Zero-Failure Reliability Demonstration Sample Size Calculator
Validation protocols often say test enough units to show 95 percent reliability at 95 percent confidence. This calculator gives the number, and shows what it costs.
Your numbers
Minimum probability that a unit meets the requirement.
Your results
Valid for pass/fail (binomial) data with zero failures. One failure requires a larger sample from the full binomial relationship.
Required sample size vs reliability target
Sweeps Reliability to demonstrate from 80 to 99.5, holding your other inputs fixed.
Validation traceability
Optional review of lot and test traceability in your ERP for validation evidence.
Optional. The tool and every export work without this. No spam.
How to use the calculator
Enter the reliability you must demonstrate and the confidence level your protocol or customer requires. Add test duration and unit cost to see the total effort. The result is the number of units that must all pass; a single failure invalidates the demonstration and you would need to test more or fix the design. The chart shows how steeply the sample size climbs as the target approaches 100 percent.
The success run theorem
If a unit has reliability R, the probability that n independent units all pass is R to the power n. To claim at least R with confidence C, that probability must be no more than 1 minus C. Solving gives n = ln(1 - C) / ln(R). For 95 percent reliability at 95 percent confidence the answer is 59 units; for 90 at 90 it is 22. Round up, never down.
- Common pairs: 90/90 needs 22, 95/95 needs 59, 99/95 needs 299.
- The test must represent worst case conditions to support the claim.
Using it in risk-based validation
Many quality systems tie sample size to risk: higher severity failure modes get higher reliability and confidence targets. Link the choice to the severity in the FMEA and record the rationale in the validation plan. Where destructive testing is costly, consider stress testing or a model-based approach and justify the departure.
Common mistakes
Using this for variable data wastes samples, since a variable-data tolerance interval needs fewer units. Another error is drawing all units from one lot, which shows only lot-level reliability. Finally, do not pad the sample after seeing a failure; define the plan before testing.
Frequently Asked Questions
Why 59 units for 95/95?
ln(0.05) divided by ln(0.95) is about 58.4, so you must test 59 units with zero failures to claim 95 percent reliability at 95 percent confidence.
What if one unit fails?
The zero-failure plan fails. You need a larger plan that allows one failure, computed from the binomial distribution, or you must fix the cause and retest.
Is this the same as AQL sampling?
No. AQL plans control lot acceptance risk. This demonstrates a reliability claim with a confidence level, typically for validation.
Can I use this for software or services?
Yes for any independent pass/fail trials, such as transactions or cycles, provided each trial is representative and independent.
Netray can help assemble lot and test traceability from your ERP so validation samples are properly representative and documented.
Related Tools
Weibull Reliability and B10 Life Calculator
Enter Weibull shape and scale to get reliability at a mission time, the B-life at a chosen failure percentage and the instantaneous hazard rate.
Quality & InspectionInspection Detection Effectiveness and Escape Rate Calculator
Chain two inspection or test stages, see combined detection effectiveness, defects escaping to the customer, escape ppm and the cost of escapes.
Quality & InspectionFMEA Corrective Action ROI Calculator
Turn a recommended action into a business case: avoided failures, annual savings, net benefit, ROI and payback in months.
Quality & InspectionFMEA RPN Reduction What-If Calculator
Compare the current RPN with the RPN after a proposed action, and sweep the new detection rating to see how much each step of improvement is worth.
More Quality & Inspection tools
See all- SAP QM Process Capability Cp Cpk Calculator
- SAP QM Lot Rejection Rate, PPM and Sigma Level Calculator
- SAP QM Gauge R&R Study Calculator
- SAP QM Cp and Cpk Capability Calculator
- Job Shop Material Certification Log Worksheet
- Job Shop First Piece Inspection Sign-Off Template
- Job Shop Scrap and Rework Cost Calculator
- Master Data Audit Sample Size Calculator
- Data Quality Sigma Level Calculator
Keep exploring
Free tools
- Medical Device Success Run Validation Sample Size CalculatorCalculates the zero-failure sample size needed to claim a reliability at a confidence level, and splits it across your PQ lots.
- Zero Failure Success Run Sample Size CalculatorCompute the zero-failure sample size n = ln(1 - confidence) / ln(reliability) for design validation and PPAP test planning.
- Zero Acceptance Sample Size Calculator (Confidence and Reliability)Success-run sample size for c=0 plans: how many conforming pieces prove a reliability at a given confidence, with inspection time.