5S Audit Checklist for Manufacturing and Shop Floor Areas
5S is the foundation of a stable, visual workplace, and an audit is how you keep it from sliding back. This checklist has six items for each of the five S's, with the safety-critical points flagged. Score an area in ten minutes and export the result for the area board.
0 of 30 items complete
5 critical items still open - these are the highest-risk gaps.
1. Sort (Seiri)
2. Set in Order (Seiton)
3. Shine (Seiso)
4. Standardize (Seiketsu)
5. Sustain (Shitsuke)
Tick each item that is fully met in the audited area. Score is items met divided by total items. Many sites treat 80 percent as the minimum and 90 percent as the target, but set your own thresholds.
Track 5S findings next to your work orders
Optional: talk to us about linking audit actions to maintenance and quality records in your ERP.
Optional. The tool and every export work without this. No spam.
How to run the audit
Audit one area at a time with the area owner present. Walk the area in the same direction each time, tick items that are fully met, and leave items unticked if they are only partly met. Partial credit hides problems. Take photos of failed items and attach them to the corrective action. Rotate auditors between areas so that fresh eyes see what the team has gone blind to. A full cell audit should take between ten and twenty minutes.
- Use the same checklist for every area so scores can be compared
- Audit on a fixed day and time to avoid pre-cleaning for the audit
- Post results on the area board with the previous score
- Assign every failed item an owner and a due date
What each S is checking
Sort asks whether anything is in the area that does not belong. Set in Order asks whether everything that does belong has an obvious place, so a missing item is visible within seconds. Shine is about cleaning as inspection: leaks, wear and loose parts show up when a machine is wiped down. Standardize converts the first three into visual rules and routines. Sustain is the leadership layer, meaning audits happen, actions close and the team can explain the standard in its own words.
Scoring and thresholds
The tool counts items met against the 30 total and gives a percent. A common practice is to treat anything below 60 percent as a restart of the 5S program in that area, 60 to 80 as in progress, and above 80 as a maintained standard. Critical items, such as blocked fire equipment or uncontrolled leaks, should trigger action even if the percent is high. Track scores per area per month; a flat line at 100 percent often means the audit is too easy.
Common mistakes
The most frequent failure is treating 5S as a one-off clean-up event. Others include adding labels without removing clutter first, letting supervisors do the cleaning for the team, and auditing only the shop floor while offices, tool cribs and warehouses decay. Adapt the items for each environment but keep the five-part structure so the program stays recognizable.
Frequently Asked Questions
How often should we run a 5S audit?
Weekly self-audits by the area team and a monthly cross-audit by a different team or leader work well for most plants. New or weak areas benefit from more frequent checks until the score is stable.
What is a good 5S audit score?
There is no universal standard. Many plants set 80 percent as the pass line and 90 percent as the goal, but the trend and speed of closing actions matter more than the number.
Can I use this outside of manufacturing?
Yes. The structure applies to warehouses, tool cribs, labs, maintenance shops and offices. Edit the item wording in the Excel export to fit the environment.
What does the sixth S, safety, add?
Some sites add Safety as a sixth S. This checklist flags safety-critical items inside the five S's. If you want a separate section, add it as a group after export.
If you want audit results and corrective actions tracked alongside your ERP work orders and quality records, we can help connect them.
Related Tools
Gemba Walk Checklist
A 28-point gemba walk checklist covering safety, quality, flow, standard work and people, with an exportable result.
Discrete ManufacturingKaizen Event Charter Template
Fill in the fields and generate a one-page charter for a kaizen blitz, with scope, targets, team, timeline and approvals.
MES & Shop FloorStandard Work Combination Sheet Worksheet
Record each work element with manual, machine and walk times and get the operator's total cycle time to compare with takt.
Discrete ManufacturingValue Stream Map Data Worksheet
Fill in the data box for each process step of your current-state map and get total lead time, value-added time and process cycle efficiency.
More Discrete Manufacturing tools
See all- Manufacturing KPI Dashboard Template
- Manufacturing KPI Formula Reference
- Changeover Reduction (SMED) Savings Calculator
- SMED Changeover Element Analysis Worksheet
- Spaghetti Diagram Distance Calculator
- SMED Changeover Reduction Savings Calculator
- EPEI Every Part Every Interval Calculator
- Process Cycle Efficiency Calculator
- Batch Size vs Lead Time and Setup Share Calculator
Keep exploring
Free tools
- Supplier Audit ChecklistA 30-point supplier audit checklist covering quality system, process control, receiving, delivery and records. Tick items, see a score, export the result.
- Machine Shop Safety ChecklistAn OSHA-aligned safety, housekeeping and 5S checklist for machine shops with suggested audit frequency and practical examples.