FMEA Recommended Action Closure Report Template
An FMEA action is not finished when the work is done; it is finished when the evidence supports the new ratings. This template records that evidence in one page.
Fill in
FMEA Recommended Action Closure Report Template
FMEA Recommended Action Closure Report
Company: Acme Precision Ltd FMEA: PFMEA-0457 Rev C Part or process: Housing 48213, Op 40 bore finishing Completion date: 2026-10-20 Status: Closed
Failure mode and cause
Failure mode: Bore diameter oversize Cause addressed: Tool wear not detected between gauge checks
Action taken
Installed in-process air gauge with automatic tool offset and stop on out-of-limit.
Owner: J. Rivera, Process Engineering
Rating change
| Item | Severity / Occurrence / Detection |
|---|---|
| Previous | 8 / 6 / 7 |
| Revised | 8 / 3 / 3 |
Evidence of effectiveness
30-day run of 4,200 parts, Cpk 1.72, no out-of-limit parts shipped. Challenge test: 10 of 10 seeded oversize parts stopped.
Documents updated
| Document | Updated (Y/N) | Revision |
|---|---|---|
| Process flow diagram | ||
| Control plan | ||
| Work instruction | ||
| Gauge or test method | ||
| Training record |
Approvals
A starting point for internal use. Adapt to your quality system and customer requirements. Revised ratings should be entered into the FMEA only after the evidence is reviewed.
FMEA actions inside your ERP
Optional discussion on tracking FMEA actions alongside change and quality records.
Optional. The tool and every export work without this. No spam.
How to use the template
Fill the fields for the FMEA row you are closing: the failure mode, the cause, what was done and who owned it. Enter the previous and revised ratings and describe the evidence that supports them. Choose a status, then export to PDF or Word and attach it to the FMEA record. One report per action keeps the audit trail clear.
What good evidence looks like
Evidence should be measurable and independent of opinion: capability data, a challenge test with seeded defects, trial results or a validation report. State sample size and period. For detection actions, a gauge study or challenge test shows real effectiveness. For prevention actions, data over enough production to show a changed occurrence is more convincing than a design review alone.
- Link to data files or report numbers, not just a summary.
- Record any residual risk the action does not remove.
Closing the loop with other documents
An action usually changes more than the FMEA. The process flow, the control plan, work instructions, gauges and training may all need updating. The table in the template lists them so none are forgotten. Customers working to IATF 16949 and AS9100 expect the FMEA, control plan and operating instructions to stay consistent.
Common mistakes
Closing actions on completion of the task rather than on proof of effect is the most common problem. Others include lowering ratings without data, leaving the control plan unchanged and failing to record who verified the result. Review open actions regularly so they do not age silently.
Frequently Asked Questions
When can I lower an occurrence rating?
When data from the changed process shows reduced frequency, or a proven prevention control addresses the cause. A plan to improve is not enough.
Should severity change?
Rarely. Only if the design or process change alters the effect on the customer or next operation. Controls normally affect occurrence or detection.
Does every action need a report?
Practices differ. Many sites require closure evidence at least for high-severity or high-priority items. Follow your procedure and customer requirements.
Can I attach it to a change order?
Yes. Export to PDF and attach it to the engineering change or corrective action record so the evidence is linked.
Netray can help connect FMEA actions to change orders and quality records in your ERP so closure status is visible without manual chasing.
Related Tools
FMEA RPN Reduction What-If Calculator
Compare the current RPN with the RPN after a proposed action, and sweep the new detection rating to see how much each step of improvement is worth.
Quality & InspectionFMEA Corrective Action ROI Calculator
Turn a recommended action into a business case: avoided failures, annual savings, net benefit, ROI and payback in months.
Quality & InspectionInspection Detection Effectiveness and Escape Rate Calculator
Chain two inspection or test stages, see combined detection effectiveness, defects escaping to the customer, escape ppm and the cost of escapes.
Quality & InspectionZero-Failure Reliability Demonstration Sample Size Calculator
Find the number of units that must survive a test with no failures to claim a reliability level at a chosen confidence, and the total test effort.
More Quality & Inspection tools
See all- A3 Problem Solving Report Template
- Rolled Throughput Yield Calculator
- A3 Problem Solving Template
- Rolled Throughput Yield Calculator
- Cpk Confidence Interval and Sample Size Calculator
- X-bar and S Control Chart Limits Calculator
- Individuals and Moving Range (I-MR) Chart Limits Calculator
- Expected PPM Out of Specification Calculator
- Taguchi Loss Function Calculator
Keep exploring
Free tools
- FMEA Recommended Action Tracking Report TemplateA fill-in report that records one FMEA recommended action with owner, due date, verification evidence, before and after ratings, and sign-off.
- FMEA Recommended Action Closure ChecklistA checklist to confirm an FMEA action is implemented, verified with evidence, re-rated honestly and carried into controls and documents before it is closed.
- FMEA Recommended Actions Tracker WorksheetTrack each FMEA action with owner, due date, status and before-and-after ratings, with RPN and RPN reduction calculated automatically.