Infor LN & BaanFree referencePDF, Excel, Word exportBaan IV / Infor LNAll Infor LN and Baan tools

Baan IV and Infor LN BSE Command-Line Tools Reference

This reference lists the programs, configuration files, directories and clients under $BSE that Baan IV and Infor LN administrators use, with what each one does and a typical usage example. Version notes show where Baan IVc uses the 6.1 file set and where LN 10.x differs.

Download:
NameTypePurposeTypical usage exampleBaan IV / LN 10.x availabilityNotes
bshell
executable
The virtual machine (logic server) that runs sessions and scripts
Options passed from the BW configurator, e.g. -set CORE=1 -keeplog
UNIX bshell6.2, Windows ntbshell.exe; Baan IVc environments use the 6.1 file set
-logfile <file> logs stdout and stderr to a file; -keeplog keeps $BSE_TMP/bshell.<pid>.
bshcmd
executable
Change log and debug settings of a running bshell, or kill bshells
bshcmd -p (process list); bshcmd -k <pid> (kill one bshell)
Enterprise Server porting sets
-d sets the debug level (octal); -m shows memory usage.
ba
executable
ASCII display server
Used for job management on UNIX
UNIX only, not used on Windows
Character-based client path.
bdbpre
executable
Export tables to a sequential dump
bdbpre -Ntcmcs023 -C100 -O tcmcs023_100.dmp
UNIX bdbpre6.2, Windows bdbpre.exe
-C takes a list or range (000-005); -I reads table names from a file; related session ttaad4226m000.
bdbpost
executable
Create or append tables from a bdbpre dump
bdbpost -c 200 -A -I tcmcs023_100.dmp
UNIX bdbpost6.2, Windows bdbpost.exe
-c target company, -A append without overwrite, -R replace, -k drop existing tables; related session ttaad4227m000.
bdbreconfig
executable
Reconfigure tables to a new data dictionary; analyse differences
bdbreconfig6.2 -m -c -A <source pacc> -A <target pacc> -C 0
Enterprise Server porting sets
Normally called by 4GL sessions; run it directly only for the -A change analysis.
refint
executable
Check or repair referential integrity
Run for a list of tables with -I file
Enterprise Server porting sets
Use after imports done with bdbpost -n.
bic
executable
3GL program compiler (Baan C compiler)
Called when you compile scripts from the development sessions
Baan IV and LN
std_gen is the 4GL preprocessor; repgen the report generator.
bic_info
executable
Show information about a compiled object
bic_info <object> to check what an object contains
Enterprise Server porting sets
Useful to confirm which object version is deployed.
shmmanager / shmserv
executable
Shared memory manager
shmmanager6.2 -i (initialize), -s (show contents)
shmmanager on UNIX, shmserv on Windows
-k deletes and -r resets shared memory only when no process is attached.
shmtimer
executable
Daemon that keeps the current time in shared memory
Started when shared memory is initialized
UNIX porting sets
Part of shared memory start-up.
srdd_init6.2
executable
Loads the data dictionary for the bshell from shared memory
Part of the shared memory set-up
LN and Baan 5 file set (6.2)
Which components load is set in srdd_tab6.2 (srdd_tab6.1 for Baan IVc).
pdaemon6.2
executable
Printer daemon for print requests
pdaemon6.2 -r in rc.start
UNIX only
Must be started by root; defaults in $BSE/lib/defaults/pdaemon6.2.
ipc_boot
executable
Start remote processes such as database drivers
Looks up the server name in $BSE/lib/ipc_info
Enterprise Server porting sets
fs handles remote file I/O and is also configured in ipc_info.
rc.start / rc.stop
executable
Start or stop the environment: shared memory, printer daemon, database
$BSE/etc/rc.start at system boot
UNIX only
rc.startjobdm and rc.stopjobdm start and stop the job daemon.
$BSE/lib/tabledef6.2
config file
Which database driver and server serve each table
Read by bdbpre and the bshell to pick the driver
tabledef6.2 for Baan 5 and LN; tabledef6.1 for Baan IVc
Error 505 ENOSERVER points here.
$BSE/lib/compnr6.2
config file
Mapping of logical to physical companies
Used for logical table sharing
compnr6.2 for Baan 5 and LN; compnr6.1 for Baan IVc
Generated by tools; do not edit by hand.
$BSE/lib/ipc_info
config file
Server name, protocol (socket, pipe, direct) and executable for each service
bshell s $BSE_BIN/bshell6.2 style lines
Enterprise Server porting sets
Direct connections load the driver into the client (combo driver).
$BSE/lib/defaults/db_resource
config file
Database driver resources
Driver tuning resources set by the DBA
Enterprise Server porting sets
Takes precedence over the same resource in $BSE/lib/defaults/all.
$BSE/lib/user
directory
u<User> files with each user's start menu, package combination and default company
Generated from user data in the tools sessions
Baan IV and LN
Optional r<User> remote user files live here too.
$BSE/log
directory
Program log files
bshell.log, or bshell-001.log with rotation (porting set 9.0b and later)
Older porting sets use log.<program name>
log_size and log_rotation_count resources control rotation.
BSE_TMP
variable
Directory for temporary files
BSE_TMP=$BSE/tmp
Baan IV and LN
The running bshell writes bshell.<pid> here.
BW (Infor BW)
client
Windows client for Baan and LN sessions
BW configurator command field passes bshell options
Baan IV and LN releases that still support it
BwPrint is part of the BW installation.
LN UI
client
HTML5 browser user interface
Standard client for LN 10.4 and later
LN 10.3 supports LN UI, Web UI and WorkTop; LN 10.4 and later support only LN UI
Web UI and WorkTop are not supported from LN 10.4.

Names, options and version statements follow the Infor Enterprise Server Technical Manual. On UNIX most binaries carry the 6.2 suffix (bdbpre6.2), on Windows the .exe extension (bdbpre.exe), and a few have different Windows names (ntbshell.exe). The manual advises not to edit files in $BSE/lib by hand, because many are maintained by Infor tools.

Running an old Baan IV environment?

Tell us your porting set and database and we will list the admin checks we would run before any upgrade.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How the pieces fit

The bshell is the virtual machine that runs every session. It reads the runtime data dictionary from shared memory, which shmmanager (UNIX) or shmserv (Windows) manages, and it reaches the database through a driver chosen from $BSE/lib/tabledef6.2. ipc_boot starts the driver or other servers using $BSE/lib/ipc_info, which lists each server name, the protocol and the executable. On UNIX, rc.start in $BSE/etc brings shared memory and the printer daemon up at boot and rc.stop shuts them down. Logs land in $BSE/log, temporary files in BSE_TMP, and per-user files in $BSE/lib/user. Database tools such as bdbpre and bdbpost use the same tabledef6.2 lookup as the bshell, so they reach the same database.

Worked example: copy a general table to another company

To copy item groups from company 100 to company 200, export with bdbpre -Ntcmcs023 -C100 -O tcmcs023_100.dmp. Check the record count bdbpre prints. Import with bdbpost -c 200 -A -I tcmcs023_100.dmp, where -c sets the target company and -A appends without overwriting existing codes; use -R instead to replace matching keys. If you import a range of related tables with -n to skip reference checks, repair the reference counters afterwards. Read Log.bdbpost in $BSE/log if the import fails. Try the import in a test company first.

  • Export: bdbpre -N table -C company -O file
  • Import: bdbpost -c company -A or -R -I file
  • Same sessions: ttaad4226m000 and ttaad4227m000

Baan IV versus LN 10.x

Baan IVc environments use the 6.1 files (tabledef6.1, compnr6.1, srdd_tab6.1, include6.1), while Baan 5 and LN use the 6.2 set. Clients changed most: Baan IV and older LN used BW and the ASCII client, LN 10.3 supports LN UI, Web UI and WorkTop, and LN 10.4 and later support only LN UI. bdbreconfig is normally driven by the 4GL conversion sessions; run it by hand only for the -A change analysis that reports which tables need an ALTER or an export and import.

Common mistakes

Editing files in $BSE/lib by hand is the classic one: the manual warns that many files are delivered by Infor or regenerated by tools, so manual changes are lost or break start-up. Running shmmanager -k or -r while processes are still attached fails or disrupts users, so stop sessions first. Importing with bdbpost -k drops existing tables, which is rarely what you want on a live company. And forgetting that UNIX binaries carry the 6.2 suffix while Windows uses .exe causes scripts copied between platforms to fail on the first line.

Frequently Asked Questions

What are the main Baan tools under $BSE?

The bshell virtual machine, the database tools bdbpre, bdbpost, bdbreconfig and refint, the bic compiler with std_gen and bic_info, the shared memory manager, the printer daemon on UNIX, ipc_boot and fs for remote processes, and the start and stop scripts rc.start and rc.stop. Configuration lives in $BSE/lib.

What is BW in Baan IV?

BW is the Windows client for Baan and LN sessions, configured through the BW configurator, whose command field can pass options to the bshell. It includes BwPrint for local printing. From LN 10.4 the supported user interface is LN UI, the HTML5 browser client.

What does tabledef6.2 do?

tabledef6.2 in $BSE/lib tells the bshell and database tools which database driver serves each table and, for remote tables, on which system. Baan IVc uses tabledef6.1. If no server is defined or the driver cannot start, sessions fail with error 505 ENOSERVER.

How do I export a table in Baan IV or LN?

Use bdbpre with -N for the table, -C for the company and -O for the output file, or session ttaad4226m000. Import the dump with bdbpost, setting the target company with -c and choosing -A to append or -R to replace. On UNIX the programs are bdbpre6.2 and bdbpost6.2.

If you run Baan IV or LN on your own servers and want admins to ask questions about logs, jobs and data in plain English, we can set up a private AI assistant next to it.

Get Infor LN and Baan alerts

Support and maintenance deadlines, release changes that affect Infor LN and Baan sites, and new free Infor LN and Baan tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Infor LN and Baan: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Infor LN and Baan? Start with the Infor LN and Baan guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Integrations

Comparisons

Software