AI & Automation4 min readNetray Engineering Team

Using AI to Decide Which RFQs a Job Shop Should Quote

Short answer

AI can help a job shop decide which RFQs to quote by reading each request, comparing it with your past quotes and jobs, and flagging fit problems, compliance risks and likely win odds before an estimator invests hours. It works from your own history, so it only helps if you have quote outcomes and job actuals to learn from, and a person should always make the final call. This guide explains what an RFQ screening assistant checks, what data it needs, how to keep it private, and when a simple checklist is enough.

The Problem: Estimator Hours Go to Low-Odds Bids

com, email and direct buyers, and the estimator opens them in order. Some are impossible from the start, such as parts that exceed your travel, require a certification you lack, or carry flow-downs you cannot accept. Others are price checks from a buyer who never awards to anyone but the lowest bidder.

Each takes one to several hours to quote. Without a screen, the shop spends scarce estimating time on bids with little chance, and responds late to the good ones. The goal is not to quote less for its own sake, but to put hours where the probability and margin are best.

What a Screening Assistant Checks

The assistant reads the RFQ email, attachments and drawings, extracts key facts and compares them with your capabilities and history. Output is a short triage card for the estimator: recommend quote, quote with questions, or decline, with reasons and citations to the source page or past job.

  • Part fit: size, material, tolerances, finish and special processes against your equipment
  • Compliance: ITAR or CUI markings, required certifications, quality clauses and flow-downs you have accepted before
  • Customer history: prior quotes, wins, margins, payment behavior and re-quote frequency
  • Similar jobs: closest past parts with actual hours, scrap and outside processing cost
  • Capacity: current backlog on the machines and inspection the part would need

The Data It Needs, and Why It Must Be Yours

Useful screening depends on quote history with outcomes, job actuals, customer records and a library of past drawings and specs. If your quotes live in individual spreadsheets, or outcomes were never recorded, start by cleaning and logging them, since any model is only as good as that history. Customer RFQs frequently carry export-controlled or proprietary drawings, so run the assistant privately, on your own hardware or private cloud, with access controls matching who may see which customer's files.

Sending prints to a public AI service can violate NDAs and, for ITAR data, export rules. Open-weight models served locally with retrieval over your ERP and documents are a workable pattern.

Try it here, free

Manufacturing Quote Review Checklist

Open full tool

A pre-send checklist covering scope, material, routing, outside processing, margin, risk and terms, with critical items flagged.

Keep the Estimator in Charge

The assistant gives a recommendation, not a decision. Show evidence for every flag so the estimator can verify it quickly, and let them override and record why. Over time, compare predictions to outcomes: how often did a recommend quote result in a win, and how often did a decline turn out to be a mistake?

Avoid false precision such as a win probability to two decimals, since small history cannot support it. Use broad tiers instead. Writing anything back to the ERP, such as creating a quote record, should require human approval and respect user roles.

When a Checklist Beats AI

If you receive fewer than ten RFQs a month, or most work is repeat orders with known prices, a one-page triage checklist applied by the estimator is cheaper and nearly as effective. AI starts to pay when volume is high enough that triage itself consumes hours, when drawings are complex and compliance clauses are easy to miss, or when you want consistency across several estimators. Pilot on a month of past RFQs first and compare the assistant's recommendations with what actually happened before trusting it on live bids.

Frequently asked questions

Can AI tell me which RFQs I am likely to win?

It can estimate rough likelihood from your own history, such as customer, part type and past price gaps, but small datasets limit accuracy. Treat output as a tiered guide, not a precise probability, and compare predictions to real outcomes over time before relying on it.

Is it safe to put customer drawings into an AI tool?

Only if the tool runs where you control access. Customer prints may be covered by NDAs, ITAR or CUI rules. A private deployment on your own servers or private cloud avoids sending drawings to a public service, and role-based access keeps each estimator limited to the customers they may see.

What data does an RFQ screening assistant need?

Past quotes with outcomes, completed job actuals, customer records, accepted flow-down clauses and your drawings or specs library. If outcomes were not recorded, begin logging now. Clean, consistent history matters more than model size for this task.

Netray can pilot a private RFQ screening assistant against a month of your past RFQs so you can see what it would have flagged. Send a sample set and your ERP name.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Integrations

Comparisons

Software