RoHS Restricted Substances and Exemptions Reference
RoHS questions come up in every design review and every supplier survey. This reference puts the ten restricted substances, the exemptions most often cited on bills of materials and the eleven equipment categories in one searchable table.
| Reference | Type | Item | Limit or scope | Note |
|---|---|---|---|---|
Annex II | Substance | Lead (Pb) | 0.1% by weight | Per homogeneous material |
Annex II | Substance | Mercury (Hg) | 0.1% by weight | Per homogeneous material |
Annex II | Substance | Cadmium (Cd) | 0.01% by weight | Stricter limit than the others |
Annex II | Substance | Hexavalent chromium (Cr VI) | 0.1% by weight | Per homogeneous material |
Annex II | Substance | Polybrominated biphenyls (PBB) | 0.1% by weight | Flame retardant class |
Annex II | Substance | Polybrominated diphenyl ethers (PBDE) | 0.1% by weight | Flame retardant class |
Annex II | Substance | DEHP (bis(2-ethylhexyl) phthalate) | 0.1% by weight | Added by Delegated Directive (EU) 2015/863 |
Annex II | Substance | BBP (butyl benzyl phthalate) | 0.1% by weight | Added by Delegated Directive (EU) 2015/863 |
Annex II | Substance | DBP (dibutyl phthalate) | 0.1% by weight | Added by Delegated Directive (EU) 2015/863 |
Annex II | Substance | DIBP (diisobutyl phthalate) | 0.1% by weight | Added by Delegated Directive (EU) 2015/863 |
Annex III 6(a) | Exemption | Lead in steel for machining and galvanised steel | Up to 0.35% lead by weight | Check current expiry before relying on it |
Annex III 6(b) | Exemption | Lead in aluminium alloys | Up to 0.4% lead by weight | Check current expiry before relying on it |
Annex III 6(c) | Exemption | Lead in copper alloy | Up to 4% lead by weight | Common for brass machined parts |
Annex III 7(a) | Exemption | Lead in high melting temperature solders | Lead-based alloys with 85% lead or more | Not for standard tin-lead eutectic solder |
Annex III 7(c)-I | Exemption | Lead in glass or ceramic, other than dielectric ceramic in capacitors | Component specific | Example: piezoelectronic devices |
Annex III 7(c)-II | Exemption | Lead in dielectric ceramic of capacitors | Rated 125 V AC or 250 V DC or higher | Check scope wording in the annex |
Annex III 8(b) | Exemption | Cadmium and its compounds in electrical contacts | Component specific | Check current scope and expiry |
Annex III 15 | Exemption | Lead in solders in flip chip packages | Between semiconductor die and carrier | Only to complete a viable electrical connection |
Annex I | Category | Category 1 | Large household appliances | |
Annex I | Category | Category 2 | Small household appliances | |
Annex I | Category | Category 3 | IT and telecommunications equipment | |
Annex I | Category | Category 4 | Consumer equipment | |
Annex I | Category | Category 5 | Lighting equipment | |
Annex I | Category | Category 6 | Electrical and electronic tools | Large-scale stationary industrial tools are excluded |
Annex I | Category | Category 7 | Toys, leisure and sports equipment | |
Annex I | Category | Category 8 | Medical devices | In scope since 2014 for most devices |
Annex I | Category | Category 9 | Monitoring and control instruments including industrial | Industrial instruments in scope since 2017 |
Annex I | Category | Category 10 | Automatic dispensers | |
Annex I | Category | Category 11 | Other EEE not covered by categories 1 to 10 | Open scope since 2019 |
Exemptions are renewed, amended or allowed to expire by the European Commission. Confirm the current wording and validity period in the Official Journal or EUR-Lex before you rely on an exemption in a declaration. This table is a quick lookup, not a legal interpretation.
Search material declarations privately
Optional: talk through putting supplier RoHS and REACH documents behind an on-prem search.
Optional. The tool and every export work without this. No spam.
