Safety & WorkforceFree referencePDF, Excel, Word exportManufacturing

GHS Hazard Class, Pictogram and Signal Word Reference Table

This table maps each GHS hazard class and category to its pictogram code and signal word. Use it to check a supplier label against an SDS, build training material, or classify rows in a chemical inventory.

Download:
Hazard classCategoryPictogramSymbolSignal wordNote
Explosives
Division 1.1 to 1.3
GHS01
Exploding bomb
Danger
Mass explosion, projection or fire hazards
Explosives
Division 1.4
GHS01
Exploding bomb
Warning
Minor explosion hazard
Flammable gases
1
GHS02
Flame
Danger
Extremely flammable gas
Flammable liquids
1 and 2
GHS02
Flame
Danger
Flash point below 23 C
Flammable liquids
3
GHS02
Flame
Warning
Flash point 23 C to 60 C
Flammable liquids
4
None
None
Warning
Combustible liquid, no pictogram under GHS
Flammable solids
1
GHS02
Flame
Danger
Flammable solids
2
GHS02
Flame
Warning
Pyrophoric liquids
1
GHS02
Flame
Danger
Ignites spontaneously in air
Substances that emit flammable gas with water
1 and 2
GHS02
Flame
Danger
Water reactive
Oxidizing liquids and solids
1 and 2
GHS03
Flame over circle
Danger
Oxidizing liquids and solids
3
GHS03
Flame over circle
Warning
Oxidizing gases
1
GHS03
Flame over circle
Danger
Gases under pressure
Compressed, liquefied, dissolved
GHS04
Gas cylinder
Warning
May explode if heated
Gases under pressure
Refrigerated liquefied
GHS04
Gas cylinder
Warning
May cause cryogenic burns
Corrosive to metals
1
GHS05
Corrosion
Warning
Skin corrosion or burns
1A, 1B, 1C
GHS05
Corrosion
Danger
Serious eye damage
1
GHS05
Corrosion
Danger
Acute toxicity, oral, dermal, inhalation
1, 2 and 3
GHS06
Skull and crossbones
Danger
Fatal or toxic
Acute toxicity, oral, dermal, inhalation
4
GHS07
Exclamation mark
Warning
Harmful
Skin irritation
2
GHS07
Exclamation mark
Warning
Eye irritation
2A
GHS07
Exclamation mark
Warning
Skin sensitization
1, 1A, 1B
GHS07
Exclamation mark
Warning
Respiratory sensitization
1, 1A, 1B
GHS08
Health hazard
Danger
Germ cell mutagenicity
1A, 1B
GHS08
Health hazard
Danger
Carcinogenicity
1A, 1B
GHS08
Health hazard
Danger
Carcinogenicity
2
GHS08
Health hazard
Warning
Suspected carcinogen
Reproductive toxicity
1A, 1B
GHS08
Health hazard
Danger
Reproductive toxicity
2
GHS08
Health hazard
Warning
Specific target organ toxicity, single exposure
1
GHS08
Health hazard
Danger
Specific target organ toxicity, single exposure
2
GHS08
Health hazard
Warning
Specific target organ toxicity, single exposure
3
GHS07
Exclamation mark
Warning
Respiratory irritation or narcotic effects
Specific target organ toxicity, repeated exposure
1
GHS08
Health hazard
Danger
Specific target organ toxicity, repeated exposure
2
GHS08
Health hazard
Warning
Aspiration hazard
1
GHS08
Health hazard
Danger
Hazardous to the aquatic environment, acute
1
GHS09
Environment
Warning
Not enforced by OSHA HazCom, but used in other regimes

Summary of the common GHS scheme for quick checks. Always confirm against the current SDS Section 2 and your regulator's version (OSHA 29 CFR 1910.1200, EU CLP, and others differ in adopted categories).

Hazard data on your ERP item master

Optional: we can review how chemical and hazard attributes are held in your ERP and suggest a cleaner structure.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the table

Type a hazard class, a pictogram code such as GHS06, or a signal word into the search box to filter the rows. Compare the result to Section 2 of the safety data sheet and to the label on the container. If the label shows a different pictogram than this table suggests, check whether the product carries several hazard classes, because one pictogram can cover more than one class and a higher-priority symbol can replace a lower one.

The rules behind pictograms and signal words

GHS uses nine pictograms. The signal word is Danger for the more severe categories and Warning for the less severe, and a label carries only one signal word. Precedence rules reduce clutter: for example the skull and crossbones replaces the exclamation mark for acute toxicity, and the corrosion symbol replaces the exclamation mark for skin and eye irritation. The environmental pictogram is not mandatory under OSHA HazCom.

  • Danger always outranks Warning on a single label
  • Skull and crossbones takes precedence over exclamation mark
  • Corrosion takes precedence over exclamation mark for skin or eye effects
  • Health hazard (GHS08) is for chronic and systemic effects, not acute poisoning
  • Category 4 flammable liquids carry a signal word but no pictogram

Common mistakes

The most frequent error is treating the exclamation mark as a catch-all and leaving out the health hazard symbol on carcinogens or sensitizers. Another is relying on an old NFPA diamond or HMIS rating in place of GHS labels on shipped containers. Those workplace systems can still be used internally but do not replace the supplier label. Finally, check that secondary containers are labeled with at least the product identifier and the hazard words or pictograms.

Frequently Asked Questions

Which pictogram does OSHA require?

OSHA HazCom 2012 requires pictograms for eight of the nine symbols. The environmental pictogram (GHS09) is allowed but not mandatory. Each label must also show the product identifier, signal word, hazard statements, precautionary statements and supplier details.

Can a product have both Danger and Warning?

No. If any hazard class in the product warrants Danger, the label shows Danger only. Warning appears only when every applicable category is at the lower severity level.

Does GHS replace NFPA 704 diamonds?

No. NFPA 704 is a fire and emergency response marking for buildings and storage areas. GHS labels are for containers. Many sites use both, and they have different scales and purposes.

Is this table a legal classification?

No. It is a quick reference. Classification of a mixture depends on test data and cut-off values, and the supplier's SDS is the authoritative source for the product you have.

If your chemical inventory sits in an ERP item master, we can help you carry hazard class and pictogram data onto item records so it is searchable next to stock and purchasing.