Infor Factory Track private AI layer blueprint generator
This generator turns a few facts about your Infor Factory Track installation into a structured architecture plan for a private AI layer. It is meant to give IT, the ERP owner and security a shared document to react to, not to replace design work.
Fill in
Infor Factory Track Private AI Layer Blueprint Generator
Private AI layer architecture plan: Infor Factory Track
Company: Acme Precision Ltd System: Infor Factory Track Current release Database: Microsoft SQL Server 2016 or later Hosting: On-prem server Named users: 80 across 2 site(s) Target go-live: 2027-03-31
1. Context and goals
Acme Precision Ltd runs Infor Factory Track (Current release) on Microsoft SQL Server 2016 or later and wants AI-assisted answers without moving data off its own infrastructure.
Primary use cases: Questions on job progress and labour posted from the floor, scrap and rework reasons, inventory moves captured by barcode, and variances between shop floor transactions and what posted to the ERP.
The assistant is read-only in phase 1. Any write-back is prepared as a draft and posted only through Infor Factory Track's supported interfaces after a named user approves it.
2. Components
| Component | Design | Notes |
|---|---|---|
| Data access path | Read-only views over SQL Server on a readable secondary, joined to ERP read views | Schema discovery |
| Change capture | Availability group secondary, log shipping or scheduled copy | Replica lag |
| Retrieval index | Vector index over documents and attachments with access-control metadata, on local storage | Chunking and refresh schedule to agree |
| Tool server | MCP or REST tool server exposing approved, parameterised read actions | Action list agreed with business owners |
| Model serving | Open-weight model on vLLM or Ollama; GPU: None yet | Model choice validated on Acme Precision Ltd questions |
| Identity and permissions | Role filter in tool server plus SQL Server row-level security | Directory mapping |
| Audit | Log of user, question, query or action, documents retrieved and answer | Retention set with compliance |
3. Security controls mapped to your inputs
Hosting model: On-prem server. If air-gapped, no outbound route exists for the model, index or tool server, and updates arrive on approved media after scanning.
Data that must never leave the site: Labour records tied to named employees, customer job data and routings for controlled products.
Controls: read-only service account limited to named views, per-user visibility filters in the tool server, encryption at rest on the replica and index, network segmentation between the assistant and production, and an audit trail reviewed on a set schedule.
4. Rollout
| Phase | Scope | Exit criteria |
|---|---|---|
| 1. Read-only questions | Named views and a small document set for a pilot group; every answer shows its query or sources | Pilot users rate answers acceptable on agreed test questions |
| 2. Drafts | Assistant prepares summaries, messages or transaction drafts that are reviewed but not posted | Drafts accepted with few edits; no data exposure findings |
| 3. Approved actions | Posting through supported interfaces under the approving user's identity | Audit record complete; business owner sign-off |
5. Open questions for IT
1. Which libraries, schemas or organisations are in scope for 80 users at 2 site(s)? 2. Can a replica or reporting copy be provided, and with what refresh lag? 3. Which document stores need indexing, and what access rules apply to them? 4. Who owns the data dictionary and approves the action list? 5. What are the power, rack and cooling constraints for GPUs (None yet)? 6. How will model updates be brought in and approved?
Approvals
A planning aid, not a design guarantee. Verify table names, interfaces and supported versions against your Infor Factory Track documentation and with your vendor or implementation partner before building.
Review of your Infor Factory Track AI architecture
Optionally send your exported plan for a short expert review of the data path, permissions and sizing.
Optional. The tool and every export work without this. No spam.
How to use the generator
Fill in the company, version, database, hosting model, user count and sites. Write the use cases in plain language, for example the five questions users ask most often. List the data that must stay on site, such as pricing, controlled drawings or personal data. Then export the result to PDF or Word and circulate it. The open questions section is designed to start the right conversation with infrastructure and security teams.
- Be specific about use cases; vague goals produce vague scope.
- Name data classes, not just systems.
- Choose the hosting model honestly, including air-gapped if required.
- Share the export before buying GPUs.
What the blueprint contains
The plan has a context section, a component table, security controls mapped to your answers, a three-phase rollout and a list of open questions. The components follow a common pattern: a read-only data path over a replica, a retrieval index, a tool server, a locally served open-weight model, identity mapping and an audit log. The details for Infor Factory Track reflect how it stores data and handles access.
- Read-only first, drafts second, approved actions last.
- Per-user visibility enforced outside the model.
- Every answer traceable to a query or document.
- Air-gapped operation supported by design.
Reading the output
Treat each table row as a decision to confirm, not a fact. For example, the data access row names a mechanism; your team still has to verify the exact objects in your release. The rollout table gives exit criteria so that each phase has a clear stop or go decision. Pair this blueprint with the sizing calculator to estimate GPU count and the monthly value so that the business case and the architecture agree.
- Use the sizing calculator for GPUs and payback.
- Run security review on section 3 before pilot.
- Assign an owner to every open question.
Common mistakes
The most common mistake is starting with the model instead of the data path and permissions. A good model on top of an unfiltered database is a security incident waiting to happen. The second is skipping the data dictionary: coded table and field names need plain-language descriptions or answers will be unreliable. The third is allowing write access too early. Keep the first phase read-only and measure answer quality before adding drafts.