How to use the reference
Type a substance, an exemption number or a keyword such as solder or brass into the search box. Use the Type column to filter the three groups. For a part on your BOM, check the substance limits first, then see whether a listed exemption applies to the specific use. Export the rows you need to PDF or Excel to attach to a design review or a supplier declaration request.
- Search 7(a) to find the high melting temperature solder exemption
- Search copper to find the 6(c) brass entry
- Filter by Category to confirm whether your product is in scope
The rule behind the numbers
Directive 2011/65/EU, known as RoHS 2, restricts hazardous substances in electrical and electronic equipment placed on the EU market. The limits apply to each homogeneous material, meaning a part that cannot be mechanically separated further, not to the whole product. Delegated Directive (EU) 2015/863 added four phthalates, bringing the list to ten substances. Conformity is shown through technical documentation and the CE marking with an EU declaration of conformity.
Common mistakes
The most frequent errors are applying the limit at product level instead of homogeneous material level, assuming an exemption covers a whole assembly, and using an exemption that has expired or been narrowed. Keep a record of which exemption supports each part, and review them whenever the Commission publishes a change.
- Citing an exemption number without checking its scope wording
- Ignoring plasticisers in cable jackets and seals
- Accepting a supplier RoHS statement without test data or a declaration
- Forgetting that spares and repairs have their own rules
Frequently Asked Questions
What are the RoHS limits?
Lead, mercury, hexavalent chromium, PBB, PBDE and four phthalates are limited to 0.1% by weight in homogeneous materials. Cadmium is limited to 0.01%. The limits apply to each homogeneous material rather than to the finished product as a whole.
What is a homogeneous material?
It is a material of uniform composition throughout, or a material made of a combination that cannot be disjoined or separated into different materials by mechanical actions such as unscrewing, cutting, crushing or grinding.
Do RoHS exemptions expire?
Yes. Exemptions in Annex III are granted for limited periods and can be renewed, amended or allowed to lapse. Always check the current validity in EUR-Lex before using one in your declaration of conformity.
Is industrial equipment covered?
Industrial monitoring and control instruments entered scope in 2017 under category 9, and category 11 has been open scope since 2019. Large-scale stationary industrial tools remain excluded. Check the scope wording for your product.
If you keep RoHS and material declarations scattered across supplier files and your ERP item master, we can help build a private search over them.
Related Tools
EU REACH Article 33 Supplier SVHC Request Template
A supplier letter plus response table for SVHC content in articles, covering substance name, concentration, location in part and safe use information.
Compliance & ContractsCE Marking Conformity Readiness Assessment
Answer nine questions on directives, standards, technical file and declaration to see how ready you are to affix the CE mark.
Compliance & ContractsConflict Minerals CMRT Supplier Tracking Worksheet
Track which suppliers returned a Conflict Minerals Reporting Template, which version, and what share of their smelters are RMAP conformant.
Compliance & ContractsREACH SVHC Supplier Declaration Response Template
Fill in a clear supplier declaration that answers a customer's REACH SVHC request with Candidate List version, substances and safe use information.
More Compliance & Contracts tools
See all- SAP SoD Residual Risk Score Calculator
- SAP Firefighter ID Usage Review Log
- IBM i (AS/400) User Profile Access Review Worksheet
- SyteLine Security and User Access Audit Checklist
- Infor XA (MAPICS) User Access Review Worksheet
- China ERP Data Security and Compliance Assessment
- ERP Vendor Data Processing Agreement Outline
- GDPR ERP Data Migration Checklist
- EU Machinery Regulation 2023/1230 Readiness Checklist
Keep exploring
Free tools
- RoHS Compliance Declaration TemplateFill in product and company details to produce a RoHS declaration that lists the restricted substances, limits, exemptions and evidence basis.
- RoHS Homogeneous Material Limit Margin CalculatorConvert lab or supplier mass data into a weight percent per homogeneous material and see how much margin you have to the RoHS maximum concentration value.
- New Product Introduction Compliance Gate ChecklistA gate review checklist covering market scope, standards, restricted substances, markings, technical file and post-market duties before a product is released.