Safety Sign Colors, Signal Words and Pipe Marking Color Reference
Use this reference to check that the signs, color codes and pipe labels in your plant mean what workers expect. It lists the ANSI Z535 signal words, the OSHA safety colors and the common ASME A13.1 pipe marking colors in one searchable table.
| System | Header or fluid | Color | Meaning | Typical plant use |
|---|---|---|---|---|
ANSI Z535 sign header | DANGER | Red | Hazard that will result in death or serious injury if not avoided | High voltage, open hazards without guards |
ANSI Z535 sign header | WARNING | Orange | Hazard that could result in death or serious injury | Moving parts, pinch points, hot surfaces |
ANSI Z535 sign header | CAUTION | Yellow | Hazard that could result in minor or moderate injury | Wet floor, uneven surfaces |
ANSI Z535 sign header | NOTICE | Blue | Information not related to personal injury, such as property damage or policy | Keep gate closed, restricted area policy |
ANSI Z535 sign header | SAFETY INSTRUCTIONS | Green | General safety procedures and equipment locations | First aid, eyewash, emergency shower, safety equipment |
ANSI Z535 sign header | Fire safety | Red | Fire equipment location and fire related instructions | Extinguisher, fire alarm pull station, hose cabinet |
OSHA 1910.144 safety color | Red | Red | Fire protection equipment, danger, emergency stop devices | Emergency stop buttons, fire extinguisher stations, safety cans for flammables |
OSHA 1910.144 safety color | Yellow | Yellow | Caution and physical hazards | Striking against, stumbling, falling, tripping, caught in between |
OSHA 1910.144 safety color | Orange | Orange | Dangerous parts of machines or energized equipment | Inside of guards and enclosure doors, exposed gears and cutters |
OSHA 1910.144 safety color | Blue | Blue | Caution limited to warning against starting or use of equipment under repair | Blue tag at control point of equipment being serviced |
OSHA 1910.144 safety color | Green | Green | Safety and first aid equipment location | First aid kit, eyewash, safety exit signs in some regions |
OSHA 1910.144 safety color | Purple (magenta) on yellow | Purple and yellow | Radiation hazard | Radiography area, X-ray cabinets, radiation sources |
OSHA 1910.144 safety color | Black and white | Black, white | Traffic and housekeeping markings | Aisle borders, waste container markings |
ASME A13.1 pipe marking | Water (potable, cooling, boiler feed) | Green | Water service | Cooling water loops, process water |
ASME A13.1 pipe marking | Fire quenching fluids | Red | Fire protection service | Sprinkler mains, standpipes, fire water |
ASME A13.1 pipe marking | Compressed air | Blue | Compressed air service | Plant air headers and drops |
ASME A13.1 pipe marking | Combustible fluids | Brown | Combustible but not flammable fluids | Fuel oil, hydraulic fluid, lubricants |
ASME A13.1 pipe marking | Flammable or oxidizing fluids | Yellow | Flammable or oxidizing service | Natural gas, solvents, oxygen |
ASME A13.1 pipe marking | Toxic and corrosive fluids | Orange | Toxic or corrosive service | Acids, caustics, plating line chemicals |
Facility floor marking (common practice) | Aisles and walkways | Yellow or white | Traffic lanes and walking routes | Forklift aisles, pedestrian walkways |
Facility floor marking (common practice) | Hazard area stripes | Red and white or black and yellow | Do not block or caution zone | Fire equipment clearance, electrical panel clearance |
Sign headers follow ANSI Z535.2 and OSHA 1910.145 practice, safety colors follow OSHA 1910.144, and pipe colors follow ASME A13.1 guidance. Floor marking colors vary by site standard. Verify against the edition your site has adopted.
Signage and inspection records in one system
Optional: a short chat on how safety inspections can be tied to locations and work orders in your ERP.
Optional. The tool and every export work without this. No spam.
How to use the table
Search by color, header word or fluid. When auditing signs, walk an area with the list and check that the header word matches the severity of the hazard, for instance that a Danger header is not used where the risk is only minor injury. For pipes, compare the band color and the legend to the fluid in the line. Export the rows to Excel and add columns for location and corrective action.
Signal words and severity
ANSI Z535 ties each header to a level of risk. Danger means the hazard will cause death or serious injury if not avoided. Warning means it could. Caution means minor or moderate injury. Notice is for non-injury matters. Overusing Danger weakens it, because workers learn to ignore signs they see everywhere. Pick the header from a risk assessment, not from habit.
- Danger: red, imminent, severe
- Warning: orange, possible, severe
- Caution: yellow, possible, minor or moderate
- Notice: blue, no personal injury
- Safety instructions: green, how and where
Common problems found in audits
Mixed old and new signs on the same machine, text-only signs for a mixed-language workforce, pipe markers hidden behind insulation or missing flow arrows, and floor markings worn out where forklifts cross. Consider pictograms and the languages your workers read. Keep a list of sign locations and replace faded signs on a schedule.
