Conflict Minerals CMRT Supplier Tracking Worksheet
A conflict minerals program lives or dies on follow-up: who has sent a CMRT, which version, and whether their smelters are on the right lists. This worksheet gives you a single place to track it and export a clean record.
| Supplier | Part or commodity | 3TG in scope | CMRT status | CMRT version | Smelters listed | RMAP conformant or active | Conformant share | Follow-up due | |
|---|---|---|---|---|---|---|---|---|---|
90.5% | |||||||||
100% | |||||||||
0% | |||||||||
66.7% | |||||||||
0% |
Use one row per supplier and commodity. Conformant means conformant or active on the RMI Responsible Minerals Assurance Process list at the time of your review. Always re-check the smelter list before relying on it for a Form SD filing.
Automate supplier compliance tracking
Optional: see how supplier declarations in your ERP can be summarised privately without sending data outside your network.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
Add one row per supplier and covered commodity. Pick the 3TG metal in scope (tin, tantalum, tungsten, gold), set the CMRT status, and record the template version the supplier used. Enter the number of smelters or refiners the supplier listed and how many are conformant or active in the RMAP. The sheet computes a conformant share per row and an overall share. Set a follow-up date for anything overdue or expired, then export to Excel to share with procurement or your reporting team.
- Start with every supplier whose parts may contain tin, tantalum, tungsten or gold
- Mark suppliers with no declared 3TG so the decision is documented
- Keep the CMRT version, since older versions miss newer questions
- Review expired or overdue rows monthly during the reporting season
The method behind it
Section 1502 of the Dodd-Frank Act requires SEC registrants whose products contain necessary 3TG to perform a reasonable country of origin inquiry and, where needed, due diligence, then file Form SD by 31 May each year. Most companies use the RMI Conflict Minerals Reporting Template to collect supplier declarations and smelter lists, and align due diligence to the OECD guidance. The smelter or refiner is the choke point, which is why the conformant share is the key number. Customers outside the SEC population often ask for the same CMRT through their supply chain.
Reading the result and common mistakes
A high overall share is good, but a single supplier with zero smelters listed or a declaration of unknown is a gap, not a pass. Look at each low row and decide whether to escalate, request a corrected CMRT, or switch source. Treat the conformant share as a monitoring metric, not a compliance verdict.
- Accepting a blank or partly completed CMRT as received
- Tracking the company level only when the answer is product specific
- Not re-checking smelter status after the template date
- Forgetting 3TG in plating chemicals, solder and alloys
Frequently Asked Questions
What is a CMRT?
The Conflict Minerals Reporting Template is a standard spreadsheet maintained by the Responsible Minerals Initiative. A supplier uses it to declare whether tin, tantalum, tungsten or gold is in their products and to list the smelters or refiners in their supply chain.
Who has to file Form SD?
Companies that file reports with the SEC and manufacture or contract to manufacture products where necessary 3TG are present must conduct the inquiry and file Form SD each year. Suppliers outside the SEC population are usually asked for a CMRT by their customers.
What does RMAP conformant mean?
It means the smelter or refiner has undergone an audit under the Responsible Minerals Assurance Process and meets the standard. Active means it has committed to an audit. Check the current RMI lists, since status changes over time.
Does this replace the CMRT itself?
No. The CMRT is the supplier declaration. This worksheet is your internal tracker that records who responded, which version, and the quality of the smelter data, so you can chase gaps and keep an audit trail.
If your supplier declarations live in an ERP vendor record and a shared drive, we can help pull them into one governed view that your team queries on-prem.
Related Tools
RoHS Restricted Substances and Exemptions Reference
Searchable lookup of RoHS 2 substance limits, widely used Annex III exemptions and equipment categories.
Compliance & ContractsPFAS Reporting Worksheet
List PFAS-containing parts with CAS numbers, concentration and volume, and compute the annual PFAS mass per part and in total.
Compliance & ContractsEU REACH Article 33 Supplier SVHC Request Template
A supplier letter plus response table for SVHC content in articles, covering substance name, concentration, location in part and safe use information.
More Compliance & Contracts tools
See all- Supplier Material Declaration Request Letter Template
- RoHS Homogeneous Material Limit Margin Calculator
- SAP SoD Residual Risk Score Calculator
- SAP Firefighter ID Usage Review Log
- IBM i (AS/400) User Profile Access Review Worksheet
- SyteLine Security and User Access Audit Checklist
- Infor XA (MAPICS) User Access Review Worksheet
- China ERP Data Security and Compliance Assessment
- ERP Vendor Data Processing Agreement Outline
Keep exploring
Manufacturing hubs
- Suzhou and Kunshan, Jiangsu: Electronics and Precision ManufacturingElectronics and precision manufacturing in Suzhou and Kunshan, Jiangsu: foreign-invested plants, industries, ecosystem, requirements, ERP and private AI.
- Massachusetts manufacturing: defense electronics, robotics and medical devicesMassachusetts manufacturing guide: defense electronics, robotics and medical devices, local ecosystem, ITAR, ISO 13485 and CMMC needs, ERP and private AI for shops.