Food Safe Temperatures and Cooling Limits Chart (F and C)

When a floor supervisor needs to know the cooling limit or the hot hold minimum, they should not have to open a PDF of the full Food Code. This chart puts the common limits in one searchable table with both Fahrenheit and Celsius.

Download:
Process stepFood or situationLimit (F)Limit (C)Time or conditionTypical basis
Cooking
Poultry, stuffed foods, stuffed pasta
165
74
15 seconds
FDA Food Code
Cooking
Ground beef, pork, other ground meat
155
68
17 seconds (USDA home guidance is 160 F with no hold)
FDA Food Code
Cooking
Whole cuts of beef, pork, veal, lamb, fish
145
63
15 seconds (USDA adds a 3 minute rest for whole cuts)
FDA Food Code, USDA
Cooking
Eggs cooked for hot holding
155
68
17 seconds
FDA Food Code
Cooking
Raw fruits and vegetables cooked for hot holding
135
57
No hold time
FDA Food Code
Hot holding
Cooked TCS food on a line or in a hot box
135 or above
57 or above
Continuous
FDA Food Code
Cold holding
TCS food in a cooler or display
41 or below
5 or below
Continuous
FDA Food Code
Danger zone
Temperature range of fastest bacterial growth
41 to 135
5 to 57
Keep total exposure within 4 hours cumulative
FDA Food Code
Cooling
Cooked food, first stage
135 to 70
57 to 21
Within 2 hours
FDA Food Code
Cooling
Cooked food, second stage
70 to 41
21 to 5
Within 4 more hours (6 hours total)
FDA Food Code
Cooling
Food made from ambient ingredients (for example canned tuna salad)
70 to 41
21 to 5
Within 4 hours
FDA Food Code
Reheating
TCS food reheated for hot holding
165
74
Within 2 hours
FDA Food Code
Receiving
Refrigerated TCS food on delivery
41 or below
5 or below
At receipt (check product, not air)
FDA Food Code
Receiving
Frozen food on delivery
Frozen solid
Frozen solid
No signs of thaw and refreeze
FDA Food Code
Receiving
Live molluscan shellfish
45 ambient air, 50 internal
7 ambient air, 10 internal
At receipt
FDA Food Code, NSSP
Frozen storage
Frozen food storage target
0 or below
-18 or below
Continuous
Common industry practice
Thawing
Refrigerator thaw
41 or below
5 or below
Product stays at or below limit
FDA Food Code

Limits shown are widely published FDA Food Code and USDA values for planning. Your HACCP plan critical limits must be validated for your own product and process, and your regulator or customer may require stricter values.

Digitize your monitoring logs

Optional walkthrough of capturing temperature and time readings in your MES or ERP instead of paper logs.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the chart

Filter by process step to see every limit at cooking, holding, cooling, reheating or receiving. Use it to write critical limits into a HACCP plan, to set alarms on a blast chiller or hot box, and to train new line staff. Export the rows you need to Excel or PDF and attach them to the relevant monitoring log, so the number on the log matches the number in the plan.

  • Always record the probe reading, not the equipment set point
  • Calibrate thermometers against an ice point and boiling point on a schedule
  • Write the time with the temperature, because time is half of every limit

Two-stage cooling explained

The Food Code cooling rule has two clocks. Cooked food must fall from 135 F to 70 F within two hours, and from 70 F to 41 F within four more, for six hours total. The first stage matters most because the 70 to 125 F zone supports the fastest growth of spore formers such as Clostridium perfringens. If the first stage is missed, the food should be reheated to 165 F and cooled again or discarded according to your procedure.

Regulatory limit versus validated limit

These numbers are baselines. For processes such as cook-chill, sous vide or large-mass products, a validated lethality study or a regulator-approved variance may justify different parameters. Retail rules in the Food Code and processing rules for plants under 21 CFR 117 or USDA FSIS differ, so confirm which authority and which customer standard apply to you.

Common mistakes

Measuring surface temperature instead of the thickest part, cooling food in deep full pans, stacking containers in a blast chiller, ignoring the receiving check on frozen goods, and keeping logs that record only passes. A log with no corrective action entries across a year is more often a sign of weak monitoring than of perfect control.

Frequently Asked Questions

What is the temperature danger zone?

In the FDA Food Code it is 41 F to 135 F (5 C to 57 C), the range where pathogens grow fastest in time and temperature control for safety foods. Food should spend as little time there as possible.

How fast must cooked food be cooled?

From 135 F to 70 F within two hours, then from 70 F to 41 F within four additional hours. That is six hours total, and the first two hours are the hard limit.

Is 160 F or 165 F correct for ground meat?

FDA Food Code lists 155 F for 17 seconds for ground meat in retail settings, and USDA consumer guidance is 160 F. Poultry is 165 F. Plants should use the validated critical limit in their own HACCP plan.

Do these limits apply to a manufacturing plant?

They are a common baseline, but plants follow 21 CFR 117 or USDA rules and their validated process. Use the chart for reference and confirm limits against your own process authority and validation study.

Netray can help pull temperature log data and batch records out of your MES or ERP for review. The chart itself is free to use with no sign-up.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

AI on your ERP

Manufacturing hubs

Comparisons

Software