Compliance & ContractsFree checklistPDF, Excel, Word exportDefense Electronics

CMMC Level 2 Self-Assessment Checklist and Certification Checklist

This checklist walks the 14 CMMC Level 2 control families in six working groups so a defense supplier can self-assess in an afternoon. Tick what you can prove with dated evidence, and the score shows where you are weakest before a C3PAO does.

0%

0 of 46 items complete

24 critical items still open - these are the highest-risk gaps.

Free, optional. Reopen it on any device.
Download checklist:

Scope and documentation (applies to all families)

Access Control and Identification and Authentication

Awareness, audit, configuration management

Incident response, maintenance, media and personnel

Physical protection, risk and security assessment

System and communications protection, and system integrity

Tick an item only when it is implemented and you hold dated evidence. Any unticked critical item is a likely finding. This is a planning aid, not a formal CMMC assessment.

Need a second pair of eyes on your readiness?

Optional expert review of your checklist result and where an on-prem AI layer could ease evidence work.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the checklist

Work through each group with the person who owns that area: IT for access and configuration, HR for personnel security, facilities for physical protection, and quality or contracts for CUI scope. Tick an item only when you can open a record that proves it. A setting without evidence, or a policy nobody follows, should stay unticked. Critical items are the ones that most often cause findings or block a pass.

Evidence to collect

For each tick, save evidence that shows the control works: exported policy settings, screenshots with dates, log samples, meeting minutes, training attendance and signed procedures. Assessors use examine, interview and test methods, so staff must also be able to explain what they do. Store evidence in one folder structure by control number so it can be produced quickly.

  • Policies and procedures with version and approval date
  • System configuration exports and screenshots
  • Logs, tickets and review records showing the control in operation
  • Training rosters and interview-ready owners

Reading your score

The percentage is a simple planning measure and is not the same as your SPRS score or an official assessment result. A Level 2 certification assessment expects all 110 requirements met, with only limited conditional status allowed under the CMMC program rules. Use this score to prioritize, then move gaps into a POA&M and calculate the SPRS score from the NIST SP 800-171 DoD Assessment Methodology.

Common mistakes

The biggest errors are scoping too narrowly, relying on a managed service without documenting who does what, and treating the checklist as a one-time task. Controls such as log review, access recertification and vulnerability remediation need recurring evidence over months. Start early so you can show operation over time, not a single snapshot.

Frequently Asked Questions

What does a CMMC Level 2 self-assessment involve?

You assess your environment against the 110 NIST SP 800-171 requirements, document each in an SSP, list gaps in a POA&M and calculate an SPRS score. Whether Level 2 needs a self or third-party assessment depends on the contract and CUI type.

Is this the same as a C3PAO assessment?

No. A C3PAO assessment is performed by an accredited third party who tests evidence against assessment objectives. This checklist helps you prepare and does not replace it.

What should I tick if a control is partly done?

Leave it unticked. Under the assessment methodology a requirement is either met or not met. Record the gap, assign an owner and a date, and track it in your POA&M.

How often should I repeat the self-assessment?

At least annually, and after significant changes such as a new ERP, cloud service or network layout. Affirmations to DoD under CMMC are also tied to ongoing compliance, so keep evidence current.

If you want evidence and policies searchable by an assistant that runs inside your own network, Netray can build that as a private AI layer on your on-prem systems.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

AI on your ERP