Controlled Shipping Containment Cost Calculator
When a customer places you in controlled shipping, extra inspection starts immediately and nobody has priced it. This calculator estimates headcount, labor and defects caught for 100 percent inspection, and shows the residual defects that still escape because inspection is never perfect.
Your numbers
Net of breaks, handling and paperwork.
Share of defective parts a human inspector will actually catch. Visual inspection is rarely above 90 percent.
Your results
Excludes gages, fixtures, training, reinspection of rework and any customer-mandated third-party sorting charges.
Containment labor cost vs duration
Sweeps Containment duration from 5 to 120, holding your other inputs fixed.
Containment tracking from ERP records
Optional: talk through tracking quarantined lots and exit criteria directly in your ERP.
Optional. The tool and every export work without this. No spam.
How to use it
Enter daily shipped quantity, the seconds needed to inspect one part and productive hours per inspector. Add the loaded labor rate, expected duration and the defect rate you saw before containment. Set an honest effectiveness figure. The output gives inspectors required, labor cost over the period, the number of defects caught and the cost per defect found. If the customer sets an exit criterion such as a number of clean shipments, set the duration to the time you expect to need.
The formulas
Inspection hours per day equal quantity times seconds per part divided by 3600. Inspectors are that figure divided by productive hours, rounded up. Labor equals hours per day times rate times days. Defects caught equal quantity times days times defect PPM over a million times effectiveness. Residual shipped PPM equals the original PPM times one minus effectiveness. Cost per defect is labor divided by defects caught.
Reading the result
A cost per defect found in the hundreds or thousands of dollars is a strong argument to fix the cause. Containment buys time, not quality. Also read the residual PPM: with 85 percent effectiveness, 2,500 PPM becomes about 375 PPM, which may still be unacceptable. If so, consider automated inspection, a second independent check or a smaller scope aimed at the failing characteristic.
Common mistakes
People assume 100 percent inspection is 100 percent effective. Human inspectors lose accuracy with fatigue and repetition, so effectiveness falls over a shift and with low defect rates. Another error is ignoring that inspection time per part grows when the inspector must also record data or segregate suspect parts. Finally, forgetting to include supervision and the extra floor space and containers for quarantined parts.
Frequently Asked Questions
What is controlled shipping?
Controlled shipping is a customer-imposed process where a supplier adds an extra inspection or containment step on shipments after a quality escape. Levels and rules are defined by each customer, so follow their procedure.
How effective is visual inspection?
Effectiveness varies widely by defect type, lighting and fatigue. Many studies of manual visual inspection show results well below 100 percent, so planning on 80 to 90 percent is more honest than assuming perfection.
How long does containment last?
Duration is set by the customer's exit criteria, for example a number of consecutive shipments with no defects found. Use a realistic length rather than the minimum when estimating cost.
Is containment the same as corrective action?
No. Containment protects the customer in the short term. Corrective action removes the cause. This calculator helps show why corrective action is usually cheaper than long containment.
Netray can help link containment records, lot data and defect history in your ERP, so exit criteria can be shown from the record instead of a spreadsheet.
Related Tools
PPAP Late Approval Cost of Delay Calculator
Put a dollar figure on a slipping PPAP so you can justify overtime, extra gage capacity or an outside lab to the program owner.
Quality & InspectionPPAP Initial Process Study Ppk Calculator
Enter spec limits, mean and overall standard deviation from your initial process study to get Pp, Ppk, expected PPM and the sigma reduction needed to hit your target.
Quality & InspectionJob Shop Scrap and Rework Cost Calculator
Put a dollar figure on annual scrap and rework, net of recovery, and test how much a reduction program is worth.
Field Service & QualitySupplier Quality Scorecard
Rate a supplier across defect rates, delivery, corrective action, certifications, and risk to get a clear classification and recommended actions.
More Quality & Inspection tools
See all- PPAP Submission Level Requirements Reference
- PPAP Part Submission Warrant Template
- APQP Timing Plan Worksheet
- IATF 16949 Internal Audit Checklist
- Run at Rate Calculator
- PPAP Dimensional Results Worksheet
- Customer Specific Requirements Matrix Worksheet
- APQP Phase Gate Checklist
- PFMEA Worksheet with RPN for PPAP
Keep exploring
Free tools
- Controlled Shipping CS1 and CS2 Containment Log WorksheetAn editable log for controlled shipping level 1 and level 2 containment: quantity sorted, defects found, hours, cost and the consecutive clean lots needed to exit.
- Containment Action Plan TemplateA fill-in containment plan that lists every suspect location, the sort or inspection action, the owner and the criteria for releasing stock.
- Aerospace Escaped Defect Containment Cost CalculatorModels defects through three detection points and prices each, so you can see what a better incoming inspection is worth.
AI on your ERP
- Epicor Kinetic AI for Automotive Suppliers: EDI Releases, ASN, PPAP and Scorecard QuestionsPrivate AI on Epicor Kinetic for automotive suppliers: EDI releases, ASN, PPAP, scrap and scorecard questions answered in plain English from live data.
- AI for Plex in Automotive Supply: Answers From Your Own Releases, Control Plans and Containment RecordsPrivate AI on Plex for Tier 1 and Tier 2 auto suppliers: ask about PPAP, control plans, customer releases and containment, with read-only API access.