First Piece Inspection Template for Setup Approval
First piece inspection stops a run of scrap before it starts. After setup, a tool change or a restart, the first part is checked against the drawing and the operator does not run production until it is approved.
Fill in
First Piece Inspection Template
First Piece Inspection Record
Company: Acme Precision Ltd Date and time: 2026-10-20 07:45 Job or work order: WO-118204 Part number / revision: SHF-2207 / B Operation: OP 20 CNC turning Machine: Lathe 04 Operator: S. Okafor
Reason for inspection
New job setup
Characteristics
| Char # | Description | Nominal | Tolerance | Actual | Pass / Fail |
|---|---|---|---|---|---|
| 1 | |||||
| 2 | |||||
| 3 | |||||
| 4 | |||||
| 5 | |||||
| 6 |
Setup verification
| Check | Yes | No | N/A |
|---|---|---|---|
| Correct drawing revision at the machine | |||
| Program and tool list match the routing | |||
| Material lot and certificate verified | |||
| Gages are in calibration | |||
| Surface finish and appearance checked |
Gages and result
Gages used: MIC-112, CAL-044, SRT-009 Overall result: Approved to run
Comments: Diameter on feature 3 at upper tolerance. Tool offset reduced by 0.005 mm and second piece measured to confirm.
Release
Use this for in-process setup approval of the first part of a run. It is not an AS9102 first article inspection report; use a first article form when a customer or the AS9100 process requires FAI documentation.
Gate production reporting on first piece approval
Optional: we can review how your ERP or MES could require an approved first piece before quantities are reported.
Optional. The tool and every export work without this. No spam.
How to use the template
Enter the job, part, revision, operation and machine in the fields, choose the reason for the first piece and export the document. Then list the characteristics to be checked, with nominal, tolerance and actual values, and mark each pass or fail. Complete the setup verification table before signing. The operator, inspector and supervisor sign when the part is approved. If a characteristic fails, record the correction, such as a tool offset, and measure a second piece before releasing the machine.
- Check every characteristic that the setup can influence, not only the one adjusted.
- Measure with calibrated gages and list the IDs.
- Keep the approved piece at the machine as a reference until the run ends.
When to do a first piece check
Common triggers are a new job setup, a tool change, a program or offset change, a change of material lot, a machine restart after downtime or a shift change. Many plants write these triggers into the control plan. Frequency and characteristics should follow the process risk: a high precision turned part may need first piece plus periodic checks, while a simple stamping may only need first off after die setup.
First piece versus first article
First piece inspection is an internal setup approval for every run. First article inspection under AS9102 is a documented verification of a new part number, a design change or a process change, with ballooned drawings and specified forms. A first piece check is quick and repeated often. An FAI is formal, retained as a customer record and done infrequently. Do not use this template as a substitute when a customer requires an FAI report.
Common mistakes
Frequent problems are checking only the easy dimensions, using the previous job's drawing revision, and letting the operator measure and approve their own first part without an independent check where the control plan requires one. Another is approving the part but not recording the offset changes, so the next shift repeats the same adjustment. Always record corrections and the verification piece.
Frequently Asked Questions
Who should approve a first piece?
Your control plan or quality procedure decides. Often a quality inspector or a trained setup person other than the operator approves, and the supervisor signs to release the machine. Independent verification is important for critical characteristics.
How many characteristics must be checked?
All characteristics that the setup, tool or program can affect, plus any key or critical characteristics on the drawing or control plan. Checking only one dimension misses setup errors elsewhere on the part. The inspection plan should list them for each operation.
What happens if the first piece fails?
Stop, correct the cause, such as an offset or fixture issue, and make another piece. Measure it and approve before running. Record the failed result and the correction so the next setup can learn from it. Quarantine any pieces made before the check.
Is first piece inspection the same as first article inspection?
No. First piece is a routine setup approval for each run. First article inspection, defined in AS9102 for aerospace, is a formal documented check of a new or changed part or process. A first piece check does not satisfy an FAI requirement.
If your MES or ERP creates shop orders and operations, we can discuss how a first piece check could be forced as a gate before production quantity is reported.
Related Tools
In-Process Inspection Log Worksheet
An editable log for periodic in-process checks with pieces checked, defects, automatic defect rate and pass or fail status.
Quality & InspectionFinal Inspection Checklist
A pre-shipment checklist covering records, measurements, function, appearance, labeling, packing and release authorization.
Aerospace & DefenseFirst Article Inspection (AS9102) Checklist
A 30-point checklist for complete, first-pass-acceptable AS9102 FAIs - planning, Form 1/2/3 completeness, characteristic accountability, and the delta FAI triggers teams miss.
Quality & InspectionJob Shop First Piece Inspection Sign-Off Template
A simple first piece sign-off sheet for the traveler: measured values against requirements, gauges used and approval to run the lot.
More Quality & Inspection tools
See all- A3 Problem Solving Report Template
- Rolled Throughput Yield Calculator
- A3 Problem Solving Template
- Rolled Throughput Yield Calculator
- Cpk Confidence Interval and Sample Size Calculator
- X-bar and S Control Chart Limits Calculator
- Individuals and Moving Range (I-MR) Chart Limits Calculator
- Expected PPM Out of Specification Calculator
- Taguchi Loss Function Calculator
Keep exploring
Free tools
- CNC First Piece Inspection Record TemplateA fill-in first piece inspection record for CNC jobs: dimensions, tolerances, gauges, results and approvals, exportable to PDF, Word or Excel.
- Job Shop First Piece Inspection Sign-Off TemplateA simple first piece sign-off sheet for the traveler: measured values against requirements, gauges used and approval to run the lot.
- Press Brake Setup and First Piece Inspection ChecklistA shop floor checklist for press brake job setup, first piece verification and release to production.
ERP fixes and how-tos
- What Is First Article Inspection in SAP, and How to Run It in QMFirst article inspection in SAP means inspecting the first piece of a production run through QM. Learn the inspection type, lot trigger and results recording.
- How to Populate AS9102 First Article Inspection Forms From ERP DataWhich AS9102 Form 1, 2 and 3 fields can come from the ERP, how to trigger a new or partial FAI from engineering changes and routing changes, and what stays manual.
- How to release (and cancel) an inspection lot in SAP QMRelease an inspection lot in SAP QM with QA02, understand CRTD and REL status, and learn when cancelling a lot is blocked and what to reverse first.
Guides
- SyteLine First Article Inspection (FAI) Process ConfigurationConfigure SyteLine first article inspection for new part qualification. Set up FAI plans, measurement recording, and AS9102 compliance reporting in CloudSuite Industrial.
- First Article Inspection in a CNC Machine Shop: Process, Paperwork and Time SaversFirst article inspection for CNC machine shops: ballooning drawings, AS9102 forms, CMM programming, when FAI is required and how to cut the paperwork time.
- How to Set Up AS9100 Compliance in SyteLineComprehensive guide to configuring Infor SyteLine for AS9100 aerospace quality management compliance. Set up first article inspection, special processes, key characteristics, and traceability requirements.