Rolled Throughput Yield Calculator for Electronics Assembly
First pass yield at each stage can look healthy while the overall line performs poorly. Rolled throughput yield multiplies the stages together and shows the share of boards that go through everything without rework.
Your numbers
First pass yield at this stage, before any rework.
Labor, retest and handling per board needing rework.
Your results
RTY here is the product of first pass yields. It assumes stages are independent and that a board reworked at any stage counts as not passing first time. Use your own measured data for each stage.
RTY as reflow and AOI yield changes
Sweeps Reflow and AOI yield from 90 to 100, holding your other inputs fixed.
See RTY by line from live ERP and MES data
An optional review of how stage results can be rolled up automatically.
Optional. The tool and every export work without this. No spam.
How to use the calculator
Enter the number of boards started and the first pass yield for each stage, taken from your inspection or test records over a recent period. Add a typical cost per rework event. The tool returns RTY, the number of boards touched by rework or scrap and the estimated cost. Drag a slider to see how improving one stage changes the total, and read the chart for a sweep of the reflow stage.
The formula
RTY equals the product of each stage's first pass yield. With stage yields of 98.5, 99.2, 97.8, 96.5 and 98.0 percent, the product is about 90.4 percent, so nearly one board in ten is touched even though no single stage is below 96 percent. Plants that quote only the final test yield miss this hidden factory of rework.
- Use first pass yield, not final yield after rework
- A stage with low yield pulls RTY down the most per point
- Yield differences compound across stages
Reading the result
The lowest stage yield is the first place to look, but also compare the cost impact. A small loss at the final test stage can cost more per board than a bigger loss at print, because more value has been added. For defense work the cost of rework also includes documentation, reinspection and a possible customer notification.
Common mistakes
The usual error is using yield after rework, which hides the problem. Another is mixing board-level yield with panel-level or part-level yield. Make sure each stage uses the same unit of count. Finally, avoid comparing RTY across products without noting complexity, since a dense mixed-technology board will differ from a simple one.
Frequently Asked Questions
What is the difference between FPY and RTY?
First pass yield is the share passing a single stage first time. Rolled throughput yield multiplies the stages so it shows the share that passes every stage first time. RTY is always lower than or equal to the lowest FPY.
Is RTY the same as final yield?
No. Final yield counts boards that eventually ship, including those that were reworked. RTY counts only boards that were right first time, so it exposes the rework burden that final yield hides.
How many stages should I include?
Include the stages where you record pass and fail results. Five is common for SMT lines. More stages give a more accurate picture but need data you can trust. Add or leave out stages by setting a yield to 100 percent.
How does rework affect IPC and defense requirements?
Rework and repair must follow approved procedures and may be limited by the customer or class. Frequent rework also increases risk to the assembly, so reducing it is a reliability goal as well as a cost goal.
If your MES or ERP records stage results, Netray can calculate RTY by line and by part automatically so you do not need to re-key data each month.
Related Tools
Solder Joint Defect Log and DPMO Worksheet
Log solder defects by board, reference designator and type, with opportunities per board and DPMO calculated per entry and overall.
Quality & InspectionJ-STD-001 Solder Workmanship Inspection Checklist
A four-part checklist for auditing a soldering line against J-STD-001 intent: materials, process control, workmanship and cleanliness, with critical items flagged.
Quality & InspectionRework vs Scrap Disposition Break-Even Calculator
Expected cost of rework (including failures) versus scrap and remake, and the rework cost at which both options cost the same.
Electronics ManufacturingReflow Oven Profile and Solder Paste Log Worksheet
An editable log of reflow profile results and solder paste lots, with peak temperature margin and time above liquidus margin calculated per run.
More Quality & Inspection tools
See all- Solder Defect DPMO and First Pass Yield Calculator
- PCBA Rework Cost Tracking Worksheet
- SAP QM Process Capability Cp Cpk Calculator
- SAP QM Lot Rejection Rate, PPM and Sigma Level Calculator
- SAP QM Gauge R&R Study Calculator
- SAP QM Cp and Cpk Capability Calculator
- Job Shop Material Certification Log Worksheet
- Job Shop First Piece Inspection Sign-Off Template
- Job Shop Scrap and Rework Cost Calculator
Keep exploring
Free tools
- Rolled Throughput Yield CalculatorMultiply first pass yield across process steps to find true rolled throughput yield and the units that never pass first time.
- SMT First Pass Yield and Rolled Throughput Yield CalculatorMultiply stage yields from print to test to get rolled throughput yield and see how many good boards you really get from a lot.
- Rolled Throughput Yield and Rework Cost CalculatorCompute rolled throughput yield from the first time through yield of five steps, plus the starts required and the cost of rework.