Engineering & PLMFree referencePDF, Excel, Word exportManufacturingChina

China GB Steel and Alloy Grade Equivalents Reference

Chinese drawings and quotations use GB grade names such as Q235B, 45, 42CrMo or 06Cr19Ni10, while your drawing may call out ASTM, AISI or EN grades. This table lists the most common grades with their closest international equivalents.

Download:
Chinese gradeMaterial familyApprox. US (AISI/ASTM/UNS)Approx. EN / ISONote
Q235B
Carbon structural steel
ASTM A36
S235JR
Minimum yield 235 MPa for thin sections; weldable general steel
Q345B
Low alloy high strength steel
ASTM A572 Gr 50
S355JR
Minimum yield 345 MPa for thin sections
20
Quality carbon steel
AISI 1020
C22
Often carburized or used for welded parts
45
Quality carbon steel
AISI 1045
C45
Common for shafts; usually quenched and tempered
65Mn
Spring steel
AISI 1566 (approx)
No exact match
Verify chemistry against drawing
40Cr
Alloy structural steel
AISI 5140
41Cr4
Chromium steel for shafts and gears
35CrMo
Alloy structural steel
AISI 4135
34CrMo4
Chromium molybdenum steel
42CrMo
Alloy structural steel
AISI 4140
42CrMo4
High strength shafts, forgings
20CrMo
Alloy structural steel
AISI 4118 (approx)
18CrMo4 (approx)
Carburizing and weldable applications
20CrMnTi
Carburizing steel
No exact match
20MnCr5 (closest, verify)
Gear steel; titanium refines grain
GCr15
Bearing steel
AISI 52100
100Cr6
High carbon chromium bearing steel
Cr12MoV
Cold work tool steel
AISI D2 (approx)
X153CrMoV12 (approx)
Dies and punches; confirm composition
4Cr5MoSiV1 (H13)
Hot work tool steel
AISI H13
X40CrMoV5-1
Die casting and forging dies
3Cr2Mo (P20)
Plastic mold steel
AISI P20
1.2311 (approx)
Pre-hardened mold base steel
06Cr19Ni10
Austenitic stainless
AISI 304 / UNS S30400
1.4301 / X5CrNi18-10
Older designation 0Cr18Ni9
022Cr19Ni10
Austenitic stainless
AISI 304L / UNS S30403
1.4307 / X2CrNi18-9
Low carbon, better weld corrosion resistance
06Cr17Ni12Mo2
Austenitic stainless
AISI 316 / UNS S31600
1.4401 / X5CrNiMo17-12-2
Molybdenum for chloride resistance
022Cr17Ni12Mo2
Austenitic stainless
AISI 316L / UNS S31603
1.4404 / X2CrNiMo17-12-2
Low carbon 316
10Cr17
Ferritic stainless
AISI 430
1.4016 / X6Cr17
Magnetic, lower corrosion resistance than 304
12Cr13
Martensitic stainless
AISI 410
1.4006 / X12Cr13
Hardenable stainless
12Cr17Mn6Ni5N
Austenitic stainless
AISI 201
1.4372 / X12CrMnNiN17-7-5
Low nickel grade, weaker corrosion resistance than 304
HT250
Grey cast iron
ASTM A48 Class 35 (approx)
EN-GJL-250
Minimum tensile strength about 250 MPa
QT500-7
Ductile cast iron
ASTM A536 80-55-06 (approx)
EN-GJS-500-7
Tensile 500 MPa, elongation 7 percent
6061
Aluminium alloy
AA 6061
EN AW-6061
Same numeric designation; check temper such as T6
6063
Aluminium alloy
AA 6063
EN AW-6063
Extrusion alloy
5052
Aluminium alloy
AA 5052
EN AW-5052
Sheet alloy, good formability
7075
Aluminium alloy
AA 7075
EN AW-7075
High strength; check temper
1060
Aluminium alloy
AA 1060
EN AW-1060
Commercially pure aluminium
2A12
Aluminium alloy
AA 2024 (approx)
EN AW-2024 (approx)
Old Chinese designation style; confirm chemistry
H62
Brass
UNS C28000 (approx)
CuZn37 / CW508L (approx)
Copper 62 percent, zinc balance
HPb59-1
Free-cutting brass
UNS C36000 (approx)
CuZn39Pb3 (approx)
Contains lead; check RoHS and REACH exposure
T2
Copper
UNS C11000 (approx)
Cu-ETP (approx)
Electrolytic tough pitch copper
TU1
Oxygen-free copper
UNS C10200 (approx)
Cu-OF (approx)
Oxygen-free grade for vacuum and electronics

Equivalents are approximate, for orientation only. Chemical limits, mechanical properties, heat treatment and test requirements differ between standards. Before approving a substitution, compare the full specification and ask for a mill certificate to the drawing callout.

Material spec checks inside your ERP

Want incoming material certificates checked against your item master automatically? Ask for an optional review.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the table

Search the Chinese grade, a US grade or a family name such as stainless. Read across to see the approximate US and EN designations and a short note. If your drawing says AISI 4140 and the factory quotes 42CrMo, the table shows they are the same type of chromium molybdenum steel, but you still need a certificate that confirms the chemistry and mechanical result after heat treatment. Export the filtered rows to Excel to add to an approved material list or a quality agreement.

How Chinese grade names are built

Carbon steels such as Q235B use Q for yield point and the number for minimum yield in MPa, with a letter for quality class. Quality carbon steels such as 45 are named by carbon content in hundredths of a percent. Alloy steels such as 42CrMo show the carbon in hundredths followed by element symbols. Stainless grades such as 06Cr19Ni10 show carbon in hundredths and the nominal chromium and nickel percentages, and replaced older names like 0Cr18Ni9. Knowing the pattern helps you spot a wrong or unusual grade on a quote.

Where substitutions go wrong

The usual failures are aluminium temper left off the callout, stainless 201 sold as 304, free-cutting brass containing lead on a RoHS part, and mild steel quoted when a heat-treated alloy was required. Ask for a positive material identification (PMI) result or lab report for safety critical lots, and specify the standard and edition on the purchase order, not only the grade name.

  • Always add temper and heat treatment to the callout
  • Verify stainless with PMI, not a magnet alone
  • Request mill certificates with heat numbers
  • State the governing standard on the PO

Frequently Asked Questions

Is 06Cr19Ni10 the same as 304 stainless steel?

06Cr19Ni10 is the current Chinese designation for the 18-8 austenitic stainless type that corresponds to AISI 304 and EN 1.4301. Limits are close but not word-for-word identical, so check the mill certificate against your specification.

Is Q235 the same as A36 steel?

They are comparable general-purpose structural steels and are often treated as approximate equivalents, but chemistry limits, mechanical tests and thickness rules differ. For structural or pressure applications, confirm with an engineer and the governing code.

What does 45 steel mean?

45 is a quality carbon steel with about 0.45 percent carbon, comparable to AISI 1045 and EN C45. It is widely used for shafts and is usually supplied hot rolled, normalized or quenched and tempered, so state the condition.

Can I rely on this table for a drawing change?

Use it to start the conversation, not to approve a change. A design engineer must compare the full specifications, and your customer may require formal approval for any material change.

If your ERP item master carries material specifications, Netray can help build a private assistant that checks incoming certificates against the approved grade list.