Infor LN bdbpre and bdbpost Table Copy Command Generator
bdbpre exports LN tables of one company to a sequential dump and bdbpost loads that dump into another company. This generator writes the table list file, the UNIX or Windows commands and the follow-up steps for copying general data such as tcmcs001 or tccom100 from a source to a target company on Baan IV or Infor LN.
Fill in
-n loads without reference checks. Clear it to load with checks.
1. Table list file (tables.lst)
tcmcs001 tccom100
2a. UNIX
export BSE=/u01/baan/bse export BSE_TMP=$BSE/tmp export USER=baanadm cd $BSE/tmp # export the listed tables of company 001 to a dump file $BSE/bin/bdbpre6.2 -Itables.lst -Ocopy001to901.dmp -C001 # load the dump into company 901 $BSE/bin/bdbpost6.2 -R -f -n -c901 -Icopy001to901.dmp # check the command output, then the newest files in $BSE/log ls -lt $BSE/log | head
2b. Windows (command prompt on the application server)
cd /u01/baan/bse\bin fillenv set USER=baanadm bdbpre6.2 -Itables.lst -Ocopy001to901.dmp -C001 bdbpost6.2 -R -f -n -c901 -Icopy001to901.dmp rem then check the command output and the newest files in /u01/baan/bse\log
3. Follow-up in LN
1. Check the bdbpost output and the log files in $BSE/log for errors and rejected rows. 2. If you loaded with -n (reference checks skipped), run Reorganize Tables (ttaad4225m000) for company 901 with Reference Integrity and Repair Reference Counter selected. 3. Spot check the copied tables in company 901 through their sessions.
Based on the Infor LN 10.8 procedure for copying general data with bdbpre and bdbpost. The -R and -f options are used as in the Infor example; run the program without arguments or check the Infor ES technical manual for your porting set to see exactly what they do before running against a company with data. On Windows, Infor's example runs fillenv in the bin directory and calls bdbpre and bdbpost without the 6.2 suffix, so pick those program names; the BSE path uses your installation drive, for example D:\Infor\LN\bse. Always run against a test company first and take a backup of the target tables.
Check your copy plan
Send us your table list, source and target companies and LN version, and we will flag missing related tables and shared-table risks.
Optional. The tool and every export work without this. No spam.
How to use it
Enter the BSE path of the application server, the LN user to run as, the source and target company numbers, and the tables to copy, one logical table code per line. Pick the program names your porting set uses (many installations have bdbpre6.2 and bdbpost6.2 in $BSE/bin) and whether reference checks are skipped with -n. Save block 1 as the list file in the directory you run from, then run block 2a or 2b as the LN administrator. Finish with block 3. Copy into an empty or disposable target company first; bdbpost writes rows into the target tables and you should know what is there before you start.
What the commands do
bdbpre reads each table in the list file (-I) for the source company (-C) and writes the rows to the dump file (-O). bdbpost reads the dump (-I) and loads it into the target company (-c). The -n option loads without checking references to other tables, which is often needed when you copy tables in an order where the referenced data is not there yet. Because references are then not maintained during the load, Infor's procedure (written for copying general data to an archive company) follows up with Reorganize Tables (ttaad4225m000), with Reference Integrity and Repair Reference Counter, so the reference counters match the data again.
- BSE and BSE_TMP tell the tools where the installation and temp space are
- Check the bdbpost output and $BSE/log after every load
- -R and -f: used as in the Infor example; check your porting set help
Worked example
To give a new test company 901 the same currencies, units and business partners as company 001, list tcmcs001 and tccom100 (plus the related tables your scope needs), export from 001 and load into 901 with -n. Business partners reference many other tables, so a partial copy will have references that point nowhere; that is acceptable in a sandbox but not in a company users rely on. Reorganize Tables with Reference Integrity reports and repairs those references, and the bdbpost output shows any rows it could not load.
Gotchas
Table code mistakes are silent: a table missing from the list file is simply not copied. Running as the wrong user can produce permission errors on the dump or the database. Copying into a company that shares tables with another company (through company table linking) changes the shared data too, so check the data dictionary links first. Large tables need space under BSE_TMP for the dump. For whole-company copies Infor provides other procedures, so use this approach for a defined set of tables.
Frequently Asked Questions
What are bdbpre and bdbpost in Baan and Infor LN?
