Engineering & PLMFree referencePDF, Excel, Word export

Engineering Drawing Line Types Reference (ASME Y14.2 Style)

Reading a drawing correctly starts with knowing what each line means. This quick reference lists the common line types, their weight and pattern, and how they are used. It is useful for new engineers, for supplier onboarding and for standardising drawing templates across a team.

Download:
Line typeWeightPatternTypical use
Visible (object) line
Thick
Continuous
Edges and contours of the part that can be seen in the view
Hidden line
Medium or thin
Short evenly spaced dashes
Edges and features behind a surface, only where they clarify the view
Center line
Thin
Long, short, long dash sequence
Axes of holes, cylinders and symmetrical features, and bolt circles
Dimension line
Thin
Continuous with arrowheads or ticks
Shows the extent of a dimension between extension lines
Extension line
Thin
Continuous, small gap at the object
Extends feature edges so a dimension can be placed outside the view
Leader line
Thin
Continuous with arrowhead
Points from a note, callout or symbol to the feature it describes
Cutting-plane line
Thick
Long dash with two short dashes, or evenly spaced dashes
Shows where a section view is taken, with arrows for viewing direction
Section line (cross-hatching)
Thin
Continuous parallel lines, usually at 45 degrees
Fills the cut surface in a section view, symbols can show material
Short break line
Thick
Freehand wavy line
Shows a short break in a long part to save drawing space
Long break line
Thin
Ruled line with freehand zigzags
Shows a long break on parts of constant cross section
Phantom line
Thin
Long dash with two short dashes, repeated
Alternate positions of moving parts, adjacent parts and repeated detail
Stitch line
Thin
Evenly spaced small dashes
Indicates a sewing or stitching path, and sometimes a hidden feature
Chain line
Thick
Long, short, long dash sequence
Indicates a surface or area that has a special requirement such as a treatment zone
Symmetry line
Thin
Center line with two short parallel lines at each end
Shows a view is shown as half of a symmetrical part

Line weights and patterns are summarised from common drafting practice such as ASME Y14.2. Absolute widths depend on your drawing standard and plotting setup. Check your company standard and the standard cited in the contract.

Drawing standard review

Optional review of your drawing template and release rules against how your PLM and ERP carry drawing data.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the table

Search for a line name such as phantom or cutting to jump to its row, or search for a use such as symmetry or section. Export the table to Excel or PDF and attach it to a drafting standard, a CAD training pack or a supplier drawing requirements package. The weight column helps you check that a template has distinct thick and thin line settings.

  • Use thick lines for visible edges, cutting planes and short breaks
  • Use thin lines for dimensions, extension lines, leaders and hatching
  • Add hidden lines only where they improve clarity

Where the conventions come from

Line conventions in US practice are set mainly by ASME Y14.2, with ISO 128 covering the same ground for metric drawings. Both define a small family of line types so that any trained reader interprets a drawing the same way. A common rule of thumb is that a thick line is about twice the width of a thin line. The aim is legibility after reduction, scanning and faxing or low resolution printing, so keep the weight contrast clear.

Common mistakes

Frequent problems include center lines drawn as plain dashes, hidden lines that clutter a view and make features ambiguous, cutting plane lines without direction arrows, and hatching that crosses a dimension without a break for the text. Another common issue is CAD layers where the line weight is set to the same value for everything, which makes the drawing look flat and hard to read after plotting. Review a sample print, not only the screen.

Frequently Asked Questions

What is the difference between a phantom line and a center line?

A center line marks an axis or symmetry and uses a long, short, long pattern. A phantom line uses a long dash followed by two short dashes and shows alternate positions, adjacent parts or repeated detail. They look similar, so check the pattern carefully.

How thick should thick and thin lines be?

Standards give minimum widths and a ratio, commonly thick being about twice thin. Typical values are around 0.6 mm for thick and 0.3 mm for thin, but your company standard or CAD template sets the exact values. Confirm with a test plot.

Should hidden lines always be shown?

No. Practice is to show them only where they make the drawing clearer. Too many hidden lines make a view hard to read, so a section view or an additional view is often a better choice.

Does ISO use the same line types?

ISO 128 defines a similar set with different naming and a defined set of line widths. Most basic types are equivalent, but codes, widths and terminology differ, so follow the standard your drawing cites.

If you manage drawing standards across several plants and want routine release checks tied to your PLM and ERP data, Netray can talk through options.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring