DMAIC Phase Gate Review Checklist

A DMAIC phase gate is only useful if the reviewer asks the same questions every time. This checklist lists exit criteria for each of the five phases so sponsors and Black Belts can approve, hold or redirect a project based on evidence.

0%

0 of 37 items complete

9 critical items still open - these are the highest-risk gaps.

Download checklist:

Define gate

Measure gate

Analyze gate

Improve gate

Control gate

A gate passes when every item marked critical is complete and at least 80 percent of the remaining items are done. Record the gap list and the decision with the reviewer name and date.

Link projects to ERP quality data

Optional: a short call on pulling baseline and post-improvement metrics from your ERP for project reviews.

Optional. The tool and every export work without this. No spam.

How to use it

Run the checklist at the end of each phase, not only at project close. The Green Belt prepares the evidence, a Black Belt or Master Black Belt reviews it and the sponsor attends the Define and Control gates. Tick items that are truly done with an artifact, such as a signed charter, a gage R&R report or a control plan, and note what is missing for the rest. Export the result to PDF or Excel to attach to the project record.

  • Critical items must be complete before the gate passes
  • Attach evidence, not just a tick
  • Record the decision: pass, pass with actions or hold

What each phase has to prove

Define proves the problem is worth solving and bounded. Measure proves you can trust the data and know the baseline. Analyze proves the causes with data. Improve proves the fix works in a pilot and does not create new risk. Control proves the gain will stay: owners, monitoring, reaction plans and updated documents. Skipping the measurement system analysis or the pilot are the two most frequent reasons projects fail to hold their gains.

Reading the result

If a critical item is missing, hold the gate and agree an action date. If a project passes with several non-critical items open, record them as actions with owners. Watch for a pattern: if projects regularly fail the Measure gate on measurement system analysis, add gage R&R training or a standing metrology resource. Gate data across projects show where the program itself needs improvement.

Common mistakes

Reviewers often accept a solution at Analyze, before root cause is verified, which leads to solution-first projects. Others skip the pilot and go straight to full rollout. Another trap is to claim savings that finance has not validated. Finally, closing the project without a control plan, a named process owner and updated work instructions lets the process drift back within months.

Frequently Asked Questions

Do I need all five gate reviews for small projects?

Small projects can combine reviews, for example Define and Measure, but the exit criteria still apply. Skipping the Control review is the riskiest shortcut, since it is the phase that protects the gains.

Who should approve each gate?

A Black Belt or Master Black Belt normally approves technical content, and the sponsor approves scope, resources and financial benefit. The process owner should be present at the Improve and Control gates.

How is DMAIC different from DMADV?

DMAIC improves an existing process. DMADV, also called DFSS, designs a new process or product: Define, Measure, Analyze, Design, Verify. The checklist here covers DMAIC only.

What if the data show no improvement at the pilot?

Do not pass the Improve gate. Return to Analyze to check whether the root cause was verified, review whether the pilot was run correctly, and consider other solutions. A failed pilot is useful information, not a project failure.