Microsoft DynamicsFree referencePDF, Excel, Word exportMicrosoft Dynamics GPAll Microsoft Dynamics GP tools

Dynamics GP System Tables Reference: SY00500, SY01400, SY03900 and the DYNAMICS Database

This reference covers the Dynamics GP system tables most module table maps skip: SY tables in each company database, the user, company and security tables in the DYNAMICS system database, and the DEX_LOCK and DEX_SESSION lock tables in tempdb. Each row gives the key columns and how it joins.

Download:
TableDatabaseDisplay nameKey columnsUse it forJoin tip
SY00500
Company
Posting Definitions Master (batch headers)
BCHSOURC, BACHNUMB
Find stuck or marked batches: BCHSTTUS (batch status), MKDTOPST (marked to post), USERID
Match SY00800 on BACHNUMB and BCHSOURC plus company name
SY00800
DYNAMICS
Batch Activity
BACHNUMB, BCHSOURC, USERID, CMPNYNAM
Batches currently open or being posted by a user
Stale rows here keep a batch locked after a crash
SY00801
DYNAMICS
Resource Activity
USERID, CMPNYNAM
Resources (such as posting processes) locked by a user
Clear only for users with no ACTIVITY row
ACTIVITY
DYNAMICS
User Activity (logged-in users)
USERID, CMPNYNAM, LOGINDAT, LOGINTIM, SQLSESID
Who is logged in to which company
SQLSESID links to DEX_SESSION.session_id in tempdb
DEX_SESSION
tempdb
Dexterity sessions
session_id, sqlsvr_spid
Map a GP session to its SQL Server SPID
Orphans remain when users are killed; clean with ACTIVITY
DEX_LOCK
tempdb
Dexterity record locks
session_id, row_id, table_path_name
Find which session holds a record lock (for example a document in use)
Join session_id to DEX_SESSION, then to ACTIVITY.SQLSESID
SY01400
DYNAMICS
Users Master
USERID, USERNAME
List GP users and their names
Join SY60100 on USERID for company access
SY01402
DYNAMICS
User Defaults
USERID, syDefaultType, SYUSERDFSTR
Per-user saved settings and defaults
One row per user per default type
SY01500
DYNAMICS
Company Master
CMPANYID, INTERID, CMPNYNAM
Map company ID to database name (INTERID) and display name; next note index (NOTEINDX)
INTERID = the company database name
SY60100
DYNAMICS
User-Company Access
USERID, CMPANYID
Which users can open which companies
Join SY01500 on CMPANYID for names
SY10500
DYNAMICS
Security Assignment User Role
USERID, CMPANYID, SECURITYROLEID
Roles assigned to a user per company
Join SY10600 on SECURITYROLEID
SY10600
DYNAMICS
Security Assignment Role Task
SECURITYROLEID, SECURITYTASKID
Tasks inside each role
Join SY10700 on SECURITYTASKID
SY10700
DYNAMICS
Security Assignment Task Operations
SECURITYTASKID, DICTID, SECRESTYPE, SECURITYID
Windows, reports and tables each task grants
Resolve SECURITYID with the Security Resource Descriptions
SY09000
DYNAMICS
Security Tasks Master
SECURITYTASKID
Task names and descriptions
Join from SY10600
SY09100
DYNAMICS
Security Roles Master
SECURITYROLEID
Role names and descriptions
Join from SY10500
MC40200
DYNAMICS
Currency Setup
CURNCYID, CURRNIDX
Currency IDs, descriptions and index
CURRNIDX is the key used in many transaction tables
DU000020
DYNAMICS
Product versions per company
companyID, PRODID, versionMajor, versionMinor, versionBuild
Check each company is at the same GP and add-in version before an upgrade
companyID matches SY01500.CMPANYID
DB_Upgrade
DYNAMICS
Database upgrade status
db_name, PRODID, db_verMajor, db_verMinor, db_verBuild, db_status
Find a database or product stuck mid-upgrade
db_status not 0 means an incomplete upgrade
SY00100
Company
System Database Setup
DBNAME
Name of the system database the company belongs to
Must keep the system database name after a test restore
SY03900
Company
Record Notes Master
NOTEINDX
Note text (TXTFIELD) attached to records
Join on the NOTEINDX column of the master record, for example RM00101.NOTEINDX
SY04200
Company
Comment Master
COMMNTID, CMTSRIES
Predefined document comments (CMMTTEXT)
COMMNTID appears on sales and purchasing documents
SY02300
Company
Posting Setup
SERIES, TRXSOURC
Posting options per transaction source (post to GL, through GL, journals)
Maintained in Tools > Setup > Posting > Posting
SY01100
Company
Posting Accounts Master
SERIES, SEQNUMBR
Default posting accounts by series (ACTINDX)
Join ACTINDX to GL00100 and GL00105 for account numbers
SY40100
Company
Period Setup
YEAR1, PERIODID, SERIES, ODESCTN
Which series and windows are closed per period (CLOSED)
Check before posting into a back period
SY40101
Company
Period Header
YEAR1
Fiscal year first and last day, number of periods, historical year flag
Join SY40100 on YEAR1
SY00300
Company
Account Format Setup
Single setup row
Account framework length and segment layout for the company
Read before building account strings in SQL
SY00600
Company
Location Master (company addresses)
CMPANYID, LOCATNID
Company address IDs used on documents
Not the inventory site table (IV40700)
SY01200
Company
Internet Addresses
Master_Type, Master_ID, ADRSCODE
Email addresses (INET1) and internet info for customers, vendors, company
Master_Type CUS or VEN plus Master_ID and address code
SY03000
Company
Shipping Methods Master
SHIPMTHD
Shipping method IDs and descriptions
SHIPMTHD on SOP and POP documents
SY03300
Company
Payment Terms Master
PYMTRMID
Payment terms and due date rules
PYMTRMID on customers, vendors and documents
MC40000
Company
Multicurrency Setup
FUNLCURR, FUNCRIDX
Functional currency of the company
Join FUNLCURR to DYNAMICS..MC40200

Names follow the GP table descriptions (Tools > Resource Descriptions > Tables in the GP client). In GP 2013 and later the system database can have a name other than DYNAMICS; read SY00100.DBNAME in a company database to find it. Query with read-only logins and never delete from DYNAMICS or tempdb tables while users are logged in.

Want a GP admin query pack?

Tell us your GP version and pain points, and we will send the user, security and lock queries checked for your setup.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Filter by database to see what lives where: company tables hold setup and notes for one company, DYNAMICS holds users, companies, security and activity for the whole install, tempdb holds live locks. Use the key columns to write joins, and the join tip column for the usual next table. Typical tasks: list who has access to which company (SY01400 + SY60100 + SY01500), show roles per user (SY10500 + SY09100), find who holds a record lock (DEX_LOCK + DEX_SESSION + ACTIVITY), or pull notes onto a customer report (RM00101.NOTEINDX + SY03900).

  • Users: SY01400, company access: SY60100
  • Companies and database names: SY01500.INTERID
  • Batches: SY00500 (company) and SY00800 (DYNAMICS)
  • Notes: SY03900 via NOTEINDX

Where this lives in Dynamics GP

In the GP client, Microsoft Dynamics GP > Tools > Resource Descriptions > Tables lets you search any table by display or physical name and see its fields. Batch status is visible in Batch Recovery (Microsoft Dynamics GP > Tools > Routines > Batch Recovery). User Activity is under Tools > Utilities > System > User Activity. User Access and User Security are under Tools > Setup > System. Each window reads the tables listed here, so the SQL gives the same answer as the window, across all companies at once.

Worked example: clear a stuck batch safely

When a batch is stuck after a workstation crash, first make sure the user is not logged in (no ACTIVITY row, or all users out), then check SY00800 for a row for that batch and confirm Batch Recovery cannot finish it. The commonly used fix is: DELETE DYNAMICS..SY00800 WHERE BACHNUMB = 'RMCSH00012' AND BCHSOURC = 'RM_Cash'; then in the company database UPDATE SY00500 SET BCHSTTUS = 0, MKDTOPST = 0, USERID = '' WHERE BACHNUMB = 'RMCSH00012' AND BCHSOURC = 'RM_Cash'; Take a backup first and check the batch's transactions before reposting.

Version differences and gotchas

From GP 2013 the system database can be named something other than DYNAMICS, so scripts that hardcode DYNAMICS fail on named system databases; read SY00100.DBNAME. Security moved to roles and tasks in GP 10, so older scripts that query pre-GP 10 security tables do not apply. Deleting ACTIVITY or tempdb rows for users who are still working causes data damage; check SQL sessions first. Notes text is stored in TXTFIELD as text, so cast it when exporting.

Frequently Asked Questions

What is the SY00500 table in Dynamics GP?

SY00500 is Posting Definitions Master, the batch header table in each company database. It holds one row per batch with BCHSOURC, BACHNUMB, status (BCHSTTUS), marked-to-post flag (MKDTOPST) and USERID. Stuck batches are usually fixed by resetting BCHSTTUS and MKDTOPST after clearing SY00800.

Which table holds Dynamics GP users?

SY01400 (Users Master) in the DYNAMICS system database holds user IDs and names. Company access is in SY60100, and security role assignments per company are in SY10500. Join SY60100 to SY01500 on CMPANYID to show company names.

Where are notes stored in Dynamics GP?

In SY03900 (Record Notes Master) in each company database. Master records such as customers (RM00101) and vendors (PM00200) have a NOTEINDX column; join it to SY03900.NOTEINDX to read TXTFIELD. The next note index for the company is tracked in SY01500.NOTEINDX in DYNAMICS.

How do I see which GP user is locking a record?

Query tempdb..DEX_LOCK for the table and row, join session_id to tempdb..DEX_SESSION, then join to DYNAMICS..ACTIVITY on SQLSESID to get the USERID and company. If the session is orphaned (no ACTIVITY row), the lock can be cleared after all checks.

If you want your GP admins to ask who is locked, which batches are stuck or who can access a company in plain English on your own servers, we can build that.

Get Microsoft Dynamics GP alerts

Support and maintenance deadlines, release changes that affect Microsoft Dynamics GP sites, and new free Microsoft Dynamics GP tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Microsoft Dynamics GP: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Microsoft Dynamics GP? Start with the Microsoft Dynamics GP guide and toolkit.

Keep exploring

Free tools

ERP fixes and how-tos

AI on your ERP

Integrations

Comparisons