Fire Extinguisher Selection by Hazard: Class A, B, C, D and K Lookup

This table connects real plant hazards to the extinguisher class and agent that suits them, and lists what to avoid. It is meant for walk-through audits, fire warden training and checking that the extinguishers in a department match what is actually stored there.

Download:
Hazard or locationFire classSuitable agentAvoidNote
Paper, cardboard, packaging
A
Water, ABC dry chemical, foam
None specific
Typical warehouse and packing area
Wood pallets and dunnage
A
Water, ABC dry chemical
None specific
Check for deep-seated embers after knock-down
Textiles, rags, wipers
A
Water, ABC dry chemical
None specific
Oily rags may self-heat, use closed metal bins
Diesel, fuel oil, hydraulic oil
B
ABC or BC dry chemical, CO2, foam
Straight water stream
Water can spread the burning liquid
Paint, solvents, thinners
B
BC or ABC dry chemical, CO2, foam
Straight water stream
Paint booths often have fixed suppression too
Cutting oil and machine tool coolant mist
B
ABC dry chemical, CO2
Straight water stream
Many CNC machines fit an internal suppression system
Flammable gas leak (propane, acetylene)
B
Shut off supply first, then dry chemical
Extinguishing without isolating the gas
A burning gas leak can re-ignite explosively
Electrical panels and switchgear
C
CO2, clean agent, ABC or BC dry chemical
Water, foam
De-energize if safe, dry chemical can foul contacts
Server room and control room electronics
C
CO2 or clean agent (halocarbon)
Water, dry chemical powder
Clean agents leave no residue
Motors, transformers, VFD cabinets
C
CO2, clean agent, dry chemical
Water
Oil-filled transformers are also a class B hazard
Forklift charging area (lead acid)
A, B, C
ABC dry chemical, CO2
Water on live chargers
Check ventilation and eyewash too
Magnesium chips and swarf
D
Class D dry powder, dry sand
Water, CO2, ABC dry chemical
Magnesium burns violently with water
Titanium chips and turnings
D
Class D dry powder
Water, CO2, ABC dry chemical
Keep fine chips separated from coolant
Aluminum powder and fine dust
D
Class D dry powder
Water, CO2
Dust explosion risk, see NFPA 484 and 652
Sodium, potassium, lithium metal
D
Class D agent specified by the maker
Water, CO2
Check the SDS for the specified powder
Deep fat fryer and canteen kitchen
K
Wet chemical
Water, ABC dry chemical alone
Hood suppression system is usually required
Lithium-ion battery packs
A (cells), C (electrical)
Large volumes of water or water mist as per the maker guidance
Relying on a small extinguisher
Extinguisher ratings do not cover thermal runaway
Welding and hot work area
A, B
ABC dry chemical, water can near work
None specific
Hot work permit and fire watch also apply
Spray paint booth
B
Fixed dry chemical or CO2 system, BC portable
Water
Overspray residue is a fire load

General guidance only. Extinguisher selection, quantity, spacing and inspection must follow your local fire code, NFPA 10 or equivalent national standard, and the insurer's survey. Letter K is a US class, the equivalent cooking oil class is F in the UK, EU and Australia.

Inspection due dates inside your ERP

Optional: we can outline how extinguisher and safety equipment inspections can be scheduled from your ERP or EAM.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it on a floor walk

Walk a department, list the materials and equipment, and search for each one. Note the class letters that appear. Then compare against the extinguisher labels on the wall: the letter and the agent must match the hazard. Record gaps such as a water extinguisher near a switchgear room or no class D powder in a machining cell that cuts titanium. Export the table to Excel to attach it to your inspection record.

What the classes mean

Class A covers ordinary combustibles. Class B covers flammable liquids and gases. Class C is energized electrical equipment, and the class label really means the agent is non-conductive. Class D is combustible metals and needs a special powder. Class K (US) or F (UK, EU, Australia) covers cooking oils and fats. Multipurpose ABC dry chemical extinguishers cover A, B and C but are wrong for metal fires and kitchens.

  • Water: class A only, never on B, C or D
  • CO2: B and C, no residue, limited reach and little cooling
  • ABC dry chemical: A, B and C, corrosive residue on electronics
  • Class D powder: metals only, specific to the metal
  • Wet chemical: kitchen fat fires

Mistakes to avoid

Do not assume one extinguisher type fits the whole plant. A common finding is only ABC units in a machining area with magnesium or titanium. Another is blocked or unmounted units, or units past their monthly check. Training matters too: untrained staff should evacuate and raise the alarm. Under OSHA 29 CFR 1910.157 an employer that expects employees to use extinguishers must provide training at hire and annually.

Frequently Asked Questions

Can I use an ABC extinguisher on an electrical fire?

Yes, ABC dry chemical is rated for class C. The powder is corrosive and can damage electronics and contacts, so for server rooms and sensitive equipment CO2 or a clean agent is the better choice.

What extinguisher is right for metal shavings?

A class D dry powder extinguisher suited to the metal, or dry sand where allowed. Water, CO2 and ABC dry chemical can make metal fires worse. Check the safety data sheet and the powder maker's listing.

Do extinguishers work on lithium-ion battery fires?

Not reliably. Small extinguishers may knock down flames but cannot stop thermal runaway. Guidance from most makers is to cool with large amounts of water or water mist and to evacuate. Follow your site risk assessment.

How often must extinguishers be inspected?

Under NFPA 10 and OSHA 1910.157 portable extinguishers get a monthly visual check, an annual maintenance check with a tag, and periodic hydrostatic testing at intervals set by the type. Confirm the details with your local code.

If you want hazard, location and inspection due dates linked to assets in your maintenance system, we can help set that up as part of an ERP or EAM project.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP