works
- 1
Audit the built-in options
Try Priority's own mobile access and any partner module on the target devices. If it handles two of your three jobs well, extend rather than rebuild.
- 2
Define a small task list
Write each task as a scan sequence with the Priority form it ends in. If a step cannot be stated in a line, it is too complex for the handheld.
- 3
Choose the client type
A progressive web app is cheapest and works with camera scanning; native or Android wrappers suit devices with hardware scanner keys and better offline storage.
- 4
Build an API layer
Put a small service between the app and Priority that holds credentials, maps device users to Priority users, and returns compact responses.
- 5
Handle offline and sync
Queue transactions with idempotency keys, cache part and bin lists, and replay on reconnect while surfacing conflicts clearly.
- 6
Validate server-side
Never trust the device. Check availability, status and permissions in the service and rely on Priority form logic for final validation.
- 7
Pilot on one area
Roll out to one warehouse zone or line, measure scan errors and time per task, then expand.
Example flows
Receive against a PO
Trigger: A truck arrives and the clerk scans the PO barcode.
- The app fetches open PO lines through the service.
- The clerk scans each part and keys or scans quantities.
- Over-receipts beyond tolerance are blocked.
- The service creates the receipt through the API and returns the receipt number.
- Labels for new lots are printed to the nearest printer.
Result: Receiving is posted on the dock, so planners see stock the same hour.
Offline cycle count in a warehouse dead zone
Trigger: A counter loses connectivity in an aisle.
- The app keeps counts in local storage with timestamps.
- Counts show as pending on the device.
- On reconnect, the app submits them with idempotency keys.
- The service compares them with on-hand and creates variance lines.
- A supervisor approves adjustments in Priority.
Result: Counting continues without connectivity, and adjustments still go through approval.
Keeping data on-prem
A mobile app for an on-prem Priority deployment works well if the service sits in your network and devices reach it over Wi-Fi inside the plant, with a VPN or a reverse proxy for outside use. Keep the Priority server unreachable from the internet and expose only the app's API with device authentication. For voice or photo features, use local models for transcription and image checks so shop-floor audio and part photos stay on-site. Test Wi-Fi coverage and device battery behavior before blaming the app for slow scans.
Security checklist
- Authenticate each device and user, with short-lived tokens, and revoke lost devices from a central list.
- Map each operator to a Priority user or a controlled badge identity so transactions are attributable.
- Limit the app's API to its specific tasks, not a generic pass-through to the OData endpoint.
- Encrypt local offline storage and wipe it on logout or remote revoke.
- Throttle and log requests, and alert on repeated failures or odd patterns.
Ways to get it done
Priority built-in or partner mobile module
Effort: Days to configure; limited scan workflow customization.
Best first stop for approvals, customer lookups and simple actions on standard forms.
Third-party warehouse or MES mobile product
Effort: Weeks to months, with license and integration cost.
Good when you need full warehouse management features and the product supports Priority.
Custom app with a partner like Netray
Effort: A first workflow in a few weeks, then add tasks incrementally.
Right for a few tailored scan workflows, offline needs and optional local AI features such as photo-based checks.
Pitfalls
- !Copying a full Priority form onto a small screen instead of designing a scan-first flow.
- !Skipping offline design and discovering dead zones on the first day.
- !Letting the device decide availability or status rather than checking server-side.
- !Not aligning labels and barcodes with what the app scans, so lots and bins cannot be read.
- !Using one shared login for all operators, which destroys traceability.
Frequently asked questions
Does Priority have a mobile app?
Priority offers mobile access options, and partners add modules, but the exact capabilities vary by version and package. Evaluate them against your real tasks. For scan-heavy warehouse and shop-floor work, many sites still add a focused custom or third-party app.
Can a mobile app post inventory transactions to Priority?
Yes through the OData API or load interfaces, which pass through Priority form validation. Use idempotency keys to avoid duplicates on retries, check availability server-side, and decide which adjustments need supervisor approval.
Should I build native or a web app?
A progressive web app is quickest and works for camera scanning and light offline use. Choose native or a wrapper if you need hardware scanner integration, robust offline storage or device management. Start with the web app if the task list is small.
How do I handle offline work?
Cache the lists the task needs, queue transactions locally with unique ids, and replay on reconnect. Decide in advance which actions are allowed offline and how conflicts, such as stock already moved, are shown to the user.
Can the app run without internet?
Yes if the service and Priority are on your local network and devices use plant Wi-Fi. Internet is only needed for optional cloud features. Plan for Wi-Fi coverage, and use a local model for any AI features to stay fully inside the site.
Want Mobile app working on your Priority ERP?
A free 30 minute assessment: we map the integration path for your version and setup, and where it should run.
Get a free assessmentTry it here, free
Priority ERP OData REST URL Builder
Build Priority ERP OData URLs with host, tenant, company, entity, $filter, $select, $expand and $top, ready to paste into a REST client.
Keep exploring
Free tools
- Priority ERP OData REST URL BuilderBuild Priority ERP OData URLs with host, tenant, company, entity, $filter, $select, $expand and $top, ready to paste into a REST client.
- Priority ERP Form Design TemplateA fill-in design document for a new or changed Priority form: identity, columns, triggers, privileges, sub-forms and test cases.
- AI Roadmap Priority ScorerScore a candidate AI initiative on business value, feasibility, data readiness, and risk to get a single weighted priority number for roadmap sequencing.
ERP fixes and how-tos
- SyteLine Service Mobile App: Options for Field Service and Warehouse StaffWhat mobile options exist for SyteLine / CSI field service and warehouse work: browser access, Infor mobile apps, scanner front ends and custom apps, and how to choose.
- How to set up Sage X3 mobile automation for the warehouse and shop floorHow to plan and set up Sage X3 mobile automation: prerequisites, devices, server and network checks, process scope and testing for warehouse and shop floor.
- NetSuite Manufacturing Mobile: shop floor work orders and requirementsWhat the NetSuite Manufacturing Mobile app does for shop floor work orders, what features and roles it needs, how to enable it and where it falls short.
Runs with your ERP
- Infor Service Mobile with Infor SyteLine Field ServiceInfor Service Mobile is a field technician app listed as a CloudSuite Industrial add-on. What it connects to in SyteLine service, setup steps, pitfalls, FAQ.
- ByDintec and SAP Business ByDesign: handheld warehouse transactions with continuous scanningByDintec is a handheld extension for SAP Business ByDesign with continuous-scan warehouse transactions, serial numbers and label creation. Setup and pitfalls.
- RF-SMART Mobile Inventory with Oracle Fusion Cloud SCMRF-SMART gives Oracle Fusion Cloud SCM a handheld barcode app for inventory, PAR and manufacturing transactions with single sign-on: flows, setup, pitfalls.
Guides
- Mobile Field Service with Real-Time ERP Data AccessEnable field technicians with mobile ERP access for work orders, parts lookup, asset history, and real-time data capture with offline-capable applications.
- Setting Up the SyteLine Mobile Warehouse Management AppConfigure the SyteLine mobile warehouse management app. Set up device profiles, warehouse workflows, and real-time inventory operations for CloudSuite Industrial.
- Mobile Shop Floor Reporting for SyteLine ProductionImplement mobile shop floor data collection in SyteLine. Configure labor reporting, operation completions, and production data capture on handheld devices.
Integrations
- How to add a mobile app to Infor SyteLineBuild or extend a mobile app for Infor SyteLine: barcode scanning, labor reporting, inventory moves and approvals over IDO REST, with offline and device options.
- How to add a mobile app to Infor LNBuild or add a mobile app for Infor LN: barcode scanning, goods receipts, inventory moves, labor reporting and approvals over ION APIs, with offline options.