Process Flow Diagram Worksheet
A process flow diagram is the starting point for a PFMEA and control plan: it lists every step from receiving to shipping. This worksheet captures the same information as a table, adds cycle and wait times, and exports to Excel so you can feed the rest of your APQP package.
| Op no. | Operation description | Step type | Machine / equipment | Input / material | Output / product characteristic | Special characteristic | Cycle time (s) | Wait / queue (min) | Cycle (min) | |
|---|---|---|---|---|---|---|---|---|---|---|
2 | ||||||||||
1.5833 | ||||||||||
0.6667 | ||||||||||
1 | ||||||||||
2.5 |
Number steps to match the routing and PFMEA operation numbers. Mark special characteristics so they flow to the control plan. Cycle times are per piece in this sheet.
Compare floor flow with ERP routings
Optional: ask for a read-only comparison of your process steps and ERP routings.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
List each step in the order the product moves, including inspections, transport, waiting and rework loops. Classify each step, name the machine, the input and the product characteristic created. Mark special characteristics so they carry into the PFMEA and control plan. Enter cycle time per piece in seconds and the typical wait before the step in minutes. The summary shows total touch time, rough lead time and the share of time the product is being worked.
- Include rework and scrap paths, not only the ideal flow
- Use the same operation numbers as your routing
- Show outsourced steps such as heat treatment or plating
- Record the characteristic produced at each step
Why the flow comes first
A PFMEA rates failure modes for each process step, so an incomplete flow means missing risks. Teams that start the PFMEA from memory usually forget transport damage, storage conditions or rework operations. Customers reviewing a PPAP package also expect the flow, PFMEA and control plan to match step for step. Build and walk the flow on the shop floor before the workshop, with an operator present.
Reading the result
The touch time share shows how much of the lead time is value-adding work and how much is waiting. Low percentages point to queue and batching problems rather than machine speed. Look at the steps with the longest waits, the special characteristics and any step with many incoming inputs, because these often hide the biggest risks. Use the numbers as a rough map, not a replacement for a proper time study.
Common mistakes and ERP links
Frequent errors are drawing the intended flow instead of the actual one, merging many operations into one box, and not revising the flow after a change. Compare the worksheet with the ERP routing: any step on the floor that is not in the routing is a data gap, and any routing step that nobody performs is clutter. Keep revision control so the PFMEA and control plan always reference the current flow.
Frequently Asked Questions
Is a process flow diagram required for PPAP?
Yes. A process flow diagram is one of the standard PPAP elements, and customers expect it to match the PFMEA and control plan. It can be a drawn diagram or a clear tabular flow like this worksheet.
Should I include inspection steps?
Yes. Inspections, tests, transport, storage and rework loops are part of the process and each can introduce or catch defects, so they belong in the flow and the PFMEA.
What symbols should I use?
There is no mandatory set. Many teams use operation, inspection, transport, delay and storage symbols. This worksheet records the same idea in the step type column.
Can I draw the diagram from this table?
Export to Excel or PDF and use the rows to build a visual flow in your diagram tool. The table keeps the data consistent while the picture is a presentation.
If you want to compare shop-floor flow against ERP routings automatically, Netray can discuss a read-only review. This worksheet works on its own.
Related Tools
PFMEA Worksheet with RPN (Excel Export)
Fill a process FMEA row by row. RPN is calculated from S, O and D and the worst risk is summarised for you.
Quality & InspectionControl Plan Template (PDF/Word)
Fill the header fields and get a formatted control plan with process rows, methods and reaction plan.
Quality & InspectionFMEA Review Checklist
Check a DFMEA or PFMEA for scope, failure logic, ratings consistency, actions and links to the control plan.
Quality & InspectionQuality Risk Register Template (Excel Export)
A scored risk register with likelihood, impact, owner, mitigation and status for ISO 9001 risk-based thinking.
More Quality & Inspection tools
See all- SAP QM Process Capability Cp Cpk Calculator
- SAP QM Lot Rejection Rate, PPM and Sigma Level Calculator
- SAP QM Gauge R&R Study Calculator
- SAP QM Cp and Cpk Capability Calculator
- Job Shop Material Certification Log Worksheet
- Job Shop First Piece Inspection Sign-Off Template
- Job Shop Scrap and Rework Cost Calculator
- Master Data Audit Sample Size Calculator
- Data Quality Sigma Level Calculator
Keep exploring
Free tools
- PPAP Process Flow Diagram TemplateFill in a header and an operation table that documents the production flow from receiving to shipping, ready to export.
- SIPOC Diagram TemplateFill-in SIPOC document with suppliers, inputs, process steps, outputs, customers and requirements. Exports to PDF, Word or Excel.
- ERP Integration Diagram Template: Inbound and Outbound InterfacesFill in your ERP and connected systems to generate an integration map with inbound and outbound interface tables, flow notes and an owner register.