They are command-line database tools in $BSE/bin. bdbpre exports tables of a company to a sequential dump file and bdbpost imports a dump into a company. Together they copy table data between companies or environments without going through sessions.
Why run Reorganize Tables after bdbpost -n?
With -n the load skips reference checks and does not maintain the reference counters. Reorganize Tables (ttaad4225m000) with Reference Integrity and Repair Reference Counter selected checks references and repairs the counters for the target company, so later deletes and reference checks behave correctly.
Where is the Baan IV documentation for these tools?
The Infor LN online manual on docs.infor.com has a procedure for copying general data with bdbpre and bdbpost, and the Infor ES technical manuals describe the database tools for your porting set. For Baan IV, the matching Tools technical manual covers the same programs.
How do I find which tables to copy?
Use the data dictionary: Tables in the Tools data dictionary shows each table's fields and references, and the table list by package helps you see related tables. Copy referenced master tables together with the tables that point to them, or accept that references stay broken in a sandbox.
If you are setting up test companies for a private AI pilot on LN, we can help scope which tables the assistant needs and copy only those.
Related Tools
Infor LN and Baan ERP Table List by Package
Filterable list of commonly used Infor LN and Baan tables by package, with the naming convention, key fields and where a Baan IV table differs from LN.
Infor LN & BaanInfor LN Table Name and SQL Query Builder
Turn an LN logical table such as tcibd001 into the physical SQL table name with company suffix and a ready SELECT statement.
Developer ToolsInfor LN 4GL Embedded SQL Select Generator
Fill in a table, columns and a where clause and get a Baan / Infor LN embedded SQL select loop with host variables, index ordering and selectempty and selecterror handling.
More Infor LN & Baan tools
See all- Infor LN Common Data (tcmcs) General Tables Reference
- Infor LN Enterprise Server Error Codes and Log Files Reference
- Baan IV and Infor LN BSE Command-Line Tools Reference
- Baan IV to Infor LN Data Copy Downtime Calculator (bdbpre/bdbpost)
- Baan to Infor LN Migration Readiness Assessment
- Baan IV End-of-Life Risk Cost Calculator
- Infor LN Upgrade Cost Estimator
- Infor LN vs SyteLine Selector
- Baan Data Migration Effort Calculator
New to Infor LN and Baan? Start with the Infor LN and Baan guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.
Keep exploring
Free tools
- Baan IV to Infor LN Data Copy Downtime Calculator (bdbpre/bdbpost)Plan the downtime window for a bdbpre/bdbpost data copy from your measured throughput, parallel table lists and reorganize time.
- Infor LN and Baan ERP Table List by PackageFilterable list of commonly used Infor LN and Baan tables by package, with the naming convention, key fields and where a Baan IV table differs from LN.
- Infor LN SQL Query GeneratorFill in the table, company number and key range to get read-only SQL for the LN database, with the physical table name built for you.
ERP fixes and how-tos
- Infor LN Text Table: How Text Fields Are StoredHow Infor LN stores text fields in the text table (tttxt010), how to read it with SQL, and how to copy text between records or companies safely.
- Baan IV to Infor LN migration checklistPlan a Baan IV to Infor LN move as a re-implementation, not a patch: inventory customizations, convert data, rebuild logic, and run a real parallel test.
- How to Create an Infor LN User from a User Template and Copy AuthorizationsCreate Infor LN users from user templates and roles, copy authorizations safely, and avoid the common mistakes that give new users too much or too little.
Guides
- Baan ERP End of Life: What Are Your Real Options?Baan IV and Baan V are end-of-life. Explore your migration options to Infor LN, CloudSuite, or alternative ERPs with realistic timelines and costs.
- BAAN IV End of Life: Migration Options and Upgrade PathsBaan IV end-of-life migration options: upgrade to Infor LN (12-18 months), Baan to SAP S/4HANA (18-30 months), cloud ERP, or staged modernization.
- Baan ERP: History, Versions, and Modern Migration PathsBaan ERP history from Triton to Baan IV, Baan V, and Infor LN, plus practical migration paths for manufacturers still running Baan today. Get a proven roadmap.
Integrations
- How to add Slack to Baan IV / Baan VConnect Baan IV or V to Slack with an app, slash commands and interactive messages for alerts and lookups, built on database reads and safe imports.
- How to add AI agents to Baan IV and Baan VHow to add AI agents to Baan IV or Baan V: tool layer over read-only database access and AFS, human approval on writes, and an on-prem model. A practical guide.