Frequently Asked Questions
What is the difference between a Danger and a Warning sign?
Danger signals a hazard that will cause death or serious injury if not avoided, and uses a red header. Warning signals a hazard that could cause death or serious injury, and uses an orange header. Caution is for minor or moderate injury.
Are pipe marking colors mandatory?
ASME A13.1 is a consensus standard. OSHA references it as accepted practice in some places and many insurers and local codes expect it. Sites often adopt it formally in their own standards for consistency.
What does a blue tag mean?
Under OSHA safety color practice, blue marks caution against starting or using equipment under repair. Many plants use blue tags for out-of-service equipment. Lockout tagout tags are a separate control with their own rules.
Does this replace the standards?
No. It is a summary for quick checks. Use the current edition of ANSI Z535, OSHA 1910.144 and 1910.145, and ASME A13.1 for final design of signs and markings.
If you track signage, inspection dates or corrective actions in your ERP or maintenance system, we can show how to connect them to locations and work orders.
Related Tools
GHS Hazard Class, Pictogram and Signal Word Reference
Look up which GHS pictogram and signal word go with each hazard class and category, then export the table for training or SDS review.
Safety & WorkforceFire Extinguisher Selection by Hazard Reference
Find the right extinguisher class and agent for common factory hazards, and the agent to avoid.
Safety & WorkforceMachine Guarding Inspection Checklist
Inspect guards, interlocks, emergency stops and operator access on machines, and record which findings need immediate action.
Safety & WorkforceLOTO Lockout Tagout Periodic Inspection Checklist
A checklist for annual lockout tagout reviews that covers procedures, devices, training, group lockout, contractors and records.
More Safety & Workforce tools
See all- Hazard Identification and Risk Ranking Worksheet
- Plant HR and Labor KPI Definitions Reference
- Shift Work Fatigue Risk Assessment
- New Operator First Week Onboarding Checklist
- Production Supervisor Capability Self-Assessment
- Toolbox Talk Record Template
- Confined Space Entry Permit Template
- Hot Work Permit Template
- Emergency Action Plan Template
Keep exploring
Free tools
- Resistor Color Code CalculatorSelect the colors of a 4 or 5 band through-hole resistor and get its value in ohms, kilohms, tolerance and acceptable min and max range.
- Fiber Optic Color Code Reference (TIA-598)Searchable chart of the 12-color fiber sequence, positions 13 to 24, and the usual jacket colors by fiber type.
- ABAP ALV Layout, Field Catalog and Color Codes ReferenceSide by side: how to do checkbox, hotspot, colors, subtotals, toolbar buttons, top of page and refresh in CL_GUI_ALV_GRID and in CL_SALV_TABLE, plus the C1 to C7 color codes.
ERP fixes and how-tos
- Conditional Formatting in Infor LN: Grid and Field ColorsCan you color rows or fields by value in Infor LN Web UI grids? What personalization covers, what needs customization, and reporting alternatives.
- Infor OS Add-In for Microsoft Excel: Install, Sign In and UseHow to install and use the Infor add-in for Microsoft Excel with Infor OS to read ERP data into a worksheet, what you need first and when to use other methods.
- How to Enter Time in Deltek Costpoint (Timesheet Steps and Corrections)Step-by-step Deltek Costpoint timesheet entry: choose the period, add charge lines, enter hours, save, sign and submit, plus how corrections work.
Guides
- How to Configure Safety Stock Parameters in Infor SyteLineStep-by-step guide to configuring safety stock parameters in Infor SyteLine. Learn how to set reorder points, buffer quantities, and demand-driven safety stock calculations.
- SyteLine Safety Stock Calculation Methods and Setup GuideConfigure safety stock calculations in Infor SyteLine using statistical methods, service level targets, and demand variability for optimal buffer inventory.
- Infor M3 Fashion Edition: Style-Color-Size Matrix, PLM Integration, and Seasonal PlanningConfigure Infor M3 for fashion and apparel. Style-color-size matrix, PLM integration, seasonal planning, and garment costing in M3 Fashion edition.
AI on your ERP
- Infor M3 AI for Fashion and Apparel: Seasons, Sizes and AllocationPrivate AI on Infor M3 for fashion and apparel: style-color-size matrix, season planning, allocation, returns and supplier PO tracking, on-prem or private cloud.
- AI on Your ERP for Textile and Apparel ManufacturingPrivate AI on your ERP for textile and apparel makers: style-color-size matrices, lot dyeing, cut plans, TNA calendars and buyer compliance, kept on your own systems.
Integrations
- How to add Microsoft Teams to Infor SyteLineAdd Microsoft Teams to Infor SyteLine: adaptive card approvals, shortage and quality alerts, Entra ID sign-in, and ION or IDO REST wiring for CloudSuite Industrial.
- How to add Microsoft Teams to SYSPROConnect Microsoft Teams to SYSPRO with adaptive cards, bots and workflows for approvals and alerts, using e.net business objects, SQL Server and Entra ID sign-in.