PPAP Process Flow Diagram Template

The process flow diagram is PPAP element 4 and the first document in the quality chain, followed by the PFMEA and control plan. It shows every step from receiving to shipping so reviewers can see where risks and controls sit. This template builds a clean header and operation table you can export.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

PPAP Process Flow Diagram Template

Process Flow Diagram

Supplier: Acme Precision Components Ltd Part number: HSG-48213 Revision: C Part name: Pump housing Customer: Example Automotive Tier 1 Date: 2026-10-20 Prepared by: A. Singh, Process Engineer

Scope

This flow covers the process from: Receiving of aluminium bar stock to: Shipping to customer.

Symbols used: O = operation, I = inspection, S = storage, T = transport, R = rework or repair loop.

Operations

Op no.TypeDescriptionMachine / equipmentCharacteristic or control pointRework loop
10O / IReceive and inspect bar stockDock, certificate reviewMaterial cert, lot IDReject to supplier
20OCNC turnLathe 4Bore diameterRework if oversize allowed
30ODeburrDeburr cellCross hole burrRe-deburr
40O / IWash and dryWash lineResidual particlesRewash
50IFinal inspection and packPack stationLabels, countRe-pack
60TShip to customerDockPacking slipNone

Sub-process and outsourced steps

List any outsourced operation (heat treat, plating, coating) with the sub-supplier name and approval status:

1. 2.

Approvals

Prepared by / Date
Process engineering / Date
Quality manager / Date

Edit the operation table in the exported file to match your actual process. Operation numbers should match the PFMEA and control plan. The format is a generic starting point, not a customer-mandated form.

Want your routing compared to your PPAP flow?

Optional review of ERP routings against PPAP process flow documents.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the template

Fill in the header fields, then adjust the operation table in the exported file for your real steps. Include all value-adding steps, inspections, storage, transport, rework loops and outsourced operations. The flow must cover the whole process, including steps at sub-suppliers that affect the product. Number operations in a way you can keep stable, because the PFMEA and control plan will reference them.

  • Start at receiving and end at shipping
  • Show rework and scrap paths explicitly
  • Include outsourced steps and the sub-supplier
  • Keep operation numbers identical across documents

What reviewers look for

Reviewers check that the flow matches the actual floor, not an idealised version. They compare it against the PFMEA and control plan to see that every operation appears in all three. Missing inspection points, undocumented rework and unlisted outsourced processing are the usual gaps. A well-drawn flow also shows material handling steps where mix-up or damage can occur.

Reading the sample flow

The sample shows a machined housing: receive and inspect bar stock, turn, deburr, wash, inspect and pack, then ship. Each row has a type code and a characteristic or control point so the risk steps can be traced into the PFMEA. Rework loops are listed so the reader knows which operations can send product back. Replace the sample rows with your own routing.

Common mistakes and ERP notes

The usual mistakes are copying the flow from another part number, leaving out the rework loop, and forgetting outsourced steps. If your ERP routing is accurate, use it as the starting point and keep operation numbers aligned. A mismatch between routing and flow diagram often reveals undocumented work centres or steps that operators perform off-system.

Frequently Asked Questions

Does the flow have to be a picture?

No. PPAP requires a process flow diagram, and many customers accept a table or flowchart as long as it shows all steps in sequence. Use the format the customer's specific requirements ask for, which may be a drawn flowchart.

Should I include inspection steps?

Yes. Show inspections, tests and holds, along with operations, so reviewers can see where product is checked. Include rework and scrap paths and mark where product is segregated.

How detailed should operations be?

Detailed enough that each step maps to a PFMEA row and control plan line. Avoid combining unrelated work into one box, but do not describe every motion. The operation level of your routing is usually right.

Can I export to Word?

Yes. Download the template as a Word, PDF or Excel file and replace the sample table rows with your own flow.

If your routing in the ERP is the real source of operation numbers, Netray can help compare it against your PPAP documents with read-only access.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP