Quality & InspectionFree checklistPDF, Excel, Word exportHeat Treating

Heat Treat Pyrometry (AMS2750) Readiness Checklist

Pyrometry findings are among the most common reasons heat treat shops lose approvals. This checklist walks through furnace classification, calibration, system accuracy tests, temperature uniformity surveys and load records so you can find gaps before a customer or Nadcap audit does.

0%

0 of 35 items complete

9 critical items still open - these are the highest-risk gaps.

Free, optional. Reopen it on any device.
Download checklist:

Furnace classification and instrumentation

Thermocouples and calibration

System accuracy tests and uniformity surveys

Load records and traceability

People and system controls

Mark each item when evidence exists, not when it is believed to exist. Items flagged as critical should be closed before an external audit. This checklist supports preparation and does not replace the governing specification or customer requirements.

Furnace due dates that block overdue work

Optional: we can review how calibration and survey due dates connect to work order release in your ERP.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Work through each group furnace by furnace, with the actual records in front of you rather than from memory. Tick an item only when you can show the document, chart or certificate. Items marked critical are those that most often lead to major findings. Print the checklist or export it to Excel to assign owners and due dates for open items. Repeat before each audit and after any major furnace repair or control change.

  • Check records, not recollection
  • Close critical items first
  • Assign an owner and date to each open item

What the standard is about

AMS2750 is the aerospace pyrometry specification, and customers and Nadcap use it to judge heat treat process control. In outline it classifies furnaces by uniformity and instrumentation type, then sets how often system accuracy tests (SAT) and temperature uniformity surveys (TUS) must be done, how sensors must be calibrated, and which records must be kept. The exact classes, tolerances and intervals are in the current edition and in each customer spec, so use the standard itself for the numbers. This checklist only checks that you have a defined, documented and followed system.

  • Furnace class and instrumentation type set the test intervals
  • SAT checks the control chain against a reference sensor
  • TUS maps temperature variation across the working zone

Common findings and ERP angle

Typical audit findings include overdue tests, a furnace used for a job that needs a tighter class than it holds, missing correction factors, sensors reused beyond limits and load records that do not tie to the certificate. Many of these are scheduling and data problems. Put furnace due dates into the maintenance or calibration module so work orders cannot be released to an out-of-date furnace, and link the load record to the lot so the certificate pulls the real cycle data.

  • Block scheduling on an overdue furnace test
  • Tie load records to lot and certificate
  • Track thermocouple reuse counts

Frequently Asked Questions

What does AMS2750 cover?

It is an aerospace specification for pyrometry in heat treatment. It covers furnace classes, instrumentation types, thermocouple calibration, system accuracy tests, temperature uniformity surveys and records. The current edition and customer flow-downs define exact tolerances and intervals.

What is the difference between SAT and TUS?

A system accuracy test compares the furnace control or recording sensor against a calibrated test sensor to check measurement error. A temperature uniformity survey places sensors across the working zone to measure how much temperature varies. Both have required intervals.

Is this checklist enough to pass a Nadcap audit?

No. It helps you prepare and find gaps. Passing depends on meeting the full specification, customer requirements and the audit criteria in force, plus having a working system with records that stand up to review.

How often should I run this checklist?

Run it before every external audit, after furnace repairs or controller changes, and at least once a year as part of internal audits. Some shops run it quarterly on the highest risk furnaces to catch overdue tests early.

If your furnace due dates, load records and certificates are kept in separate places, we can help link them in your ERP or maintenance system so overdue tests block work. This checklist is free and needs no sign-up.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

Manufacturing hubs

TermsNadcap