China GB and GB/T Standards Quick Reference Table

Chinese drawings, test reports and factory audit findings cite GB and GB/T numbers that mean little to a buyer who works in ISO, IEC or ASTM. This table lets you search by number, subject or area and see the nearest international standard.

Download:
StandardSubjectStatusAreaNearest international standard
GB 4943.1
Safety of audio/video, information and communication technology equipment
Mandatory
Electrical safety
IEC 62368-1 (related)
GB 4706.1
Household and similar electrical appliances, general safety requirements
Mandatory
Electrical safety
IEC 60335-1
GB 7000.1
Luminaires, general requirements and tests
Mandatory
Electrical safety
IEC 60598-1
GB 5226.1
Electrical safety of machinery, electrical equipment of machines
Mandatory
Machinery
IEC 60204-1
GB 14048
Low-voltage switchgear and controlgear (series)
Mandatory
Electrical
IEC 60947 series
GB 3836
Explosive atmospheres, equipment protection (series)
Mandatory
Hazardous areas
IEC 60079 series
GB 17625.1
Limits for harmonic current emissions
Mandatory
EMC
IEC 61000-3-2
GB 31241
Lithium-ion cells and batteries for portable electronic equipment, safety
Mandatory
Batteries
IEC 62133 (related, not identical)
GB 38031
Electric vehicles traction battery safety requirements
Mandatory
Batteries
UN GTR 20 (related)
GB 2894
Safety signs and guidelines for the use
Mandatory
EHS
ISO 7010 (related)
GB 6675
Safety of toys (series)
Mandatory
Consumer products
ISO 8124 series (related)
GB 18401
National general safety technical code for textile products
Mandatory
Consumer products
None direct
GB 4806.1
Food contact materials and articles, general safety requirements
Mandatory
Food contact
None direct
GB 14881
Food production, general hygiene practice
Mandatory
Food
Codex general principles (related)
GB 7258
Motor vehicles, technical conditions for operation safety
Mandatory
Automotive
None direct
GB 18597
Hazardous waste storage, pollution control standard
Mandatory
Environment
None direct
GB 16297
Integrated emission standard of air pollutants
Mandatory
Environment
None direct
GB 8978
Integrated wastewater discharge standard
Mandatory
Environment
None direct
GB 12348
Emission standard for industrial enterprises noise at boundary
Mandatory
Environment
None direct
GB 32100
Legal entity and organization unified social credit code
Mandatory
Business data
None direct
GB 18030
Chinese coded character set (extends GBK)
Mandatory
Software and data
Unicode mapping
GB/T 19001
Quality management systems, requirements
Recommended
Management systems
ISO 9001
GB/T 24001
Environmental management systems, requirements
Recommended
Management systems
ISO 14001
GB/T 45001
Occupational health and safety management systems
Recommended
Management systems
ISO 45001
GB/T 19022
Measurement management systems
Recommended
Metrology
ISO 10012
GB/T 2828.1
Sampling procedures for inspection by attributes, lot-by-lot (AQL)
Recommended
Inspection
ISO 2859-1, ANSI/ASQ Z1.4 (related)
GB/T 2829
Periodic inspection procedures by attributes
Recommended
Inspection
None direct
GB/T 1804
General tolerances for linear and angular dimensions
Recommended
Drawings
ISO 2768
GB/T 1800.1
Limits and fits, basis of tolerances and deviations
Recommended
Drawings
ISO 286-1
GB/T 3098.1
Mechanical properties of fasteners, bolts, screws and studs
Recommended
Fasteners
ISO 898-1
GB/T 4208
Degrees of protection provided by enclosures (IP code)
Recommended
Electrical
IEC 60529
GB/T 2423
Environmental testing for electric and electronic products (series)
Recommended
Reliability
IEC 60068 series
GB/T 10125
Corrosion tests in artificial atmospheres, salt spray tests
Recommended
Reliability
ISO 9227
GB/T 4857
Packaging, basic tests for transport packages (series)
Recommended
Packaging
Related to ISTA and ASTM D4169 methods
GB/T 700
Carbon structural steels
Recommended
Materials
EN 10025 (related)
GB/T 699
Quality carbon structural steels
Recommended
Materials
EN 10083 (related)
GB/T 3077
Alloy structural steels
Recommended
Materials
EN 10083 (related)
GB/T 1220
Stainless steel bars
Recommended
Materials
ASTM A276 (related)
GB/T 20878
Stainless and heat-resisting steels, designations and chemical composition
Recommended
Materials
ASTM A240 and EN 10088 (related)
GB/T 3190
Wrought aluminium and aluminium alloys, chemical composition
Recommended
Materials
ASTM B209 and EN 573 (related)
GB/T 9439
Grey iron castings
Recommended
Materials
EN 1561 and ASTM A48 (related)
GB/T 1348
Ductile iron castings
Recommended
Materials
EN 1563 and ASTM A536 (related)
GB/T 16895
Low-voltage electrical installations (series)
Recommended
Electrical
IEC 60364 series
GB/T 2260
Codes for administrative divisions of the PRC
Recommended
Business data
None direct
GB/T 4754
Industrial classification for national economic activities
Recommended
Business data
ISIC (related)
GB/T 7408
Data elements and interchange formats, date and time
Recommended
Software and data
ISO 8601
GB 12904
Commodity bar code, retail commodity bar code
Mandatory
Labeling
GS1 EAN/UPC (related)

