ERP OperationsFree templatePDF, Excel, Word exportManufacturing

Integration Diagram Template: Inbound and Outbound ERP Interfaces

This integration diagram template gives ERP owners a structured way to show every inbound and outbound interface in one document: PLM, EDI, CRM, MES, warehouse, BI and the integration layer between them. Fill in the system names, review the sample interfaces and export a document ready for architecture review.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

ERP Integration Diagram Template: Inbound and Outbound Interfaces

Integration overview

Company: Harlow Metal Products Core system: Infor SyteLine (on-prem) Integration layer: Integration server with REST and file adapters Owner: IT manager Date: 2026-11-01

Direction key: Inbound means data enters Infor SyteLine (on-prem). Outbound means data leaves Infor SyteLine (on-prem).

Context diagram (text)

[ PLM with released BOMs and drawings ] --releases items, BOMs, ECOs--> [ Integration server with REST and file adapters ] --> [ Infor SyteLine (on-prem) ] [ EDI VAN with X12 850, 855, 856, 810 ] --customer orders, ASNs in/out--> [ Integration server with REST and file adapters ] <--> [ Infor SyteLine (on-prem) ] [ CRM and quoting tool ] --quotes, customers--> [ Integration server with REST and file adapters ] --> [ Infor SyteLine (on-prem) ] [ Infor SyteLine (on-prem) ] --work orders, routings--> [ Integration server with REST and file adapters ] --> [ Shop floor data collection terminals ] [ Shop floor data collection terminals ] --labour, quantities, scrap--> [ Integration server with REST and file adapters ] --> [ Infor SyteLine (on-prem) ] [ Barcode warehouse app ] <--pick, receipt, move transactions--> [ Integration server with REST and file adapters ] <--> [ Infor SyteLine (on-prem) ] [ Infor SyteLine (on-prem) ] --read-only extracts--> [ Reporting database and dashboards ]

Inbound interfaces (data into the ERP)

IDSourceMethodDataFrequencyOwnerError handling
IN-01PLM with released BOMs and drawingsREST or fileItem master, BOM, revision, ECOOn releaseEngineeringReject queue with email
IN-02EDI VAN with X12 850, 855, 856, 810EDI X12 850 via VANCustomer purchase ordersEvery 15 minCustomer serviceTranslator error report
IN-03CRM and quoting toolREST APICustomers, quotes, contactsNear real timeSales opsRetry then alert
IN-04Shop floor data collection terminalsAPI or staging tableJob labour, quantity complete, scrapEvery 5 minProductionHold in staging, review
IN-05Barcode warehouse appAPIReceipts, picks, bin movesReal timeWarehouseRetry, reconcile nightly

Outbound interfaces (data out of the ERP)

IDTargetMethodDataFrequencyOwnerError handling
OUT-01EDI VAN with X12 850, 855, 856, 810EDI X12 855, 856, 810Acknowledgements, ship notices, invoicesOn eventCustomer serviceResend from log
OUT-02Shop floor data collection terminalsAPI or fileReleased work orders, routings, BOMOn releasePlanningAlert, manual push
OUT-03Barcode warehouse appAPIPick lists, expected receiptsReal timeWarehouseRetry queue
OUT-04Reporting database and dashboardsRead-only database viewOrders, inventory, WIP, costsNightlyFinance / ITJob failure alert
OUT-05Suppliers via EDI VAN with X12 850, 855, 856, 810EDI X12 850Purchase ordersOn approvalPurchasingResend, confirm by email

Review notes

For every interface record: authentication method, who is paged when it fails, how a failed message is replayed, whether the interface writes to the ERP or only reads, and what happens during ERP upgrades or downtime. Mark any interface that depends on a custom table, a database trigger or a person with specific knowledge as a risk.

Approvals

ERP owner / Date
IT security / Date
Integration lead / Date

The context diagram is rendered as text, so it exports cleanly to Word and PDF. Redraw it in your own diagramming tool if you need boxes and lines. Method names are examples. Replace them with the real adapters, APIs and message formats in your landscape, and add a row for each additional interface.

Review your interface map

An optional session to check an interface map and identify where a private AI layer could read ERP data safely.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the template

Replace each system field with the real product name and deployment, then edit the interface rows. Start with the context diagram to agree the boundaries, then list every interface in the inbound and outbound tables, one row each. Share it with the owners of each system to check method, frequency and error handling. The result becomes your baseline before an upgrade, a migration or any AI project that reads ERP data.

  • One row per interface and per direction
  • Name an owner for each row
  • Record how each failure is detected and replayed

Inbound and outbound, explained

In software and business integration diagrams, inbound means data entering a system and outbound means data leaving it, always from the point of view of the system in the centre. For a manufacturer that is usually the ERP. Inbound examples are customer orders from EDI, released BOMs from PLM and shop floor transactions from MES. Outbound examples are work orders to MES, ship notices and invoices to customers, and extracts to BI. Keeping the viewpoint consistent avoids arguments about which side owns a failed message.

API, EDI, MES and file interfaces

Real plants mix methods. REST and SOAP APIs suit near real-time exchanges. EDI X12 or EDIFACT handles customer and supplier documents such as 850 orders, 855 acknowledgements, 856 ship notices and 810 invoices. MES and shop floor systems often use API calls, staging tables or files. Older interfaces may use flat files or database links. A good diagram labels the method because each has different failure modes, security needs and upgrade impact.

Risks to flag and what to do next

Mark interfaces that rely on custom tables, triggers, undocumented scripts or a single person's knowledge. Check which interfaces write to the ERP and which are read-only. During upgrades, those with direct database access are the first to break. Once the map is complete, use it to plan monitoring, to define test cases and to decide where an AI or analytics layer may safely read data.

Frequently Asked Questions

What is an integration diagram?

It is a picture or document showing how systems exchange data: which systems, which direction, by what method, how often and who owns each link. In an ERP context it covers EDI, APIs, MES, PLM, warehouse and reporting connections.

What is the difference between inbound and outbound interfaces?

Inbound interfaces bring data into the system you are describing. Outbound interfaces send data out of it. Choose one system as the centre, usually the ERP, and keep that viewpoint across the whole diagram.

Do I need a drawing tool as well?

Not to get started. The template creates a text context diagram plus structured interface tables, which are often more useful for reviews. If your organisation wants boxes and arrows, redraw it in a diagramming tool using the tables as the source.

How detailed should each interface row be?

Include source, target, method, data, frequency, owner and error handling at minimum. Add authentication, volumes and replay steps for critical flows. The aim is that someone new can understand how an order or work order moves between systems.

Netray adds a private, read-only AI layer on top of existing ERP interfaces, often on-prem, so teams can ask questions of live data without adding more point-to-point integrations. Use this map to decide what that layer should read.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Integrations

Software