A long FMEA sheet is a poor place to track what happened to one action. This template gives each recommended action a one-page record: what risk it addresses, who owns it, what evidence shows it worked, how the ratings changed and which documents were updated.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

FMEA Recommended Action Tracking Report Template

FMEA Recommended Action Report

Company: Acme Precision Ltd FMEA: PFMEA-0412 Rev C Part or process: Housing 48213, Op 40 bore finish FMEA line: Line 17 Report date: 2026-10-20

Risk being addressed

Failure mode: Bore diameter oversize Cause: Insert wear not detected between checks Action type: Prevention

Recommended action

Add tool life counter to the program so the insert changes every 250 parts, and add in-process probe check of the bore every 25 parts.

Owner: J. Rivera, Process Engineer Target date: 2026-11-30 Status: In progress

Verification evidence

Capability study on 50 consecutive parts, Cpk target 1.67. Probe challenged with master rings at both limits.

Ratings before and after

RatingBeforeAfterBasis for change
Severity88Unchanged unless the effect or design changed
Occurrence53Prevention evidence, capability or defect data
Detection63Demonstrated detection capability

Linked documents updated

DocumentUpdated (Y/N)RevisionDate
FMEA
Control plan
Process flow diagram
Work instruction
Gauge or calibration record

Approvals

Action owner / Date
FMEA team leader / Date
Quality manager / Date

Severity is shown as unchanged by default because adding a control does not change the effect of a failure. If severity genuinely changes, record why in the basis column. This is a general format, not a customer-specific or AIAG form.

Generate action reports from your ERP records

Optional: a short review of how change and quality records could be turned into these reports automatically.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the template

Fill one report per FMEA action. Identify the FMEA, revision and line, then copy the failure mode and cause so the report stands alone. Write the action as a specific change with an owner and target date. When the action is complete, add the evidence, enter the new occurrence and detection ratings, record which linked documents were updated and obtain sign-offs. Export to PDF or Word and attach it to the FMEA record or the change file.

What good evidence looks like

Evidence should match the claim. A lower occurrence rating needs prevention evidence, such as a capability study, defect data over a meaningful period or proof that an error-proofing device blocks the failure. A better detection rating needs proof that a control rejects bad parts, for example a challenge test with known nonconforming samples. Photos, change records, revised work instructions and calibration certificates all help. Avoid evidence that only shows the action was started.

  • Capability or defect data for occurrence changes
  • Challenge test results for detection changes
  • Released drawing, work instruction or program revision
  • Training records for the people affected

Keeping the documents aligned

The FMEA, the control plan and the process flow should describe the same process. The table in the report lists the documents to confirm after every closed action. The AIAG and VDA approach expects FMEA results to be documented and communicated, and customer audits often compare the control plan line by line with the FMEA. Where the action touches a customer-approved characteristic, check whether a notification or approval is required before the change goes live.

Frequently Asked Questions

Does this replace the FMEA sheet?

No. It supports the FMEA by recording the detail of one action. The FMEA still holds the failure chains and ratings, and should show the action, its status and the revised ratings once the action is verified.

Why is severity unchanged by default?

Severity describes the effect of the failure if it occurs. Adding a prevention or detection control does not make the effect less serious, so only a design change that removes or reduces the effect justifies a lower severity.

Can I use this for customer-specific forms?

Use it as an internal record. Some customers require their own action format or portal entry, and you should follow those, using this report as supporting evidence.

How many reports do I need?

One per recommended action. For a long FMEA, start with the highest severity and highest action priority lines, and keep the reports with the revision history of the FMEA.

If your actions and engineering changes live in your ERP or QMS, Netray can discuss ways to generate these reports from existing records with read-only access.