Standard numbers omit the year of issue on purpose. Editions are revised and replaced, so confirm the current edition and whether your product scope is covered before you cite a standard in a contract. Related means similar subject, not necessarily technically identical.

Standards library you can query

Want to ask questions across your own standards, drawings and supplier reports on-prem? Request an optional walkthrough.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the table

Type a number such as GB 5226.1, a subject such as stainless, or an area such as Environment into the search box. The Status column tells you whether the standard is mandatory or recommended. Use the Nearest international standard column as a starting point for conversations with a supplier's engineers, then request the actual standard text before accepting a claim of equivalence. Export the filtered rows to Excel if you want to attach them to a supplier quality agreement or an audit plan.

GB versus GB/T

In the national system, a plain GB prefix marks a mandatory standard and GB/T marks a recommended one. A recommended standard becomes binding when it is cited in a contract, a drawing or a mandatory regulation. Industry standards use other prefixes, for example JB for machinery, YB for metallurgy and HG for chemicals, and company standards are often tighter than either. When a supplier says a part meets GB, ask whether it means a mandatory GB or a GB/T and which edition.

  • GB: mandatory, legal minimum for the covered scope
  • GB/T: recommended, binding only when invoked
  • JB, YB, HG and similar: industry standards
  • Q/ prefix: enterprise standards owned by the factory

Equivalence is rarely exact

A GB number that maps to an IEC or ISO number may differ in test conditions, limits or national deviations. GB 31241 for portable batteries, for example, is related to IEC 62133 but is a separate document with its own requirements, and GB 4943.1 follows the IEC 62368-1 hazard-based approach with national differences. For anything safety critical, ask for a gap analysis or test to both standards instead of assuming a certificate for one covers the other.

Common mistakes

Buyers often cite a standard without an edition, which lets a supplier use an older, looser version. Another mistake is treating a management system standard such as GB/T 19001 as a product approval. It is not; it is the national adoption of ISO 9001 and says nothing about whether a specific product passes mandatory certification. Keep product conformity (CCC scope, test reports) separate from system certification in your supplier files.

Frequently Asked Questions

What is the difference between GB and GB/T?

GB is a mandatory national standard. GB/T is a recommended national standard that is not legally binding on its own but becomes binding when a contract, drawing or mandatory regulation refers to it. Always confirm the edition cited.

Is GB/T 19001 the same as ISO 9001?

GB/T 19001 is the Chinese national adoption of ISO 9001, so the requirements are aligned. A GB/T 19001 certificate from an accredited body is generally treated as a quality management system certificate, but it is not a product approval.

Can I use this table for compliance sign-off?

No. It is a navigation aid. Standards are revised, scopes are limited, and equivalence claims need technical review. Obtain the current official text and confirm applicability with a qualified lab or regulator before sign-off.

Why does the table show no years?

Editions change, and a stale year in a quick reference is worse than none. Look up the current edition on the official national standards platform or through your test lab before you cite it in a contract.

If you keep approved standards, test reports and supplier documents in an ERP or file share, Netray can build a private, on-prem assistant that answers questions over those documents with citations.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

Manufacturing hubs