Shipping / multi-carrier and TMSOracle NetSuite

Pacejet and Oracle NetSuite: shipping and transportation planning

Pacejet runs multi-carrier parcel and LTL rate shopping and shipping inside NetSuite, and 3Gtms adds transportation planning that consolidates orders and chooses mode and carrier. It is a Built for NetSuite SuiteApp, so users work from NetSuite records.

How Pacejet (3Gtms Pacejet Transportation Planning) connects to Oracle NetSuite

Built for NetSuite SuiteApp

Pacejet is installed as a SuiteApp and is described as achieving Built for NetSuite status for the transportation planning offering. Shipping actions occur from NetSuite fulfillment and order screens.

What data moves

FromToDataWhen
NetSuite sales order or fulfillmentPacejetItems, weights, ship-to, requested serviceRate request or fulfillment packing
PacejetNetSuiteRates, labels, tracking and freight chargesShipment processed
NetSuite ordersTransportation planningOpen orders to consolidate by lane and datePlanning run
PlanningNetSuiteSelected mode, carrier and loadPlan accepted

Setting it up

  1. 1Install the SuiteAppInstall in a sandbox and assign the roles shipping and planning users need.
  2. 2Connect carriersAdd parcel and LTL accounts and contracted rate tables.
  3. 3Prepare item dataMaintain weight, dimensions, freight class and packaging on items.
  4. 4Map ship methods and rulesMap NetSuite methods to Pacejet services and define carrier selection rules.
  5. 5Configure locationsSet ship-from locations and pickup details for each warehouse.
  6. 6Decide on planning scopePilot rate shopping first, then add consolidation and mode selection.
  7. 7Test and cut overRun live shipments in parallel for a short period and reconcile freight cost.

What usually breaks

  • !Item dimension and freight class gaps produce wrong LTL rates.
  • !Rate tables that are out of date cause margin surprises.
  • !Ship method mapping differences between sales orders and fulfillments give inconsistent carriers.
  • !Consolidation that ignores customer delivery windows creates late orders.
  • !Multi-location ship-from setup errors produce incorrect origin rates.

A private AI layer across both systems

Carrier decision review

A private assistant explains why a carrier was chosen on a shipment and flags cases where a cheaper compliant option existed, for logistics to review.

Freight spend questions

It answers spend by lane, carrier and customer from NetSuite and Pacejet data, with the query visible.

Item data audit

It finds items with missing dimensions or classes before they cause rating errors.

Try it here, free

NetSuite Work Order Labor Variance Calculator

Open full tool

Break labor variance on completed work orders into a rate variance and an efficiency variance and read labor efficiency.

When something else fits better

  • ShipHawk is another NetSuite shipping SuiteApp with similar rate shopping.
  • A single-carrier native integration is enough when you use one carrier.
  • If you have a dedicated TMS already, integrate it instead of adding planning here.

Frequently asked questions

Is Pacejet inside NetSuite?

Yes. It is delivered as a SuiteApp, so rating and shipping occur on NetSuite transactions rather than in a separate application.

What does the transportation planning add?

Beyond rating a single shipment, 3Gtms describes planning that consolidates orders and chooses mode and carrier. It adds value mainly when you ship many orders over shared lanes.

What data matters most?

Accurate item weights, dimensions and freight classes, plus current carrier rate tables. Rating errors usually trace back to those rather than to the software.

Pairing documented at www.dcvelocity.com/articles/51222-3g-s-pacejet-transportation-planning-achieves- . Pacejet (3Gtms Pacejet Transportation Planning) is a product of 3Gtms; Netray is independent and not affiliated with either vendor.

Get NetSuite alerts

Support and maintenance deadlines, release changes that affect NetSuite sites, and new free NetSuite tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for NetSuite: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to NetSuite? Start with the NetSuite guide and toolkit, or plan with NetSuite Cost Calculator, Training Path Builder, ERP Certification Study Planner.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

AI on your ERP

Integrations

Comparisons

Software