- Do not give the model a database connection.
- Do not skip replica isolation from production.
- Do not index documents without their access rights.
- Do not call it done without an audit log.
Frequently Asked Questions
Does this generator send my data anywhere?
No. The document is generated in your browser from the fields you enter. You choose whether to share the export with anyone, including us.
Is the blueprint specific to Infor Factory Track?
The structure is common to any private AI layer, while the data access, change capture and permission rows reflect how Infor Factory Track stores data and handles access. You should still verify object names and interfaces for your version.
Can I use it for an air-gapped site?
Yes. Select the air-gapped hosting option. The security section then states that no outbound route exists and that updates arrive on approved media.
Who should review the output?
At minimum the IT lead, the Infor Factory Track owner and information security. The open questions list is written so each can take away items to answer.
If you would like help turning this plan into a working Infor Factory Track assistant on your own hardware, Netray builds private, on-prem AI layers with partners who know the system.
Related Tools
Infor Factory Track AI Assistant Sizing and Value Calculator
Size the GPUs and estimate the monthly value and payback of an on-prem AI assistant for Infor Factory Track users.
On-Prem AIOn-Prem AI Deployment Checklist
A 30-point pre-deployment checklist covering use cases, hardware, security, model operations, and rollout for self-hosted enterprise LLMs.
On-Prem AIOn-Prem AI Security Hardening Checklist
A practical control checklist for securing self-hosted language models, covering model provenance, network isolation, data governance, host hardening, and audit readiness.
On-Prem AIGPU Sizing Calculator for LLM Inference
Work out how many GPUs you need to serve a given open-weight model to your user base, based on memory footprint and token throughput.
More MES & Shop Floor tools
See all- Oracle Fusion OEE Work Center Calculator
- Infor VISUAL Shop Labor Ticket Log Worksheet
- VISUAL Shop Load Versus Capacity Calculator
- VISUAL Shop Resource Capacity and Load Calculator
- IFS Shop Order Status and Lifecycle Reference
- Plex Smart Manufacturing Data Source Request Template
- Plex Production Scheduling Checklist
- Plex Downtime Reason Log and OEE Worksheet
- Plex Go-Live Readiness Sign-Off Template
Go Deeper
On-Prem LLM Deployment Architecture: Reference Guide
Reference architecture for on-prem LLM deployment: inference servers, GPU sizing, RAG pipelines, and security zones for regulated manufacturers.
Security Hardening for On-Prem AI Stacks
Security hardening for on-prem AI stacks: container isolation, model supply chain, prompt injection defenses, and audit logging for defense contractors.
Keep exploring
Free tools
- Infor Factory Track AI Assistant Sizing and Value CalculatorSize the GPUs and estimate the monthly value and payback of an on-prem AI assistant for Infor Factory Track users.
- Infor XA Private AI Layer Blueprint GeneratorFill in your Infor XA version, database, hosting and use cases and get a shareable architecture plan for a private AI layer.
- SAP S/4HANA On-Prem Private AI Layer Blueprint GeneratorFill in your version, database, hosting and use cases to get an architecture plan for adding a private, on-prem AI assistant to SAP S/4HANA, with components, security controls and a three-phase rollout.
ERP fixes and how-tos
- How to add a private AI layer to Infor Factory Track on-premReference architecture to add AI to Infor Factory Track on-prem: read-only data path, retrieval, permissions, local GPUs, write-back control and rollout.
- Infor Factory Track for M3: Shop Floor Data Collection ExplainedWhat Infor Factory Track does for M3 manufacturers: shop floor data collection feeding M3 orders, how the integration is structured and how to plan the setup.
- Infor XA Factory Track: What It Does and How to Plan Shop Floor Data CollectionWhat Factory Track does for Infor XA shop floor data collection, which transactions it captures, how to plan a setup, and alternatives when it is aging.
Runs with your ERP
- Infor Factory Track with Infor LN: barcode inventory, labor and lot or serial traceabilityFactory Track covers barcode inventory, job material, labor and lot or serial traceability for Infor LN and SyteLine. Setup, pitfalls and a private AI layer.
- Infor Factory Track Time Track with SyteLine: attendance and labor captureHow Infor Factory Track Time Track captures clock-ins, breaks, absences and labor for SyteLine, applies attendance rules and prepares payroll data.
- Infor Factory Track Shop Floor with SyteLine: paperless labor, job and WIP reportingHow Factory Track Shop Floor kiosks record labor, job operations and WIP in SyteLine, with setup steps, common pitfalls and where a private AI layer helps.
Guides
- Shop Floor Data Collection: Connecting Machines and Operators to Your ERPShop floor data collection guide: connect CNC machines, barcode scanning, and IIoT sensors to ERP. Covers OPC UA, MTConnect, Factory Track, costs, and AI agents.
- Factory Acceptance Test Checklist for Custom Machinery BuildersHow to plan and document a factory acceptance test for custom machinery: test protocol, samples, acceptance criteria, punch list and sign-off tied to payment.
- Factory KPI Dashboard Design: 7 Rules for Dashboards People Actually UseFactory KPI dashboard design in 7 rules: pick metrics by audience, define each KPI, limit tiles, drill to the source row, show data freshness, and track usage.