RF barcode data collection and warehouse mobilityInfor M3Runs on-prem

Infor Factory Track and Infor M3: handheld scanning transactions

Infor Factory Track is a native Infor add-on that gives M3 handheld transactions for receive, putaway, move, physical count, pick and pack, shipment loading and package labels, plus mapping of barcode scan formats. It is the first thing to check before buying a third-party RF tool for M3.

How Infor Factory Track connects to Infor M3

Native Infor add-on

Factory Track is documented by Infor as a native add-on to M3, so scans become M3 transactions through the product rather than through a custom connector. Its documentation covers the M3 transaction set and barcode scan-format mapping.

What data moves

FromToDataWhen
Handheld scannerInfor M3Receipt against purchase orderOperator scans item and location at the dock
Handheld scannerInfor M3Putaway and move transactionsScan of item, from and to locations
Handheld scannerInfor M3Physical count entriesCount task or cycle count
Infor M3Handheld scannerPick lists and pack tasksDelivery released for picking
Handheld scannerInfor M3Shipment loading confirmationPackages scanned onto the vehicle

Setting it up

  1. 1Choose the transaction setDecide which of receive, putaway, move, count, pick, pack and shipment loading you need first. Starting with receiving and counts is common.
  2. 2Define barcode scan formatsMap each barcode on supplier labels and your own labels to the M3 fields it carries, using Factory Track's scan-format mapping.
  3. 3Prepare M3 master dataClean up item, warehouse, location and lot or serial setup. Scanning exposes any gaps immediately.
  4. 4Configure devicesSelect handhelds, connect them to the Factory Track environment, and set operator permissions and warehouses.
  5. 5Design package labelsSpecify what package labels contain and where they are printed from.
  6. 6Pilot in one warehouseRun real receipts and picks, compare inventory balances with M3 and record scan error causes.
  7. 7Train and roll outTrain by role and add the remaining transactions after the first process is stable.

What usually breaks

  • !Supplier barcodes that do not match your scan-format mapping, causing rejected scans at the dock.
  • !Locations not defined in M3 consistently, so moves fail or inventory lands in wrong bins.
  • !Lot and serial capture treated as optional on the device while M3 requires them.
  • !Counts posted without a review step, adjusting inventory from a bad count.
  • !Network dead spots in the warehouse leaving operators with stalled sessions.
  • !Label formats copied from another system that omit data downstream partners need.

A private AI layer across both systems

Scan failure triage

A private assistant reading Factory Track errors and M3 master data can say which rejected scans come from missing locations, unmapped barcodes or closed orders, and propose the fix for approval.

Inventory variance explanations

Ask why a location shows a count difference and get the recent transactions behind it, in read-only form.

Barcode mapping drafts

When a supplier changes label layout, the assistant drafts the updated scan-format mapping for a consultant to review.

Warehouse performance questions

Supervisors ask which receipts are waiting for putaway or which deliveries are not yet picked, scoped to their warehouse.

Try it here, free

Infor Factory Track AI Assistant Sizing and Value Calculator

Open full tool

Size the GPUs and estimate the monthly value and payback of an on-prem AI assistant for Infor Factory Track users.

When something else fits better

  • M3 standard warehouse functionality with a third-party RF client if you already own that tooling.
  • Spreadsheet-based counting and manual M3 entry for very small stockrooms, at the cost of accuracy.
  • A dedicated WMS where you need advanced slotting, waves or labour management beyond handheld transactions.

Frequently asked questions

Is Factory Track an Infor product?

Yes. Infor documents Factory Track for M3 as a native add-on with handheld transactions. That makes it the first option to evaluate for barcode scanning on M3, before comparing with third-party RF vendors.

Which transactions does it cover?

Infor's documentation lists receive, putaway, move, physical count, pick and pack, shipment loading and package labels, and scan-format mapping. Confirm the exact transaction names and version in the documentation for your release.

Does it work with on-premises M3?

It is positioned as an M3 add-on, so check the installation and architecture guide for your M3 release and deployment type. Network and device requirements are where on-premises projects most often need planning.

What is scan-format mapping?

It tells the system how to read a barcode, such as which part is the item, lot or quantity, so a scan fills the right M3 field. Getting it wrong is the most common cause of rejected scans.

Pairing documented at docs.infor.com/factorytrack/6.01.10/en-us/ftm3olh/lsm1455964686816.html . Infor Factory Track is a product of Infor; Netray is independent and not affiliated with either vendor.

Get Infor M3 alerts

Support and maintenance deadlines, release changes that affect Infor M3 sites, and new free Infor M3 tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Infor M3: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Infor M3? Start with the Infor M3 guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

Integrations