Common OT and ICS Protocol Ports Reference

When you write a firewall rule between the office and the plant you need the port, the transport and some sense of the risk. This table puts the common industrial and supporting IT ports in one filterable list.

Download:
PortTransportProtocol or serviceTypically seen onFirewall note
20
TCP
FTP data
Legacy file transfer
Cleartext. Replace with SFTP.
21
TCP
FTP control
Machine tool and PLC backups
Cleartext credentials. Block between zones.
22
TCP
SSH and SFTP
Linux gateways, switches
Allow only from jump host.
23
TCP
Telnet
Old switches and controllers
Cleartext. Disable.
53
TCP/UDP
DNS
All networks
Restrict to approved resolvers.
69
UDP
TFTP
Firmware and config loads
No authentication. Allow briefly.
88
TCP/UDP
Kerberos
Windows domain
Needed to domain controllers only.
102
TCP
Siemens S7comm and ISO-TSAP, also IEC 61850 MMS
Siemens PLCs
Allow only from engineering stations and HMIs.
123
UDP
NTP
Time sync
Use an internal time source.
135
TCP
RPC endpoint mapper, used by classic OPC DCOM
Windows, OPC Classic
Wide dynamic range follows. Prefer OPC UA.
161
UDP
SNMP
Switches, UPS, printers
Use SNMPv3, restrict to monitoring server.
162
UDP
SNMP trap
Monitoring server
Inbound to monitoring only.
389
TCP/UDP
LDAP
Directory lookups
Prefer LDAPS on 636.
443
TCP
HTTPS
Web HMIs, cloud connectors, APIs
Inspect and limit destinations.
445
TCP
SMB
File shares, Windows hosts
Primary ransomware spread path. Block between zones.
502
TCP
Modbus TCP
PLCs, meters, drives
No authentication. Allow specific master to slave pairs only.
636
TCP
LDAPS
Directory lookups over TLS
Preferred over 389.
1433
TCP
Microsoft SQL Server
ERP, MES, historians
Allow only from app servers.
1521
TCP
Oracle listener (default)
Oracle databases
Allow only from app servers.
1883
TCP
MQTT
IIoT brokers
Cleartext. Use 8883 with TLS.
2222
UDP
EtherNet/IP implicit I/O
Rockwell and ODVA devices
Cyclic I/O. Keep inside the cell.
2404
TCP
IEC 60870-5-104
Utility and substation links
No native security. Isolate.
3389
TCP
RDP
Remote administration
Never expose to the internet. Jump host only.
4840
TCP
OPC UA (default)
Gateways, MES connectors
Use signed and encrypted endpoints.
5000
TCP
MTConnect agent (common default)
CNC data collection
Read only data, but still restrict.
5900
TCP
VNC
HMIs, remote screens
Weak auth often. Tunnel through jump host.
5985
TCP
WinRM HTTP
PowerShell remoting
Admin hosts only.
5986
TCP
WinRM HTTPS
PowerShell remoting over TLS
Admin hosts only.
8193
TCP
FANUC FOCAS (default)
FANUC CNC controls
Allow only from collection server.
8883
TCP
MQTT over TLS
IIoT brokers
Preferred to 1883.
9600
UDP/TCP
Omron FINS
Omron PLCs
No authentication by default.
20000
TCP/UDP
DNP3
Utilities, water, oil and gas
Limited native security. Isolate.
34980
UDP
EtherCAT over UDP
EtherCAT segments
Keep local to the machine network.
44818
TCP/UDP
EtherNet/IP explicit messaging (CIP)
Rockwell and ODVA devices
Allow from engineering station only.
47808
UDP
BACnet/IP
Building automation
Keep in a separate building zone.

These are default ports. Vendors and integrators change them, so confirm with a passive capture or the device manual before writing a firewall rule. A port number alone does not prove which protocol is running.

Plant firewall rule review

Optional review of your plant-to-office rules against this list.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Search by protocol name or port to find what a flow in a firewall log probably is. Use the typical column to guess which device class is talking. Use the note column when drafting a rule: it tells you which side should initiate and what to avoid. Export to Excel to attach to a firewall change request or an OT network design.

  • Search 502 to find Modbus TCP rules fast
  • Compare cleartext protocols against their secure variants
  • Attach the export to the change request

Why defaults matter

Most industrial protocols were designed for isolated networks, so many have no authentication or encryption. A firewall that allows port 502 from the whole office subnet gives every laptop write access to a controller. Rules should name a specific master and specific slaves, and be limited to the direction the protocol needs.

Verifying what actually runs

Defaults can be changed and many devices answer on unexpected ports. Before blocking anything on a live line, capture traffic from a mirror port for a full production cycle and compare it with this list. Block in monitor mode first, review the hits and then enforce. Unplanned blocks of cyclic I/O can stop a machine.

Common mistakes

Allowing any to any on SMB between plant and office is the usual ransomware path. Leaving RDP and VNC open to vendors without a jump host is the second. Remember also that classic OPC over DCOM needs a wide dynamic port range, which is one more reason to move to OPC UA with a single configurable port.

Frequently Asked Questions

Is Modbus TCP secure?

No. Standard Modbus TCP has no authentication or encryption, so any host that can reach port 502 can read and write registers. Protect it with segmentation, allow lists and, where available, a secure Modbus variant.

Which OPC UA port should I use?

4840 is the registered default for discovery and many servers, but servers can run on any port. Check the endpoint URL in the server configuration and use signed and encrypted security modes.

Why is 445 flagged so often?

SMB is the main way ransomware moves between Windows hosts. Blocking it between zones, and between workstations, removes a large share of lateral movement paths.

Does a port tell me the protocol?

Not reliably. It is a strong hint only. Confirm with a packet capture or an OT monitoring tool that understands the protocol before building rules on the assumption.

If you need a ready-made firewall rule review for your plant network, Netray can map your flows to this list with you.